Web Analytics Made Easy - StatCounter

Plant Machine Tenders

Get complete information related to latest Plant Machine Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Plant Machine Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Plant Machine Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :45530051 Due date: 23 Jun, 202623 Jun, 2026 NA
Tender For providing of leasing in of assets - wet lease (maintenance to be borne by lessor); plant &machinery; industrial ro plant (250lph) with chiller with 500 liter tank with complete installation on monthly rent basis; industrial ro plant with chiller; new; not applica..

Central Government/Public Sector

CTN :45488545 Due date: 30 Jun, 202630 Jun, 2026 44.60 Lacs
Tender For special repair/replacement of e/m installation plants/ machineries against ber and provn of 16 x heavy duty industrial cooler in tech sheds at 508 abw chheoki

corporations/Associations/Others

CTN :45493254 Due date: 23 Jun, 202623 Jun, 2026 NA
Tender For providing of custom bid for services - hiring of plant-machinery like hydraulic excavator tractor with trolley crane for miscellaneous dismantling work jungle cleaning rubbish removal etc at colony and old plant premises dtps dvc durgapur on the basis of as and w..

Central Government/Public Sector

CTN :45400085 Due date: 10 Jun, 202610 Jun, 2026 4.97 Lacs
Tender For one time repair of air cooling plant machine at swasthya bhawan, jaipur.

Central Government/Public Sector

CTN :45408881 Due date: 22 Jun, 202622 Jun, 2026 NA
Tender For annual maintenance, repairing and overhauling of plant machineries at sru bhandaridah

State Government

CTN :45384250 Due date: 06 Jun, 202606 Jun, 2026 18.09 Lacs
Tender For supplying of materials, tools , plants, machinery, tractor trolly , skilled and unskilled man power for repairing/ renovation and maintenance of existing structure including all fitting, fixing along with operation & maintenance of the entire works during shrawani mela -2026 for providing drinking water and sanitation services in temporary paritaran bus stand, bhalua bus stand & sarsa bus stand cleaning of along bus stand , installation/ operation and maintenance & other miscellaneous work all complete including manpower, materials and machinery mate etc entire area of temporary bus at bhalua/ paritarn/ sarsa stand and toilets along the road towards deoghar up to kothia bus stand bhalua, paritarn, sarsa all complete under d.w & s. division , deoghar. for the year 2026-27. group no: sm-06

State Government

CTN :45366408 Due date: 05 Jun, 202605 Jun, 2026 53.8 Thousand
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of nizar and kukarmunda taluka dist- tapi.- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete. (manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finisher etc. complete. (paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (paver finish) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (pave

State Government

CTN :45366425 Due date: 05 Jun, 202605 Jun, 2026 51.1 Thousand
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of uchchhal taluka dist- tapi.- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for ack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, o kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete (manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for ack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fin wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finishe etc. complete. (paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in on mayer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including mecessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying) , providing, laying & rolling 37.5 mm compacted thick b.m. in on mayer with b.t. aggregate as specified and using bitumen vg10 for took of of the roto of 3 elg/10cgmonducing bitume , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (paver finish) , providing & laying seal coat with b.t. agg. as specifed using agg. at the rate of 0.24 cu.mt/10sq.mt.and bitumen vg-30 for mixing agg. at the rate of 4.50% i.e. 45.00 kg/m.t. and 2.5kg/10 smt asphalt vg-30 for tack coat including heating & mixing in hot / drum mix plant & transporting & spreading the same by manual laying & consolidation with vibratory roller incl. , necessary firewoood, oil, lubricants, labour charges etc

State Government

CTN :45366438 Due date: 05 Jun, 202605 Jun, 2026 50.5 Thousand
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of ukai taluka dist- tapi.- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, a kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete (manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fin wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finishe etc. complete. (paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in on layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying) , providing, laying & rolling 37.5 mm compacted thick b.m. in on layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver , finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant. machineries and eginment , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt/10smt. stone chips for one miton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consolidation with vibratory roller with necessary equipments oil, kerosene fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt/10smt. stone chips for one miton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consolidation with vibratory roller with necessary equipments oil, kerosene fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (paver finish) , providing & laying seal coat with b.t. agg. as specifed using agg. at the rate of 0.24 cu.mt/10sq

State Government

CTN :45366458 Due date: 05 Jun, 202605 Jun, 2026 50.5 Thousand
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of valod taluka dist- tapi- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete. (manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finisher etc. complete. (paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt/10smt. stone chips for one miton as per specification, using the asphalt at rate 33.60 kg/m.ton (ie. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consolidation with vibratory roller with necessary equipments oil kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one miton as per considering 0.6 specification, using the asphalt at rate 33.60 kg/m.ton (ie. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consolidation with vibratory roller with necessary equipments oil kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (paver finish) , providing & laying seal coat with b.t. agg. as specifed using agg. at the rate of 0.24 cu.mt/10sq.mt.and bitumen vg-30 for mixing agg. at the rate of 4.50% i.e. 45.00 kg/m.t. and 2.5kg/10 smt asphalt vg-30 for tack coat including heating & mixing in hot/drum mix plant & transporting & spreading the same by manual laying & consolidation with vibratory roller incl. necessary firewoood, oil, lubricants, labour charges etc. using contractor's own drum mix plant, ma
 Loading, Please wait...

Connect us via What's Up