Tender For corrigendum : laying of conveyor belting and stacking of damaged/ worn out conveyor belting 1600 mm / 1400 mm wide of different conveyor belts on as and when required basis at chp khadia project for a period of 730 days
Tender For loading, transportation, unloading and installation of 01 no. of 55kw and 01 no. 22 kw 800mm belt conveyor complete with electrical accessories at 37ln/0d-1ds and 4d/37ln along with 420m belt structure and 840m pvc belting in lws of tawa-ii mine
Tender For supply of nylon conveyor belting 600 mm width ,nn gd 315 by 3 m 24 grade 3 mm top cover and 2 mm bottom cover with cut edge construction, open ends, conforming to is 1891 part 1, 1994 , nylon conveyor belting 500 mm width ,nn gd 315 by 3 hr grade 3 mm top cover and 2 mm bottom cover with cut edge construction, open ends, conforming to is 1891, part 1, 1994 , nylon conveyor belting 500 mm,nn gd 315 by 3 m24 grade 3 mm top cover and 2 mm bottom cover with cut edge construction, open ends, conforming to is 1891, part 1, 1994 , nylon conveyor belting 450 mm width , n by n 1000 by 6, 6 ply , uhr grade, 5 mm top and 6 mm bottom with cut edge construction, open ends, conforming to is 1891, part 1, 1994 , nylon conveyor belting 350 mm width , n by n 800 by 6, 6 ply , hr grade, 5 mm top and 6 mm bottom with cut edge construction, open ends, conforming to is 1891, part 1, 1994 , nylon conveyor belting 300 mm width , n by n 800 by 5, 5 ply , hr grade, 5 mm top and 6 mm bottom with cut edge construction, open ends, conforming to is 1891, part 1, 1994 , nylon conveyor belting 250 mm width , n by n 800 by 5, 5 ply , hr grade, 5 mm top and 6 mm bottom with cut edge construction, open ends, conforming to is 1891, part 1, 1994 , nylon conveyor belting 200 mm width , n by n 800 by 5, 5 ply , hr grade, 5 mm top and 6 mm bottom with cut edge construction, open ends, conforming to is 1891, part 1, 1994
Tender For corrigendum : providing of facility management services - lumpsum based - industrial; laying of conveyor belting and stacking of damaged belting of different conveyors for two years at nigahi chp; consumables to be provided by service provider (inclusive in contract cost)