Web Analytics Made Easy - StatCounter

Pillow Block Tenders

Get complete information related to latest Pillow Block Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Pillow Block Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Pillow Block Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :43099688 Due date: 27 Dec, 202527 Dec, 2025 NA
Tender For bid to ras supply of carbon steel forging : :-- l.j.housing (hy-802.09) - rough mcd forging as per drg. hy-802.09.f rev-02 with matl as per specn. aa19332/10, u.j. housing (hy-312.a.05.x) - rough m/cd forging as per drg. 36100090168/01 with matl as per specn. aa19332/10, journal shaft (hy-311.a.05.f) - rough m/cd forging as per drg. 36100090171/01 with matl as per sepcn. aa19332/10, upper journal housing (hy-902.03.f) - rough m/cd forging as per drg. no. 36108802393/01 with matl as per specn. aa19332/10, journal shaft (hy-902.01) - rough m/cd forging as per drg. νο. 36108802391/01 with matl as per specn. aa19332/10, r/mcd forging of journal shaft (hy-1101.09.f) as per drg. 36100490184/01 with matl. as per specn. aa19332/10, r/mcd forging of trunion shaft (hy-1102.01) as per drg. 46100490249/00 with matl. as per specn. aa19332/10(bhel hyd matl code ba9413253250), l.j. housing (hy-312.a.02) - rough machined forging as per drg. hy-312.a.02.f with matl as per specn. aa19332/10

corporations/Associations/Others

CTN :43287647 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin

corporations/Associations/Others

CTN :43287648 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 2f and reassembling the dismantled spares in mill 1c - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin

CTN :43303644 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For supply of journal head assembly for hp803 bowl mills in complete assembled condition with trunnion shaft, pillow block, trunnion shaft bushing.

Central Government/Public Sector

CTN :43016572 Due date: 27 Dec, 202527 Dec, 2025 NA
Tender For corrigendum : supply of modern feed processing plant : : -modern feed processing plant , hammer mill screen , hammer set , bearing , bracket , adapter sleeve , hexbol full thread , guard plate , coupling tyre , pillow block bracket ucp 208 fk , hammer mill rod 1 set , buckets of bucket elevator , bucket bolt , flat belt 10 mtr

Central Government / Public Sector

CTN :43054081 Due date: 31 Dec, 202531 Dec, 2025 NA
Tender For corrigendum : supply of pillow block bearing

Central Government/Public Sector

CTN :43139105 Due date: 29 Dec, 202529 Dec, 2025 53.85 Lacs
Tender For corrigendum : supply of plain spherical bearing 142 010 b1130 , seal kit for roll back cylinder 142 020 20510 15 , seal kit for boom lift cylinder 142 020 20509 14 , seal kit for steering cylinder 142 050 52109 , transmission 142 060 60300 , rear mechanical 6c drive shaft 142 060 60600 , middle mechanical 6c drive shaft 142 060 60700 , front mechanical 6c drive shaft 142 060 60800 , pillow block bearing 142 060 63900 , spider assly 142 060 61300 , bolster bush 142 050 51000 , twin section oil cooler 308lc 050 50405 , driven sprocket 142 050 50303 , drive sprocket 142 050 50304 , vertical roll 142 050 50309 , horizontal roll 142 050 50311 , slip ring assembly 142 050 50301 11 , pilot operated d c valve 4 section 274 040 41002 , element for inline pressure filter 8010002 , return line filter element 9010001 , seq. pressure valve 222 060 62204 , suction strainer 142 040 41024 , wheel stud 142 060 60145 , wheel nut 142 060 60147 , o ring 123201 060 60166 , back up ring 123201 060 60168 , o ring 123201 060 60173 , back up ring 123201 060 60174 , o ring 123201 060 60185 , flange 142 060 60132 , hex head bolt hhb136720270 , hex head bolt hhb136720290 , hex nut 136420 , seal 123229 060 60182 , seal 123229 060 60181 , steering cylinder assly 142 050 52100 , priority unloading valve 274 hpe simp 01 01 , relief valve 274 hpe simp 01 02 , check valve for priority unloading manifold block 274 hpe simp 01 03

Central Government/Public Sector

CTN :43141401 Due date: 29 Dec, 202529 Dec, 2025 37.24 Lacs
Tender For corrigendum : supply of spare for lhd 811 c c - hydraulic pump 811b050000101 , filter assy eea0005879 , suction strainer 625b050000122 , drive line rear 811b050000130 , clutch outer disc eea0005788 , clutch inner disc eea0005787eea0005787 , clutch inner disc eea0005829 , roller 811a050000104 , roller 811a050000103 , cable reel valve assy 250c050000011 , relief valve eea0009580 , spider assy 811m100000417 , throttle cable assly 811b050000123 , pillow block bearing 811a050000143 , transmission cable assembly 811b050000122 , axle bolt 912a060000171 , brake disc eea0015464 , brake disc eea0015470 , intermediate back disc eea0021744 , brake disc eea0021745 , nut eea0015492 , back up ring eea0021738 , filter element eea0003479 , pressure reducing valve 611a050000004 , sprocket 811b060000149 , sprocket 811b060000150 , axle bolt 912a060000170 , back up ring eea0015472 , back up ring 12wla189654a , o ring 12wla189653a , relief cartridge eea0008997 , intermidiate brake disc eea0021749 , priority valve 625a000003070 , twin cooler assembly 811c050000102 , kit drive plate eea0010872 , clutch piston assy eea0010879 , clutch piston assy eea0010878 , seal eea0015404 , o ring eea0015473 , o ring eea0015477 , o ring eea0015479 , accumulator 1 ltr 811a050000192 , seal kit eea0020978 , seal kit eea0020994 , seal kit eea0020991 , seal kit eea0019110 , o ring eea0015441 , o ring eea0015389 , drive shaft m 811b060000174 , clutch piston assembly eea0010880 , relief valve assy 625b050000064 , bush 625a000003260 , bush mbh 150 170 140a , flight bar and link assembly 811b070000456

Central Government And Public Sector

CTN :43291256 Due date: 21 Jan, 202621 Jan, 2026 NA
Tender For supply of heavy duty pillow block with double row.

Central Government And Public Sector

CTN :43095044 Due date: 29 Dec, 202529 Dec, 2025 NA
Tender For corrigendum : supply of upper journal housing
 Loading, Please wait...

Connect us via What's Up