Get complete information related to latest Pivot Liner Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Pivot Liner Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Pivot Liner Tenders.
Tender For corrigendum : supply of center pivotliner horizontal to rdso drg.no.sk.dl-3255,alt-2,ref-1, material-non-metal lic, wear resistant, self-lubricated polyamide pa 6.as per rdso specification no.mp.0.40.99.02 (revisio n-01) of october-2012 for wap-4 loco. as per drg. no. rdso drg.no.sk.dl-3255, alt-2 [ warranty pe riod: 30 months after the date of delivery ]
Tender For auction sale of scrap sheared body scrap(l),scrap defaced engine (4w),scrap catalytic converter empty,scrap door with bonnet & boot trunk with glass and plastic,scrap glass,scrap tyres with and without rim (4w),scrap battery bulk (pcb category),scrap sheared body scrap (heavy),scrap wiring harness,scrap automotive seats,scrap fabric,scrap chassis scrap,scrap compressor,scrap alternator/ starter,scrap rubber-pcb category,scrap plastic (pcb category),scrap mix steel with dead axle, fuel tank etc,scrap brake booster w/o cylinder,scrap motor,scrap e-waste (pcb category),scrap alloy wheel,defaced engine scrap (cv),scrap tyres with and without rim (cv),scrap steering column w/o motor,scrap defaced cng/lpg cylinder,scrap catalytic converter-list attached
Tender For supply of set of pivotliners for bogie comprising of 1] liners [central pivot body ] to clws drg.no.01.4.12.18 alt.4 = 2 nos. [2] liners [central pivot bottom ] to clws drg. no.01.4.31.79 alt.1 = 2 nos. [3] liners for pivot bogie bottom to clws drg.no.01.4.31.80 alt. 2 = 2 nos. [4] liners central pivot [bogie side liner] to clws drg. no.01.4.12.12 alt.2 = 2nos. for wam4 and wag5 locos. [material specn. shall be is:3885 pt.i gr.i of 1992].
Tender For supply of bottom pivot friction liner (centre pivotliner) as per rdso drg. no. contr-9404-s-5, alt. 10, item no. 03. [ warranty period: 30 months after the date of delivery ]