Get complete information related to latest Oxygen Pipe Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Oxygen Pipe Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Oxygen Pipe Tenders.
Tender For supply, installation, testing & commissioning of oxygenpipeline in wagon component shop/goc as per scope of work & drg no. goc/p/sk - 3 - 45280 [ warranty period: 30 months after the date of delivery ]
Tender For erection and commissioning of electrical and c and i works for fgd at north chennai stage ii - erection, testing and commissioning and trial operation including supply and application of final painting and handling of materials at site bhel stores / client stores/ storage yard, transporting to site of erection of electrical, c&i works for flue gas desulphurization (fgd) system at 1 x 800 mw north chennai thermal power plant stage-iii, chennai.
Tender For bid to ras providing of custom bid for services - processing of tundish skull 5 items -processing of tundish skull processing of ladle skull and other skulls transport of flue dust processing of ss scrap removal and shifting of used bricks & debris
Tender For tender for supply of 3410000172 expansion bellow : - exp.joint , 2014x2014-100mm w , ej18fg1 , complete assembled unit with bellows , fabric and bolester , baffle plates , flanges and fastners etc as per drawing no. kem.0160.03. , exp.joint , 2874x2874-100mm w , ej19fg2 , complete assembled unit with bellows , fabric and bolester , baffle plates , flanges and fastners etc as per drawing no. kem.0160.03. , exp.joint , non metal.2472x3366-100mm w , ej20fg2 , complete set with bellows , fabric and bolester , baffle plates , flanges and fastners etc as per dwg kem.0160.03 , flue gas non metallic expansion joint bellow-ej 22 fg4/ej 23 fg4/ej 24 fg5/6 , complete set with bellows , fabric , bolester , baffle plates , flanges , fastners etc as per dwg kem.0160.03 , 2544x2544 , l100mm , s200mm , flue gas non-metallic expansion joint bellow - ej 25 fg7 , complete set with bellows , fabric and bolester , baffle plates , flanges and fastners etc as per dwg kem.0160.03 , 3314 x3314 , l 125mm , s 225mm. , flue gas non metallic expansion joint bellow-ej 26 fg7 , complete set with bellows , fabric and bolester , baffle plates , flanges and fastners etc as per dwg kem.0160.03 , 3314 x3314 , l 150mm , s 250mm. , hot air non metallic expansion joint bellow-ej 04 ha2 , complete set with bellows , fabric and bolester , baffle plates , flanges and fastners etc as per dwg kem.0160.01 , 2384 x 2384 , l 100mm , s 200mm. , exp.joint , non metal.2082x2082-125mm w , ej05ha3 , complete set with bellows , fabric and bolester , baffle plates , flanges and fastners etc as per dwg kem.0160.01. , hot air non metallic expansion joint bellow- ej 15 ha7 , complete set with bellows , fabric and bolester , baffle plates , flanges and fastners etc as per dwg kem.0160.02 , 1052 x 2252 , l 100mm , s 200mm. , nonmetallic expansion joint -gb1001 discharge complete with bellows , baffle plates , fastners etc. size 1800x1400x330mm , & drg(no. e g3-apc-940092-2 , hot air non metallic expansion joint bellow fabric and bolster- ej 16 ha7 , open belt without bolt holes punched , dimension 1052 x 1 452 , l 100mm , s 200mm , dwg no kem.0160.02 , exp.joint , non metal(only bellow) , 1264 x 3264 - 100mm , as per drg 01 , exp.joint , non metal.2082x2082-125mm w , ej07ha3 , exp.joint , non metal.1996x1996-100mm w , ej01ca4 , exp.joint , non metal.1824x1824-150mm w , ej06ha3 , exp.joint , non metal.1552x1552-150mm w , ej12ha5 , exp.joint , non metal.1552x1552-125mm w , ej13ha5 , exp.joint , non metal.1264x3264-100mm w , ej02ha1 , exp.joint , non metal.1152x2112-100mm w , ej09ha4 , exp.joint , non metal.1152x2082-100mm w , ej10ha4 , hot air non metallic expansion joint bellow fabric and bolster- ej 08 ha4 , open belt without bolt holes punched , dimension 1152 x 1 732 , l 100mm , s 200mm , dwg no kem.0160.01 , exp.joint , non metal.1052x2952-150mm w , ej14ha6
Tender For transportation of flue dust from jsw steel ltd, salem works, pottaneri to tnpl cement plant at kagithapuram through truck or tipper (10 wheel tipper)
Tender For corrigendum : extractive ndir (non-dispersive infrared) type flue gas analyzers required for continuous emission monitoring systems installed at ktps v and vi stages stacks
Tender For fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur furnace , makin
Tender For corrigendum : replacement of damaged insulation and cladding of flue gas ducts, primary, secondary air ducts, boiler outer casing and external piping of unit-3 and 4 boilers of stage-ii during annual overhaul period, regular and break down maintenance works for the year 2026-27