Web Analytics Made Easy - StatCounter

Power Factor Correction System Tenders

Get complete information related to latest Power Factor Correction System Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Power Factor Correction System Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Power Factor Correction System Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :43807695 Due date: 17 Feb, 202617 Feb, 2026 48.00 Lacs
Tender For annual maintenance work of 33kv lines/11kv lines/lt lines,11/0.4 kv substations, handling of consumer complaints, releasing of new connections, disconnection of defaulter consumers and replacement of damaged transformers, idf meter and monthly meter reading through sbm/ android gadgets based machine and bill generation of bungachina section under edd pithoragarh - annual maintanance and billing work of bungachina section for the year 2026-27.(the asset/ infrustructure/consumers added during the contract period will also be maintained /executed within the agreement cost as being done for existing infrustructure.), annual maintenance work of bungachina section under edsd pithoragarh. as per site condition sufficient nos of trained staff should be deployed to execute following work. detail of infrastructure as below.(a) maintenance of 33 kv line,11kv line, lt line, attend breakdowns and all associated works to keep these lines in healthy and operational condition to ensure 24x7 supply to the consumers connected with these lines.(b) to attend consumers (domestic/commercial/industrial) complaints and grievances.(c) replacement of machanical/defective/burn/idf meters.(d) release of new connections.(e) disconnection of defaulter consumers.(f) maintenance of 11/0.4 s/s., route cleareance by cutting of tree branches / proning, loping and chopping of trees for l.t., 11 & 33 kv line., replacement of damaged t/f upto 3% of total installed t/f including head load & motor raod cartage of damage t/f upto je store. if damage rate is more than 3% these t/f will be replaced/repaired by the contractor at his own cost., monthly meter reading through sbm/ android gadgets based machine and bill generation.
 Loading, Please wait...

Connect us via What's Up