Get complete information related to latest Pontoon Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Pontoon Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Pontoon Tenders.
Tender For corrigendum : laying of m s pipeline ranges of dia 6 inch along with fabrication and installation of pontoon and floating dock for providing water supply to construction water system for coal to ammonium nitrate (2000 tpd) plant of bcgcl lakhanpur jharsuguda odis
Tender For corrigendum : constructing stone crated berm protection on r/s river sutlej on u/s and d/s of pontoon bridge to protect/save the bridge for troop/defense movements by bsf and army authorities along ib in the area of bop old mohmmadiwala
Tender For design, drawing, construction, testing, commissioning of floating pontoon of size 5x3 mtr at jhumka dam, raw water electric sub station100 kva/11/0.415 kv with all required work,raw water hscf pump sets 2 no of 10hphaving discharge - 97656 lph and against 20.0m head at floating pontoon station site, 2.0 mld conventional type water treatment plant, clear water centrifugal pump set 03 nos of 30hp having discharge 93750 lph against 101m head, clear water electric sub station 100 kva/11/0.415kv with all required work at wtp site, 120 kl capacity 30m staging mbr-1 no at village salka,100 kl capacity 16m staging mbr-2 no at village salka, providing, laying, jointing and testing & commissioning of raw water pumping main di k-9 pipe 250 mm dia- 200m and clear water pumping main 150 mm dia di k-9 pipe-3820 m,di k-9 pipe200mm dia-1210 m ,total length-5030 m& clear water gravity mains di k-7 pipe 300 mm dia l= 6128m.& o-pvc pipe pn-16, 160mm dia – 5423m. 250 mm dia –7487m, 110mm dia – 31711 m. total length- 50749 m with all required valves &specials,as per attached key plan map, providing and fixing bulk flow meters, nala crossing and work include taking permission to pwd, wrd deptt. etc. allied all civil works including boundary wall around wtp campus. work completion is 12 months including rainy season integrationof all component, comprises of three month testing & 09 month trial run of entire scheme (with defect liability period of one year). (on risk and cost basis)group water supply scheme narkeliblock- baikunthpurdistrict –korea
Tender For fabrication and supply of hdpe float pontoons complete with pump installation infrastructure and installation of pumps with electricals and commissioning of each complete pontoon pumping arrangement for different projects of argada area.