Tender For equipments for eee --, interfacing of discrete field devices with plc., plc based conveyor system with pre warning siren., plc based counting of moving objects on a conveyor., plc based water level control system., plc based counting of moving objects on two conveyors., plc based car parking control system., plc based fan control for energy conservation., plc based three flour lift control system., plc based illumination control system., plc programming kit.
Tender For corrigendum : shifting of materials from cuttack to lehragaga as per soq sl. no 2 , lng filling pump (10-35 lpm qty. 2 nos. ) as per soq sl. no 4 , portable propane tank (250 kg qty. of propane 2 nos. ) as per soq sl. no 5 , lng loading pump (350 lpm qty. 1 nos. ) as per soq sl. no 6 , all piping along with valves, fittings etc from cryobox to all equipments as per soq sl. no 7 , supply of instrumentation system comprising of field instruments as per soq sl. no. 8 , scope shall also include design, engineering & supply of electrical system as per soq sl. no. 9 , scope shall also include design, engineering & supply of electrical system as per soq sl. no. 10 , the scope of work consist of erection/ installation of all equipment as defined as per soq sl. no. 12 , bidder shall provide detailed training for atleast 7 days to owner's employees as per soq sl. no. 14 , providing the services for resources round the clock for various unforseen as per soq sl. no. 17 , the scope shall include the transportation of 2 nos. of supplied propane tanks as per soq sl. no. 18
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - naval dockyard mumbai and nsry karwar; repair rate agreement for 3d laser scanning and transition field electromagnetic technique (tfet) of underwater hull for two years..
Tender For up keeping and preventive maintenance works and attending operational complaints of lt field equipments, field panels, 220v battery system, and ups battery system including chargers of chp ytps upto tp10 in the priority path from actual date of commencement of work to a period of 3 months for the fy 2526