Web Analytics Made Easy - StatCounter

Petroleum Coke Tenders

Get complete information related to latest Petroleum Coke Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Petroleum Coke Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Petroleum Coke Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

corporations/Associations/Others

CTN :45084622 Due date: 19 Jun, 202619 Jun, 2026 3.13 Crore
Tender For bid to ras providing of custom bid for services - fabrication and replacement of coal bunker shell for unit 7 and 8 mtps dvc

State Government

CTN :45312115 Due date: 18 Jun, 202618 Jun, 2026 35.42 Lacs
Tender For corrigendum : work contract for inspection repairing and painting of coal bunker of boiler of unit 1 at 2x600mw, sstpp, mppgcl, dongalia.

State Government

CTN :45290520 Due date: 22 Jun, 202622 Jun, 2026 8.57 Lacs
Tender For corrigendum : work contract for picking and transportation of muddy coal evacuated from coal mills/rcf/coal bunker and its surrounding area and transportation to specified location for unit 3 and 4 at 2x660 mw units of sstpp, mppgcl, dongalia.

State Government

CTN :45525068 Due date: 29 Jun, 202629 Jun, 2026 41.51 Lacs
Tender For routine monitoring / preventive maintenance / breakdown / emergency /regular servicing of pneumatic cylinders, solenoid valves, limit switches & pressures switches pertainsto units-5,6 &7 mill reject handling system(mrhs).operation and maintenance of dense phase mill reject handling systemof unit-8.the work involves-a)operation and maintenance of dpmrhs plc systemb)i&c maintenance works of air compressor.c)servicing/re-calibration of solenoid valves,limit/proximity switches & pressures switches etc.routine monitoring/maintenance of spm analyzer systemspertains to unit-5 to 8.the work involves-a)operation and maintenance of dpmrhs plc system.b)i&c maintenance works of air compressor.c)servicing/re-calibration of solenoid valves, limit/proximity switches & pressures switches etc.routine monitoring/maintenance of spm analyzer systems pertains to unit-5 to 8.the work involves-a)cleaning/servicing of transmitters & reflector units and blower filters of spm analyzers, pertains to units-5 to 8.b)carrying out maintenance works under the supervision of i&c engineerregular monitoring/checking healthiness of unit-7&8 coal bunker level monitoring systems.routine maintenance of bunker level monitoring systems.the work involves- a) cleaning/checking of 3d level sensors.b) cleaning/checking healthiness of local control panel at bunker floor.c) ensuring healthiness of signals to control room pc,dcs&chp control room digital indicators.regular monitoring/maintenance of hfo tanks level measurement systems.the work involves-a)cleaning/checking healthiness of radar level transmitters installed at hfo tanksb)cleaning/checking healthiness of local digital indicators installed at foph.c)cleaning/checking healthiness of plc unit installed at unit control room-7.the nature of work is round the clock maintenance.the cleaning/servicing and maintenance works of all the above mentioned systems shall be carried out during units aoh period.the required t&p and ppe for carrying out maintenance works shall be arranged by the contractor/agency itself.

State Government

CTN :45525231 Due date: 17 Jun, 202617 Jun, 2026 NA
Tender For annual contract for work of coal bunker scrapping of unit - 3 to 4 at cstps.

CTN :45541918 Due date: 08 Jul, 202608 Jul, 2026 NA
Tender For calcined petroleum coke powder as per annexure

CTN :45502352 Due date: 17 Jun, 202617 Jun, 2026 NA
Tender For calcined petroleum coke powder as per annexure

CTN :45519473 Due date: 17 Jun, 202617 Jun, 2026 NA
Tender For calcined petroleum coke powder as per annexure

CTN :45321497 Due date: 19 Jun, 202619 Jun, 2026 28.80 Lacs
Tender For corrigendum : supply of spares of soot blowers of (2x600 mw), katpp, rvunl, jhalawar-design, fabrication, supply and installation of fabricated manhole door with rearranging bends & tubes accordingly of boiler unit#1&2 (2x600mw), katpp, rvunl, jhalawarfabrication and supply of id fan guide vane at katpp, rvunl, jhalawarsupply & erection testing and commissioning of the high mast lighting system (hmls) at colony and plant premises walls at katpp, rvun, jhalawarsupply of spares of soot blowers of (2x600 mw), katpp, rvunl, jhalawarsupply and commissioning of electric wire rope hoist at id fans area in 2x600 mw katpp, jhalawarsupply of horizontal centrifugal pump for unloading 98% concentration sulfuric acid and sulfuric acid dosing pumps installed in cw chemical dosing system at, katpp, jhalawarsupply of pvc hot water distribution pipes and fittings of ndcts for unit 1 and 2 at katpp, jhalawarsupply of spares for dust suppression system for coal stock pile and conveyer system in chp, katpp, jhalawarsupply of spares for parker and hugland make hydraulic power pack of stacker cum reclaimer of chp at katpp rvun, jhalawarsupply of coupling and coupling spares for katpp, jhalawarprocurement of sf6 gas (with cylinder) of 99.9% purity for 400kv, 220kv & gcb circuit breakers at katpp, jhalawarprocurement of various testing equipments used for transformers, protection relays, and circuit breakers of unit#1 & 2 katpp, jhalawarsupply of spares of coal feeder eg3690 sr. no. 2010-109 (make- shenyang stock electric power equipment co. ltd., china) of 2x600 mw units, katpp, jhalawarsupply, fabrication and installation of gas regulating damper flaps, box support & partition plate in boiler at katpp, rvunl, jhalawarprocurement of paper ream of a4 size (75 gsm) for fy 2026-27, katpp, rvunl, jhalawarsupply, installation, testing and commissioning of high performance energy chain system in place of reeling drum of cable system in bunker travelling. tripper-2 at chp, katpp, jhalawarsupply of inline booster pump for dust suppression system at wagon tipplers in chp at katpp, jhalawarss erw pipe and fittings for sg fill pump to cpu unit# 1 and for other site purpose at katpp, rvunl, jhalawarpurchasing of rtds and thermocouples installed at 2x600mw, katpp, rvunl, jhalawar

State Government

CTN :45439203 Due date: 15 Jun, 202615 Jun, 2026 11.09 Lacs
Tender For work of hammering and poking of coal bunker in all three shift during rainy season in unit 1,2,3 and 4 of ph-i n ph-ii at sstpp, mppgcl, dongalia, dist. khandwa - work contract of hammering and pocking of coal bunker in all three shift during rainy season in unit # 1,2,3&4 of ph-i & ph-ii at sstpp, mppgcl dongalia, distt. khandwa.
 Loading, Please wait...

Connect us via What's Up