Tender For bid to ras bid to ras supply of cable joint kit (v2) (q3) , led suface fitting 36 watt 2x2 , battery for solar light180ah 24 volt , transformer oil superior quality tested for dilectric strength upto 45kv isi marked , solar gate light fitting led 12w , bamboo ladder 20 feet to 25 feet , tape insulation for ht 11 oblique 22 kv , switch plate 2 way module , frp looping box with fixing clamp with locking arrangement and cut out 16 amp 01 nos connection for incoming oblique outgoing cables of size 250 x 200 x 100mm , frp looping box with fixing clamp with locking arrangement and cut out 16 amp 01 nos connection for incoming oblique outgoing cables of size 225 x 175 x 100mm , metal clad industrial plug and socket enclosure with 2 pole earth metal plug for incorporating and including mcb sp 20 amp including top , pvc board 100x100x50 mm , cassing capping patti 1 inch x 1 oblique 2 inch , fancy wall bracket fitting with 9w led bulb , cassing capping patti 3 oblique 4 inch x 1 oblique 2 inch , frp looping box with fixing clamp with locking arrangement and cut out 16 amp 01 nos connection for incoming oblique outgoing cables of size 300 x 250 x 100 , modular white cover plate 3 module , modular white cover plate 4 module , cotton waste , plate for roma switch box 10 module , modular white cover plate 8 module , pvc board 250x200x50 mm , polymetric insulator disc type ht 22kv as per sample , pvc board 150x150x50mm , modular white cover plate 2 module , battery terminals brass as per sample , insulator pin type lt 440 volts as per sample , plate for roma switch box 08 module , lugs aluminium 25 sqmm , pvc board 180x100x50mm , pvc board 80x80x50 mm , insulator pin type ht 11 kv as per sample , switch box for roma switch for 8 module , modular white cover plate 1 module , rawal plug 100 nos box 25mm x 8g , screw metal 50mm x 8 size , screw metal 35mm x 8 size
Tender For tender for supply of equipment / material, design, erection, testing, commissioning for providing s.o.p. to newly constructed residential building at nift campus chebb at kangra under esd no. i hpsebl, kangra. - (a) material/erection of 11/0.4kv,250 kva s/stn., prov.distribution transformer (ordinary), 11/0.4 kv, 250 kva, prov.steel tubular poles (9 m, working load > 200 kgf/m ), prov.x-arm: [channel iron (100x50x5 mm), length : 2800 mm x 2 nos] for incomer line, prov.ms angle iron (50x50x6 mm), length: (2800 mm) x1 nos for las, prov.x-arm: [channel iron (75x40x6 mm), length : (2800 mm x 4 nos] for supporting do fuse unit & go switch, prov.x-arm: [channel iron (100x50x5 mm), length : 2800 mm x 2 nos] for transformer bed, prov.x-arm [channel iron (100x50x5 mm), length : (460 mm) x 2 nos for supporting main channel of transformer], prov.ms angle iron (50x50x6 mm), length : (2800 mm) x 2 nos, prov.ms angle iron (35x35x6 mm), length : (460 ) x 2 nos, prov.ms angle iron (50x50x6 mm), length : (950 mm) x 2 nos for bed knee bracing, prov.ms angle iron (50x50x6 mm), length : (2800 mm) x 2 nos, prov.ms angle iron (50x50x6 mm), length : (450 mm) x 1 nos, prov.go switch handle supporting: [channel iron (75x40x6 mm), length : 460 mm, prov.d.o fuse unit, prov.surge arrester, 9 kv station class (porcelain type), prov.discs insulator sets (comprising 1 no. disc: ^^(porcelain, bs, 12kv, 90 kn) including dead end clamps etc.), prov.pipe earthing set, lt distribution panel box with mccb(630a, 50 ka, 3p,1 no) and mccb(250 a, 36ka, 3p, 3 no.), prov.half clamp (m.s. flat 50x6 mm), prov.full clamps (m.s. flat 50x6 mm), prov.nuts and bolts of various sizes (galvanised / coated) [preferably 16 mm or more (with flat and spring washers)], aluminium thimble, copper thimble 200 amp, danger plate, prov.barbed wire, prov.energy meter (3-phase,4-wire)dlms compliant 400/5a ct type, prov. aluminium paint., prov.aaac 7/3.15mm conductor for earthing, erection charges complete in all respect, transportation charges complete in all respect, (b)material/erection of 11 kv ht line, prov aaac 7/3.15mm conductor (50mm ) {includes cutting and wastage}, prov. steel tubular poles (9 m, working load > 200 kgf/m ), prov.m.s. c.i.x-arm (1500x100x50x5 mm), long for single pole, prov.m.s a.i x-arm (1800x50x50x6 mm), long for single pole, prov m.s a.i x-arm (50x50x6 mm), length (2x750) mm long for single pole, prov m.s a.i x-arm (50x50x6 mm),length (2x600) mm long for single pole, prov.m.s c. i cross arm (75x40x5 mm), length (2400) mm for g.o switch & d.o fuses, prov.belt set - ms a.i 50x50x6, length [2400 mm x 2 no.] for double pole, prov.x-bracing set - ms a.i 50x50x6, length [2700 mm x 2 no.]for double pole, prov 11 kv pin insulators (porcelain, 12 kv, 10 kn), prov disc insulator ,1 no disc (12 kv, 90 kn) including dead end clamps etc., prov ht earthing set complete, prov double continous earth wire (gi, 8 swg) @ 0.102 kg/m, prov danger plate (250x200x1.6 mm), prov nuts and bolts of various sizeswith flat and spring washers, prov barbed wire, prov aluminium paint, prov.full clamps (m.s. flat 50x6 mm), prov.xerox for chebb s/stn for scada, prov.d.o fuse unit, erection charges of 9 mtr st pole complete in all respect, erection charges of stay set complete in all respect, erection charges of coil earthing complete in all respect, erection charges of g.o. switch complete in all respect, erection charges of sagging aaac 7/3.15mm conductor, sagging of continous earth wire (gi, 8swg) @ 0.102 kg/m complete in all respect, transportation charges complete in all respect, commissioning of a 250 kva dtr plinth and fencing, earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds o
Tender For m and r work under edd- rania -loading 8.5 m long pcc pole from electricity storage centre jainpur on own vehicle and taking it to work site and unloading it safely through unpaved road. a loading 11 m stp pole from electricity storage centre jainpur on own vehicle and taking it to work site and unloading it safely through unpaved road. a transport of electric line material like conductor, clamp, nut-bolt wire, lt cable, stonepad, station set, xlpe, abc etc. to the specified place by own vehicle for an estimated distance of 75 km through unpaved road. a digging pit at the place of broken/damaged poles and installing pcc poles by tying all accessories like cross arm, disc, pin insulator etc. and fitting earthing rod. a tying all accessories as per requirement in the long span in the middle of the already constructed line. the work of re-energizing by installing additional pcc/stp poles as per the prescribed standard/specification of response link. a the work of re-energizing by installing additional pcc/stp poles as per the prescribed standard/specification of response link while tying all the accessories as per requirement in the middle long span of the already constructed line. a installation of new section double pole in place of broken/damaged double pole. a grouting work of pcc/stp poles as per respo standard. supplying cement, ballast, gravel in the ratio of 1:2:4. repairing section double pole. tightening damaged stays by renosing. tightening the white wires of 33 kv line, each wire and tightening the white wires of lt and 11 kv line, each wire. straightening the skewed poles of 33 kv line/11 kv line/lt line as per respo standard and tying all accessories and erecting them correctly. giving clearance by trimming the trees of 33/11 kv and lt line. spreading the acsr vessel conductor in 33/11 kv line and tying stringing and sagging insulators in all the three phases and jumpering and earthing each wire. replacing damaged cross arm.