Get complete information related to latest Pipe Layer Spares Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Pipe Layer Spares Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Pipe Layer Spares Tenders.
Tender For tender for supply, delivery, testing, commissioning and comprehensive operation and maintenance contract for 5 (five)years of soil compactor machines with pad foot drum 2 nos. for municipal solid waste management.
Tender For 1). supplying and installing new batteries for luminous make 4 kva 36 v inverter system 2 nos. in divisional office 2). supply, installation, commissioning and testing of gps based vehicle tracking and monitoring system (vtms) along with fuel tank level sensor for mahindra blazo tipper no. mh08 ap2045, mahindra blazo tipper no. mh08 ap2104, mahindra loader backhoe mh08g0199 and ace vibratory soil compactor
Tender For providing casing embankment using selected pervious material from approved borrow areas (government acquired land) in layers including cost of all materials, machinery, labour, all other operations suchas collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95% of proctor density using vibratory compactor including cost of water etc., complete with lead uptol km and all lifts as directed
Tender For bid to ras corrigendum : supply of black soil treatment to be done by watered and compacted with plate compactor to consolidate the base the existing top soil to br stripped to the required 150 mm under the ground level 144 ft x 72 ft , exacacvation of top soil up to depth not exceeding 150mm deep and getting sift soil leveling uneven ground with computerized leveling and creating slope 1 120 from centre toward two slides 144x72 ft , edge wall providing and fixingmasonry 6 inch to 9 inch wide and 24 inch height including grounded underneath around the perimeter of the court cement of mixer of 1 6 for construction of brick wall , 1 x 10 ft x 10 ft shed with 40mm profile sheet fixed on 35mm ms tube sporting verticle height of pole will be 9 ft from ground level and 2 ft under the ground for players seating , digital score board 3 x 2 with stand made with 35 mm ms tube , two hockey goal post with international size of net , four led light 100 watt 15 ft height from ground each flood light will have for led light of 20 ft lumen light , all the facilities will be under two year warrenty the same will be against fading peeling and cracking of the synthetic surface and defects in the flood lights set
Tender For corrigendum : request for bids for supply, installation and commissioning of slaughter house plant as per apeda standard - a: civil work items, dismantling the reinforcement cement concrete (r.c.c.) work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete., dismantling brick masonry in lime or cement mortar and stacking the material as directed with all leads, lifts etc., removing doors and windows with frames and stacking the materials as directed with all leads, lifts etc. complete., removing ventilators and small windows with frame and stacking the materials with all leads, lifts etc. complete., removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete, removing purlins from roof including stacking as directed with all leads , lifts etc. complete., removing rafters from roof including the materials as directed with all leads , lifts etc. complete., removing queen post truss from roof and stacking the materials as directed with allleads and lifts etc. complete, removing galvanized iron (g.i.) or asbestos cement (a.c.) sheet roofing including purlins, principal rafters etc. including sorting serviceable and unserviceable materials, stacking the same as and where directed in the compound including scaffolding etc. complete., excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.5 m.) by mechanical means, lift upto 1.50 m, excavation for foundation in hard murum including removing the excavated material upto distance of 50 meters beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.50 m) by mechanical means, lift upto 1.50 m, excavation for foundation in hard murum including removing the cubic meter (cu.m) excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift from 1.5 to 3.0m.) by mechanical means, excavation for foundation in soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (lift from 1.5m to 3.0 m.) by mechanical means, lift upto 3.0 m, excavation for foundation in hard-rock by blasting including cubic meter (cu.m) trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramming etc. complete. (lift from 1.5m to 3.0 m) by mechanical means, filling in plinth and floors with approved excavated materials available at site in 30 cm layers include- ing watering and compaction with plate compactor to required proctor density etc complete., filling in plinth and floors with contractors material/brought from outside and approved by engineer in charge in layers of 15 cm to 20 cm including watering and compaction etc. complete., providing dry trap / granite / quartzite gneiss 200 mm thick hard core metal spread in two layers each of 125mm thick crushed to 100 mm c