Get complete information related to latest Plasterboard Work Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Plasterboard Work Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Plasterboard Work Tenders.
Tender For yearly rate contract for various items of construction and supply for sutrapada, dist. gir somnath (second attempt) - excavation for foundation up to 1.5 meter depth including sorting out and stacking of useful materials and disposing of excavated stuff up to 50 meter lead a for loose or soft soil, excavation for foundation up to 1.5 meter depth including sorting out and stacking of useful materials and disposing of excavated stuff up to 50 meter lead b dense or hard soil, excavation for foundation for depth to 3.00 to 5.0 meter depth including sorting out and stacking of useful materials and disposing of excavated stuff up to 50 meter leadchard murrum, filling available excavated earthexcluding rockin trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidatind each deposited layer by ramming and watering, filling available excavated earthexcluding rockin trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each deposited layer by ramming and watering., white stone bela masonary block in course in super structure with stone of approved quality in cement mortar 1jem51 cement 5 course sandincluding racking the joint etc. complete., providing laying controlled cement concrete mper200 and curing complete including the cost of form work and excluding cost of reinforcement for reinforce concrete work in r.c.c. slab and landing, providing 15 mm thick cement plaster in single coat on fair side brickperconcrete walls fpr interior plastering up to floor two level and finished even and smooth with a floating coat of cement slurry. cement mortar 1jem41 cement 4 sand, providing and laying reinforcement for r.c.c. work and bending andplacing in position completed p to floor two level thermo mechanical treated barscrsas per i.s. standard, 20 mm thick sand faced cement plaster on walls up to height 10 meters above ground level consisting of 12 mm thick backing coat of c.m. 1jem31 cementjem 3 sandand 8 mm. thick finishing coat of c.m. 1jem11 cementjem 1 sandetc. complete., providing and laying ceramic tiles 6mm thick in flooring treads of steps and landing laid on a bed of 12mm thick cement mortar 1jem31percementjem 3percoarse sandfinishing with flush pointing in white cement.up to 10 ton, providing and laying coloured glazed tiles of the size 300mm x 200mm x 8mm per300mm x 450mm x 8mm in flooring treads of steps landings skirting risers of steps anddado on 10 mm thick cement plaster 1jem31percementjem 3percoarse sandandjointed with white cement slurry., providing and laying 24x 24 vitrified 8mm thick tiles flooring over 20mmaveragebase of cement mortar 1jem61 per cementjem 6percoarse sandon new surface of fixing on existing flooring by adhesive materials including dismantling of existing flooring and jointed with colour cement slurry including finished with flush pointing andcleaning the surface etc. complete for light shade, providing and laying granite slab in riser of steps dedo and pillars laid 10 mm thick cement mortar 1jem31 cement 3 sandand jointed with grey cement slurry including rubbing and polishing complete, providing and laying broken china mosaic flooring for terrace using 12 mm to 20 mm broken pieces of glazed tiles to be laid over cement mortar 1jem3 to plain or slope and to be tempered to bring mortar crme out up to surface using white cement including rounding off junctions and extending them up to 15cm along the wall clearing with water and oxalic acid etc. as directed, providing and fixing window having extruded aluminum colour anodized section frame main outer size 63.50 x 38.10 x 1.95 mmof jindal section nojem4605, wt 1.094 kg perrmt, horizontal two track member size 61.85 mm x 31.75 mm x 1.20mmof jindal section nojem 8687 wt. of 0.695 kgmt,vertical member of size 61.85 mm x 31.75mm x 1.30 mmof jindal section nojem8758 wt.of 0.0.659 kgpermtwith sliding shutters of horizontal member size 40mm x 18mm x 1.29mmof jindal section nojem 8949 wt.
Tender For corrigendum : repair and replacement of joinery, plumbing, sanitary roofing, masonary and other miscellaneous work in md accn of north complex under age b/r-ii at ima dehradun.
Tender For boundry wall with 2.0 normal height in brick masonary with intermediate rcc coloumn i.c. cost of all material, labour and t and p required for completion of work of new mahoi pump canal in tehsil madhogarh, jalaun (lot no.-2)
Tender For armo work to external area including plastering other miscellaneous masonary works and external painting of new airport colony mumbai during 2025 26
Tender For zone no. 32 (road zone- lc gates and station approach road etc.) under aen/bdc under the jurisdiction of sr.den/1/hwh. [description: overall percentage above/below/at par over the rates of cpwd-dsr-2021 items of engineering department on all chapters with up to date correction slips etc. [value rs. 5610000.00] note: 1. the tenderer is to quote only one rate against the tender. the advertised value is the departmental assessed value. 2. the departmental assessed value/advertised value has been chalked out considering at par with the basic cost of cpwd-dsr-2021 items. this denotes that no escalation over the basic cost has been considered in firming up the assessed cost for the instant tender. 3. for firming up the assessed cost/advertised cost of this zonal tender, contribution of i) earth work- 4% in chapter no. 2, ii) mortar- 2% in chapter no. 3, iii) concrete work- 4% in chapter no. 4, iv) masonary work- 4% in chapter no.6, v) steel work- 5% in chapter no. 10, vi) dismantling and demolishing- 1% in chapter no.15, vii) road work- 80% only 4. during execution, the respective schedules from the above mentioned percentage may be varied, if necessary is felt, with the approval of the competent authority. finance vetting if warraned, may also be sought for in this context. 5. the above instructions are only for guidance to the tenderers. tenders should consider the above aspects while quoting rates. 7) tenderers while quoting rates should quote the rates % above/below/at par w.r.t. the assessed/advertised value, as reflected against the respective schedules, considering escalation and effect of gst and other taxes as applicable.
Tender For zone no. 37 (road zone- lc gates and station approach road etc.) under aen/bhp under the jurisdiction of den/4/hwh. [description: overall percentage above/below/at par over the rates of cpwd-dsr-2021 items of engineering department on all chapters with up to date correction slips etc. [value rs. 6500000.00] note: 1. the tenderer is to quote only one rate against the tender. the advertised value is the departmental assessed value. 2. the departmental assessed value/advertised value has been chalked out considering at par with the basic cost of cpwd-dsr-2021 items. this denotes that no escalation over the basic cost has been considered in firming up the assessed cost for the instant tender. 3. for firming up the assessed cost/advertised cost of this zonal tender, contribution of i) earth work- 4% in chapter no. 2, ii) mortar- 2% in chapter no. 3, iii) concrete work- 4% in chapter no. 4, iv) masonary work- 4% in chapter no.6, v) steel work- 5% in chapter no. 10, vi) dismantling and demolishing- 1% in chapter no.15, vii) road work- 80% only 4. during execution, the respective schedules from the above mentioned percentage may be varied, if necessary is felt, with the approval of the competent authority. finance vetting if warraned, may also be sought for in this context. 5. the above instructions are only for guidance to the tenderers. tenders should consider the above aspects while quoting rates. 7) tenderers while quoting rates should quote the rates % above/below/at par w.r.t. the assessed/advertised value, as reflected against the respective schedules, considering escalation and effect of gst and other taxes as applicable.
Tender For zone no. 31 (road zone- lc gates and station approach road etc.) under aen/llh under the jurisdiction of sr.den/1/hwh. [description: overall percentage above/below/at par over the rates of cpwd-dsr-2021 items of engineering department on all chapters with up to date correction slips etc. [value rs. 5610000.00] note: 1. the tenderer is to quote only one rate against the tender. the advertised value is the departmental assessed value. 2. the departmental assessed value/advertised value has been chalked out considering at par with the basic cost of cpwd-dsr-2021 items. this denotes that no escalation over the basic cost has been considered in firming up the assessed cost for the instant tender. 3. for firming up the assessed cost/advertised cost of this zonal tender, contribution of i) earth work- 4% in chapter no. 2, ii) mortar- 2% in chapter no. 3, iii) concrete work- 4% in chapter no. 4, iv) masonary work- 4% in chapter no.6, v) steel work- 5% in chapter no. 10, vi) dismantling and demolishing- 1% in chapter no.15, vii) road work- 80% only 4. during execution, the respective schedules from the above mentioned percentage may be varied, if necessary is felt, with the approval of the competent authority. finance vetting if warraned, may also be sought for in this context. 5. the above instructions are only for guidance to the tenderers. tenders should consider the above aspects while quoting rates. 7) tenderers while quoting rates should quote the rates % above/below/at par w.r.t. the assessed/advertised value, as reflected against the respective schedules, considering escalation and effect of gst and other taxes as applicable.
Tender For zone no. 36 (road zone- lc gates and station approach road etc.) under aen/rph under the jurisdiction of den/4/hwh. [description: overall percentage above/below/at par over the rates of cpwd-dsr-2021 items of engineering department on all chapters with up to date correction slips etc. [value rs. 6500000.00] note: 1. the tenderer is to quote only one rate against the tender. the advertised value is the departmental assessed value. 2. the departmental assessed value/advertised value has been chalked out considering at par with the basic cost of cpwd-dsr-2021 items. this denotes that no escalation over the basic cost has been considered in firming up the assessed cost for the instant tender. 3. for firming up the assessed cost/advertised cost of this zonal tender, contribution of i) earth work- 4% in chapter no. 2, ii) mortar- 2% in chapter no. 3, iii) concrete work- 4% in chapter no. 4, iv) masonary work- 4% in chapter no.6, v) steel work- 5% in chapter no. 10, vi) dismantling and demolishing- 1% in chapter no.15, vii) road work- 80% only 4. during execution, the respective schedules from the above mentioned percentage may be varied, if necessary is felt, with the approval of the competent authority. finance vetting if warraned, may also be sought for in this context. 5. the above instructions are only for guidance to the tenderers. tenders should consider the above aspects while quoting rates. 7) tenderers while quoting rates should quote the rates % above/below/at par w.r.t. the assessed/advertised value, as reflected against the respective schedules, considering escalation and effect of gst and other taxes as applicable.
Tender For zone no. 38 (road zone- lc gates, station, circulating area, station approached road, colony road, workshop road etc.) under aen/hq under the jurisdiction of sr.den/hq/hwh p.e. 30.06.2026. [description: overall percentage above/below/at par over the rates of cpwd-dsr-2021 items of engineering department on all chapters with up to date correction slips etc. note: 1. the tenderer is to quote only one rate against the tender. the advertised value is the departmental assessed value. 2. the departmental assessed value/advertised value has been chalked out considering at par with the basic cost of cpwd-dsr-2021 items. this denotes that escalation over the basic cost has been considered in firming up the assessed cost for the instant tender. 3. for firming up the assessed cost/advertised cost of this zonal tender, contribution of i) earth work- 4% in chapter no. 2, ii) mortar- 2% in chapter no. 3, iii) concrete work- 4% in chapter no. 4, iv) masonary work- 4% in chapter no.6, v) steel work- 5% in chapter no. 10, vi) dismantling and demolishing- 1% in chapter no.15, vii) road work- 80% only 4. during execution, the respective schedules from the above mentioned percentage may be varied, if necessary is felt, with the approval of the competent authority. finance vetting if warraned, may also be sought for in this context. 5. the above instructions are only for guidance to the tenderers. tenders should consider the above aspects while quoting rates. 7) tenderers while quoting rates should quote the rates % above/below/at par w.r.t. the assessed/advertised value, as reflected against the respective schedules, considering escalation and effect of gst and other taxes as applicable.