Get complete information related to latest Partition Frame Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Partition Frame Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Partition Frame Tenders.
Tender For supply of description of work station -l shape size : 72 inch x 72 inch x 60 inch, top material : table top made of25mm thick pre laminated particle board covered with pvc hot pressed lipping of profile, soft board one side & white board one side. modular partition : 60mm thick partitionframe work made out of 1.2mm aluminium with 50 microns powder coating, designed to carry out electrical power & computer wiring in 2 different race ways, electric switch socket board 2x6 amp(2 nos), particle board grade ii & type-ii (is12823: 1990; reaffirmed 2005) finished with 0.8 mm thick laminate,02 padastal unit with 03 drawer &locking arrangement [ warranty period: 12 months after the date of delivery ] ]
Tender For supply of site clearance and amp earthwork is 1200,kero heater,pcc is456,rcc m20 footing and column and slab,reinforcement steel fe500,brickwork 230mm is1077 and flooring anti skid,internal plaster 12mm,doors flush and windows alluminum and glass,electrical led and wiring,plumbing and sanitary,ceiling gypsum vip,painting exterior and interior external lighting and poles,water supply tank and pump,transportation and logistics remote area,contingencies and solar panel 5kva and invertor and battery 5kva,generator 5 kva electrical led and wiring is 732,mirror 5 h 2w ft and bench 5 h 2w ft,chair plastic with arm,toilet sheet western with exhaust fan and water faucet and hand jet assy,electric fitting work,changing room 6 by 6 by 10 ft and bathroom 6 by 6 by 10 f,multipurpose hall structure,chair vip sofa and centre table,podium and tt table and carrom set,yoga mats fire extinguisher,86 inch interactive pannel,drainage and cement road work tin shed wk on viewer seating iron poles and tin sheet hooks screw and iron channel,gr
Tender For supply of set of frp panels for partitionframe for memu/dmc 3-phase coaches.coating type pu paint system to mdts-118,colour shade to ral-9001,matt finish gloss value 10-12 at 45 degree as per l no.md 22151 dated 18.06.19. as per design office l.no. md21896 dated 03/10/2022 mdts-133 rev. 05 is applicable in lieu of icf/md/spec-167a mentioned in thedrawings. as per set list no-: mcf mpfpf-3phdmc version-0. colour shade for frp partition panels shall be ral-9001 with matt finish gloss value 10-12 at 60 degree. packing instruction no.pi112 ver2.0. [ warranty period: 72 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For auction sale of depot ferrous scrap - p.l.no. 98057054. scrap melting gr-d consisting of cutting sol bar, fall plate, head stock, cutting outside panel, ceiling fan down rod, wagon door & body cutting part, driver seat assy. , trough floor, electrode holder, cab window assy. cyclostyling machine, trolley, plate cutting, angle cutting, iron axle with pipe, cover of tail light head light flasher etc, tie bar fencing, pipe cutting, structure cutting, cut pieces of rod, damage emu door, lubricating felt assembly frame, mvmt,tmb,emu, mvsi impeller, mvsi duct, air duct, fan chamber, electrical pillar box, compression spring of bk cylinder, inter/after cooler tube type, lid of grease drums, partitionframe, cattle guard, ms base, l.t.pannel box ferrous, , tap changer, expanded metal, vsb packing, bs door, iron window, ms rod , fire extinguisher, gate, nut , bolt, washer, wick felt carriers, pin, angle frame with or without net, r.s. joint, ms iron plate, angle, door shutter, cutting chain, net box, fencing wire and such materials fit for melting gr-d, except p-way materials such as rail, fish plate and non ferrous etc. note-some items are attached with negligible quantity of ss. qty-80mt.location-west of 40 ton weighbridge, east of inner boundary wall. condition-two days advance cutting is allowed for loading purpose only.
Tender For supply and installation of one coach set of body shell items and floor supports for lwfac/pp2 (827) to the following drawing nos: 1. 82710002 alt 'b'- 1 no 2. ssa10018 alt 'nil'- 4 nos 3. aaa10972 alt 'a' - 4 nos 4. aaa10967 alt 'nil'- 2 nos 5. aaa10963 alt 'nil'- 2 nos 6. aaa10488 alt 'c' - 4 nos 7. aaa10970 alt 'nil'- 4 nos 8. 58110017 alt 'c' -2 nos 9. aaf10937 alt 'nil'- 3 nos 10.aab10007 alt 'a' - 4 nos 11.82710001 item 20 alt 'b' - 12 nos 12.aab10333 alt 'nil'- 4 nos 13.aab10331 alt 'nil'- 1 no 14.aab10332 alt 'nil'- 1 no 15.aab10338 alt 'nil'- 12 nos 16.82710012 alt 'nil' - 1 no special condition : the chair pillars shall be packed in the container as per icf/j&t/sk-1865, alt 'a'. partitionframes not fitting in the container shall be stacked one over the other, secured using packing strip and placed in steel pallet. the height of each stack shall not exceed 750mm for easy handling. suitable and sufficient packing strips to be used such that stacked items do notdisintegrate during transit, storage and handling. (safety item). [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For shell kit for memu ndmc jk 962 a. roof assembly 96216001 000 01 alt "a" - 1no location of sidewall 96214001 000 01 alt "nil" - 1 no end construction pail end 94515001 000 01 alt "a" - 1no end construction shunting desk side 96215001 000 01 alt "nil" - 1 no firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315,issue status 01, rev.00 with amendment no 01. b.supply of one coach set of body shell items and partitionframes for memu ndmc jk 962 to drawing nos 1. 96210002 000 01 alt "b" - 1 no 2. 96210007 000 01 alt "b"' - 1 no 3. 96210026 000 01 alt "nil"- 1 no 4. 96210046 000 01 alt "nil"- 1 no 5. 96210064 000 01 alt "nil"- 1 no 6. 94410054 000 01 alt "nil"- 2 nos 7. 94410076 000 01 alt "nil"- 1 no 8. 94410072 000 01 alt "nil"- 1 no c. under frame arrangement 96211001 000 01 alt 'd' - 1 no firm shall fulfill the manufacturing facility as per icf/md/spec-147,issue status 01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'f'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the under frame should be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. (a) raw material stage #ensure the raw material used using portable spectrometer (b) jig stage #assembly of front part with sole bar. #assembly of modular frame arrangement. #weld parameters to be checked & recorded (c) trestle stage #marking, drilling & tapping of holes wherever necessary. #marking & placing of detail items. #complete welding wherever necessary. #weld parameters to be checked & recorded #assembly & welding of trough sheets. #dimensional & visual checks. #punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. #short/sand blast to the requirements. #painting process as per the specification. #visual inspection. #final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For corrigendum : shell kit for memu ndmc jk 962 a. roof assembly 96216001 000 01 alt "a" - 1no location of sidewall 96214001 000 01 alt "nil" - 1 no end construction pail end 94515001 000 01 alt "a" - 1no end construction shunting desk side 96215001 000 01 alt "nil" - 1 no firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315,issue status 01, rev.00 with amendment no 01. b.supply of one coach set of body shell items and partitionframes for memu ndmc jk 962 to drawing nos 1. 96210002 000 01 alt "b" - 1 no 2. 96210007 000 01 alt "b"' - 1 no 3. 96210026 000 01 alt "nil"- 1 no 4. 96210046 000 01 alt "nil"- 1 no 5. 96210064 000 01 alt "nil"- 1 no 6. 94410054 000 01 alt "nil"- 2 nos 7. 94410076 000 01 alt "nil"- 1 no 8. 94410072 000 01 alt "nil"- 1 no c. under frame arrangement 96211001 000 01 alt 'd' - 1 no firm shall fulfill the manufacturing facility as per icf/md/spec-147,issue status 01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'f'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the under frame should be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. (a) raw material stage #ensure the raw material used using portable spectrometer (b) jig stage #assembly of front part with sole bar. #assembly of modular frame arrangement. #weld parameters to be checked & recorded (c) trestle stage #marking, drilling & tapping of holes wherever necessary. #marking & placing of detail items. #complete welding wherever necessary. #weld parameters to be checked & recorded #assembly & welding of trough sheets. #dimensional & visual checks. #punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. #short/sand blast to the requirements. #painting process as per the specification. #visual inspection. #final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply and installation of set of honeycomb partitionframe for ac 3tier lhb eog coaches to drawing no. mplhcpf3aceglhb version.24. & attached annexure. [ warranty period: 72 months after the date of delivery ] ]
Tender For corrigendum : shell kit for memu tc2,tc3,tc4 jk 942,943,945 a. roof assembly 94516001 000 01 alt 'nil' - 1 no. location of sidewall 94514001 000 01 alt 'nil' - 1 no. end construction pail end 94515001 000 01 alt 'a' - 1 no. end construction non pail end 94515002 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status.01, rev.04 with amendment no.01 firm shall fulfill themanufacturing facility as per icf/md/spec- 315, issue status.01, rev.00 with amendment no.01. b.supply of one coach set of body shell items and partitionframes for memu/tc/jk 941 to drawing nos: 1. 94410076 000 01 alt 'nil' - 2 nos. 2. 94510007 000 01 alt 'b' - 1 no. 3. 94510002 000 01 alt 'a' - 1 no. 4. 94410072 000 01 alt 'nil' - 2 nos. 5. 94410054 000 01 alt 'nil' - 4 nos. c. under frame arrangement 94211001 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/spec-147, issue status.01, rev.02with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'f'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe should be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. (a)raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item ]
Tender For shell kit for memu tc1 jk 941 a. roof assembly 94516001 000 01, alt 'nil' - 1 no. location of sidewall94514001 000 01, alt 'nil' - 1 no. end construction alarm end 94515001 000 01, alt 'a' - 1 no. end construction non alarm end 94515002 000 01, alt nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315, issue status.01,rev.00 with amendment no 01. b.supply of one coach set of body shell items and partitionframes for memu/tc/jk 941 to drawing nos: 1. 94410076 000 01 alt nil -2 nos. 2. 94510007 000 01 alt 'b' - 1 no. 3. 94510002 000 01 alt 'a' - 1 no. 4. 94410072 000 01 alt nil - 2 nos. 5. 94410054 000 01 alt nil - 4 nos. c. underframe arrangement 94111001 000 01, alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/spec-147, issue status.01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201,alt 'f'. packing as per icf/j&t/sk-1809,alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframes hould be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. stage inspection. (a) raw materialstage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item] [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]