Tender For supply of set of welded partition frame for non ac bangladesh coach. note: make/manufacturer of raw material shall be m/s jsl or m/s sail., as per drawing: mp25parnabang version 3, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - wooden crates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic film or water proof ability paper, to guard against corrosion. 4. component arrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securingthe components: - use steel straps or ropes to fimly anchor the components within thewooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorbshocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify thatall components are securely packed and that packaging materials are intact. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of set of welded partition frame for bangladesh ac chair car coaches.note: make/manufacturer of raw material shall be m/s jsl or m/s sail., as per drawing: mp25paraccbang version 2, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - wooden crates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plasticfilm or water proof ability paper, to guard against corrosion. 4. componentarrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securing the components: - use steel straps or ropes to fimly anchor the components within the wooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify that all components are securely packed and that packaging materials are intact. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of chemicals and plasticwares c c - measuring scoop white pp 10 ml , sterile individually packed long handle sampling spoon hips 5ml 5.6 inch overall long , sterile individually packed long handle sampling spoon hips 15ml 5.1inch overall long , nitrile gloves powder free small , nitrile gloves powder free medium , nitrile gloves powder free large , kimwipes disposable wipes 11.17 cm x 21.3 cm , gloves dispenser 3 places , hand protector grip silicone , ultra clean tube conical bottom pp with hdpe closure 15ml pp hdpe conforming to usp class vi autoclavable , self standing centrifuge tube pp hdpe conforming to usp class vi autoclavable 50 ml free of detectable pyrogen rnase dnase , conical centrifuge tube rack rpp wells for 15 ml tubes 50 ml tubes , float rack pp 16 places , rack for micro tube pc 24 places 15 ml capacity , micro tube rack reenforced nylon 96 places , 96 place reversible rack with cover pp 1.5 or 2 ml tubes in one side the reverse side holds 05 ml tubes , combi lock rack pp holds four 50 ml tubes twelve 1.5 ml tubes thirtytwo 1.5 ml micro tubes or thirtytwo 0.5 ml micro tubes , test tube stand rpp non autoclavable 20 places , drying rack with drain hole 30 pegs , utility tray pp 540 mm l x 435 mm w x 130 mm h , utility tray pp 320 mm l x 260 mm w x 100 mm h , cryo cube box pp 100 places 1.8 ml capacity 140 mm l x 140 mm w x 55 mm h , pcr mini cooler pp with insulating solution 96 places , ice bucket with lid pur 4.5 l capacity 335 mm l x 285 mm w x 187 mm h , parafilm m 2inch w x 250inch l , parafilm dispenser , cryo tags 38 mm l x 19 mm b , gel caster for submarine electrophoresis unit , gel scoop acrylic 14 cm x 20 cm , edta disodium salt 99 percent ar , sodium chloride 99.5 percent ar , tris base 99.5 percent ar , tris hcl 99 percent ar , sodium acetate anhydrous 99 percent ar , trissaturated phenol 99.5 percent mol bio grade , phenol chloroform isoamyl alcohol 25 24 1 , chloroform isoamyl alcohol 24 1 mol bio grade , ethanol molecular grade , sds 99 percent ar , proteinasek 20mg ml , ammonium chloride 99.5 percent ar , potassiumbicarbonate 99.7 percent ar , glacial acetic acid 99.7 percent ar , agarose h for electrophoresis
Tender For supply of inhibitor corrosion , coolant pre mix fleet guard complete eg 50 : 50 cil part no. 3167224 for cummins engine model vta-28-l as per drg.no. cil part no. 3167224 specn: cil part no. 3167224 [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of set of partition frame for lsdd amrit bharat 3.0 ( (note- colour scheme is as per design letter no md48161 dated- 15/05/2026 ), as per drawing: mp26pfgsab3.0 version 0, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - wooden crates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic film or water proof ability paper, to guard against corrosion. 4. component arrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securing the components: - use steel straps or ropes to fimly anchor the components within the wooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed.8. final inspection and sealing: - conduct a thorough inspection to verify that all components are securely packed and that packaging materials are intact. [ warranty period:30 months after the date of delivery ] ]
Tender For providing of selection of laboratories for testing of products/material - serum electrolyte sodium potassiumbicarbonate iron ferritin tibc ro culture ro electrolyte hiv elisa hbsag elisa hcv elisa renal ructional cbb mp blood group btct widal rbs urea creatinine..