Get complete information related to latest Pinion Shaft Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Pinion Shaft Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Pinion Shaft Tenders.
Tender For corrigendum : supply of input pinionshaft , oil seal for input shaft , bavel pinion , key for bovel pinion , 2nd reduction for pinionshaft , bavel wheel , key for bavel wheel , oil seal f2nd reductn pinion sft , final reduction pinionshaft , 2nd reduction wheel , key for 2nd reduction wheel , output shaft , final reduction wheel , key for final reduction wheel , oil seal for output shaft
Tender For supply of pinionshaft 20 teeth for wap-7 loco as per rdso specification no. mp.0.2800.19(rev-1) june-2019 or latest and rdso drawi ng no. skdp 3473 alt-4 or latest. [ warranty period: 30 months after the date of delivery ]
Tender For supply of machinery parts as per drawing year 2025-26 - m.s. roller for mud conveyor as per drg. 1268/r-2 dated 22.06.09) od 100mmxlength 225mm, od 90mm.xlength 200mm, od75mm.x length 630mm, od 100mm x length 740mm, c.s. trash beam bottom bracket as per drawing no. b/2008/c-1357 dated 09.07.08 conversion basis, g.r. pressure feeder nose plates scrappers to be mfg. as per drawing no. b/94/c-1087/r-2 dated 05.06.09, g.r. pressure feeder nose plates scrappers to be mfg. as per drawing no. b/94/c-1087/r-2 dated 05.06.09, on conversion basis., cast steel swing arm left hand/right hand (gear side) all over machined as per drawing no. b/2002/c-1265/r-2 dated: 22.4.2009, en-19 forged steel spur gear pinion having machine cut teeth for cane unloader, as per drawing no. b/2001/c-1256/r-1, 33 teeth., en-19, forged steel spur gear pinion having machine cut teeth for cane unloader, as per drawing no. b/2001/c-1256/r-1, 68 teeth., c.s.bearing housing with fitted 02 nos. locking camp. plate for roller shaft for mill (all over machined) to be manufactured as per drawing no. b/93/c-1011/r-2 dated: 13-06-2009 material cast steel is: 1030 grade 27-54, dismentling of chopper tubs and replacement of worn out hubs by new hubs, fitting and balancing as per drg. no. b/05/c-1129/r-1, replacement of bronze linner of mill hydralic cap, machining, buffering, fitting & testing., c.s.sprocket on conversion basis as per drg. no. b/94/c-1056, maching of transmission gear shaft from old shaft as per drg. no. b/2001/c-1258/r-1(material-cl-4, is-2004), c.s double sprocket 76 teeth for welding & machining with teeth cutting, c.s double sprocket 25 teeth for welding & machining with teeth cutting, pinion 38 teeth of new main bagasse carrier chain, pinion 25 teeth of new return bagasse carrier chain, pinion 52 teeth of old main bagasse carrier chain, pinion 25 teeth of old main bagasse carrier chain, worm & worm wheel for crystlizer as per drg. no. b/73/c-310, worm as per drg. no. b/75/c310, en-9 forged steel pin for mill a frame as per drg. no. b/2010/c-1377 dated: 12.06.2010. (2 section per pin), c.s. gr 26/52 is-1030 machined knife holder hub for cane leveler as per drg. no. b/2007/c-1337/r-1 dt. 17.07.2022 (without key), repair of links hole of block type chain, c.i. idler for cane carrier as per drg. b/2007/c-1340 on conversion basis with machining, repair of pinion teeth-38 of bagasse elevator, c.s. sprocket wheel 14 teeth for cane carrier head shaft maics-26/52, is 1030 as drg. no. b/94/c-1041/r2 dt. 20.06.2007, en-24 helical pinion with shaft no. of teeth-19, od-90mm, root dia-72mm,teeth face wide-180mm, total pinionshaft length-490mm as per sample, leaf spring supporting frame for grader as per drg. no. b/2022/c-1530. type-1 (spring steel flat size 75 x 8mm), en-9 steel shaft for mill house crane as per drg. no. b/2020/c-1571, mark-1, repair of chain block 02 ton cap., repair of chain block 01 ton cap., repair of chain block 05 ton cap., repair of chain block 03 ton cap., en-9 forged steel pin for mill a frame as per drg. no. b/2010/c-1377 dt. 12.06.2010 (2 section per pin), metalon/teflon ptef bush for rotary screen as per drg. no. b/2024/c-1562 dt. 04.07.2024, brass seat for juice heater double beat valve size 8 as per drg. no. b/2024/c-1564 dt. 14.07.2024
Tender For repairing of input shaft and intermediate pinionshaft (worn out teeth) of gear box of c4 conveyor in all respect, repairing of the fluid coupling t12-12 and removal of the bearing and gear coupling of the drive shaft including shifting of all the ma
Tender For custom bid for services - 30 mw & 14 mw tg miscellaneous works at nspcl-bhilai power plant-2- 10.10 tmstu61bd000 steam tur(bearing pedestal)attend defect: 1. take permit to work from concerned person., 2. remove control valve linkages, oil piping and other connections from the pedestal., 3. remove front pedestal top cover., 4. clean front pedestal housing., 5. take measurement as per instruction of eic. (involves checking of pinionshaft/gear, assembly, main oil pump gear wheel, gov. assembly & checking the backlash of gears.), 6. attend the defect/trouble shoot the problem in front pedestal as per instruction of eic., this includes the following work beside defect attending as per instruction of eic., 7. dismantle pinionshaft and record the alignment w.r.t to the gov. assembly., a) dismantle mop (main oil pump) bearings and gear., b) do servicing of mop and replace damaged items., c) dismantle governor assembly (consists of gop-governing oil pump and other, elements)., d) do servicing of gop and replace damaged items., e) assemble mop and governor assembly., f) put governor assembly in position., g) do alignment of the pinionshaft w.r.t to governor assembly., h) put electronic over speed shaft (pinionshaft) in position., i) put mop assembly in position., j) record backlash of gears and if requires, do adjustment., 8. measure the clearances of first three rows of oil gland fins & its servicing, 9. assembly of oil gland segments (new or old) and setting of clearances., 10. after the work, box up front pedestal top cover., 11. link control valve linkages, oil piping etc., 12. do rig test for setting governing characteristics., 10.20 tmstu56oh000 steam tur (bearings) serv- 1. take permit to work from concerned person., 2. remove control valve linkages, oil piping and other connections from the pedestal., 3. remove front pedestal top cover., 4. check bearing interference, toc, soc etc., 5. remove turbine front bearing top & bottom halves., 6. do the dpt and ut of turbine bearing., 7. check thrust bearing pads and do dpt, ut and blue matching., 8. check toc, soc, bearing interference of bearing after servicing., 10.30 tmstu01bd794 steam tur (<=30mw#) repl-gland- 1. removal of first 2 rows of hp front steam gland segments., 2. servicing of (new or old) gland segments and springs., 3. measurement of dimensions and machining of gland segments if required., 10.40 tmtgs01bd701 turbine gov. sys (<=30mw#) maintenance- i) attending passing defect in four nos. steam control valves, ii) servicing of two nos. hydraulic servomotors (including relay gear) of control valves, iii) inspection & servicing of speed governor and setting its governor characteristics (rig test)., iv) inspection & servicing of cies valve (left & right)., 1. ensure ptw from concerned person., 2. breaking of insulation around steam control valves & removal of debris from site., 3. dismantle linkages and decouple all four nos. control valves from spring box assembly, 4. remove spring box assembly from position., 5. dismantle bonnet bolts & remove all four control valves., 6. check blue contact / kerosene test of plug with respective seats., 7. do lapping of all control valves, replace plug/other components, if required., 8. assemble all control valves and tighten bonnet bolts., 9. servicing of cies valves (left & right), 10.servicing of spring box assembly hinges & pins etc., 11.place spring box assembly & couple all control vales with spring box., 12. servicing of two nos. hydraulic servomotors of control valves., 13. servicing of primary relay oil cylinder for checking for excessive draining of oil. replacement of relay gear power, piston if needed., 14. servicing of secondary relay., 15. servicing of linkage., 16. replacement of steam leak-off and impulse line pipes as per eic instruction. dp test of welding joints are to be, carried out., 17. inspection of speed governor, assessment of its component s healthiness, repl