Get complete information related to latest Plastic Buckets Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Plastic Buckets Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Plastic Buckets Tenders.
Tender For bed beding and kitchen equipments- kadhai badi , the pan is small, , large runaway lid, , small runaway lid, , parat big, , tablespoons for large vegetables, , service spoon (for vegetable), , small spoon, , a glass of water, , plates with sections (5 sections), , steel jug, , the stickman returned, , canoes, , container boxes, , container compartments, , steel bucket, , small knife, , peeling knife, , tea tank, , flake/roller set, , pressure cooker 10 1tr, , the reverse is big, , the reverse is small, , cups of tea, , bowl standard size, , hamam squad big, , sift the flour, , tea strainer, , ara (for pudding and pakoras) large, , jhara (for pudding pakoras) small, , tray large, , tray small, , tweezers, , sandasi, , tee set for visitor, , the plate has five mins, , breakfast plate (small size), , measurement set (100 ml), , measuring set (250ml), , measurement set (500 ml), , plasticbuckets, , gas stove single furnace, , iron pan, , plastic boxes for spices, , large plastic bucket, , mixer grinder, , electric scales (60 kg)
Tender For providing and supply rates for swachta samagri items for 2026-27 at nagar parishad depalpur distt indore - phenyl black isi phenyl (local grade) per liter; herbal/synthetic phenyl per liter; anti-larval oil per liter; malathion powder per kg; ddp/bhc powder per kg; k-othrine powder per kg; fogging chemical per liter; phenyl tablets per kg; fire hose (isi marked) per meter; large bamboo broom per piece; plastic pan/basin (14-inch width) per piece; plastic pan/basin (16-inch width) per piece; plastic pan/basin (18-inch width) per piece; heavy-duty shovel with handle per piece; heavy-duty spade with handle per piece; gumboots per pair; hand gloves per pair; paris green powder per kg; delta malathion liquid per liter; nuvan (syngenta) per liter; baygon liquid per liter; baygon spray/fogging solution per liter; plastic bucket (10-liter capacity) per piece; iron bucket (10-liter capacity) per piece; temephos per kg; pyrethrum per kg; herbal powder per kg; materials for sulabh toilets (phenyl, plasticbuckets, mugs, etc.); sanitizer; sodium hypochlorite; engine oil per liter; gear oil per liter; garbage vehicle tires and tubes (all sizes); iron dustbins for wet/dry waste (30-liter); iron dustbins for wet/dry waste (20-liter); iron dustbins for wet/dry waste (15-liter); plastic dustbins for wet/dry waste (30-liter); plastic dustbins for wet/dry waste (20-liter); plastic dustbins for wet/dry waste. for 15 liters: acid, lime, soap (gorej or no. 01).
Tender For quotations invited for non ssr items required for various works - medium size plasticbuckets, mugs, floor mats, hand wash liquid, toilet cleaning brush ,supply and fixing of stainless steel (ss 304 grade) inauguration name board of size 6'-0" x 3'-0" with embossed ss letters and supporting irame, including fabrication, transportation, erection. labour, hire charges, incidental charges and all olher components required for complete installation as direcled by the engineer-in-charge ,supply and tixing of ss 304 grade inauguration name board with led illumination, comprising ss letters of 4-inch and 3- inch height, including fabrication, mounting arrangements, electri l fi ft ings, transportation, labour, hire charges, incidental charges and all other componenls required for complete installation as directed by lhe engineer-in-charoe
Tender For shell kit for memu tc2,tc3,tc4 jk 942,943,945 a. roof assembly 94516001 000 01 alt 'nil' - 1 no. location of sidewall 94514001 000 01 alt 'nil' - 1 no. end construction pail end 94515001 000 01 alt 'a' - 1 no. end construction non pail end 94515002 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status.01, rev.04 with amendment no.01 firm shall fulfill themanufacturing facility as per icf/md/spec- 315, issue status.01, rev.00 with amendment no.01. b.supply of one coach set of body shell items and partition frames for memu/tc/jk 941 to drawing nos: 1. 94410076 000 01 alt 'nil' - 2 nos. 2. 94510007 000 01 alt 'b' - 1 no. 3. 94510002 000 01 alt 'a' - 1 no. 4. 94410072 000 01 alt 'nil' - 2 nos. 5. 94410054 000 01 alt 'nil' - 4 nos. c. under frame arrangement 94211001 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/spec-147, issue status.01, rev.02with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'f'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe should be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. (a)raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item] [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For shell kit for memu ndmc jk 962 a. roof assembly 96216001 000 01 alt "a" - 1no location of sidewall 96214001 000 01 alt "nil" - 1 no end construction pail end 94515001 000 01 alt "a" - 1no end construction shunting desk side 96215001 000 01 alt "nil" - 1 no firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315,issue status 01, rev.00 with amendment no 01. b.supply of one coach set of body shell items and partition frames for memu ndmc jk 962 to drawing nos 1. 96210002 000 01 alt "b" - 1 no 2. 96210007 000 01 alt "b"' - 1 no 3. 96210026 000 01 alt "nil"- 1 no 4. 96210046 000 01 alt "nil"- 1 no 5. 96210064 000 01 alt "nil"- 1 no 6. 94410054 000 01 alt "nil"- 2 nos 7. 94410076 000 01 alt "nil"- 1 no 8. 94410072 000 01 alt "nil"- 1 no c. under frame arrangement 96211001 000 01 alt 'd' - 1 no firm shall fulfill the manufacturing facility as per icf/md/spec-147,issue status 01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'f'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the under frame should be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. (a) raw material stage #ensure the raw material used using portable spectrometer (b) jig stage #assembly of front part with sole bar. #assembly of modular frame arrangement. #weld parameters to be checked & recorded (c) trestle stage #marking, drilling & tapping of holes wherever necessary. #marking & placing of detail items. #complete welding wherever necessary. #weld parameters to be checked & recorded #assembly & welding of trough sheets. #dimensional & visual checks. #punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. #short/sand blast to the requirements. #painting process as per the specification. #visual inspection. #final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For corrigendum : shell kit for memu ndmc jk 962 a. roof assembly 96216001 000 01 alt "a" - 1no location of sidewall 96214001 000 01 alt "nil" - 1 no end construction pail end 94515001 000 01 alt "a" - 1no end construction shunting desk side 96215001 000 01 alt "nil" - 1 no firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315,issue status 01, rev.00 with amendment no 01. b.supply of one coach set of body shell items and partition frames for memu ndmc jk 962 to drawing nos 1. 96210002 000 01 alt "b" - 1 no 2. 96210007 000 01 alt "b"' - 1 no 3. 96210026 000 01 alt "nil"- 1 no 4. 96210046 000 01 alt "nil"- 1 no 5. 96210064 000 01 alt "nil"- 1 no 6. 94410054 000 01 alt "nil"- 2 nos 7. 94410076 000 01 alt "nil"- 1 no 8. 94410072 000 01 alt "nil"- 1 no c. under frame arrangement 96211001 000 01 alt 'd' - 1 no firm shall fulfill the manufacturing facility as per icf/md/spec-147,issue status 01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'f'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the under frame should be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. (a) raw material stage #ensure the raw material used using portable spectrometer (b) jig stage #assembly of front part with sole bar. #assembly of modular frame arrangement. #weld parameters to be checked & recorded (c) trestle stage #marking, drilling & tapping of holes wherever necessary. #marking & placing of detail items. #complete welding wherever necessary. #weld parameters to be checked & recorded #assembly & welding of trough sheets. #dimensional & visual checks. #punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. #short/sand blast to the requirements. #painting process as per the specification. #visual inspection. #final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]