Get complete information related to latest Power Skirting Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Power Skirting Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Power Skirting Tenders.
Tender For corrigendum : combined package of the following works - work a establishing 2x200mva, 220/110/11kv substation at gubbi and construction of 220kv & 110kv transmission lines along with 110kv terminal bays in gubbi taluk, tumakuru district. detailed scope of work is as follows a. establishing 2x200mva, 220/110/11kv substation at gubbi. b. construction of 220kv lilo line from existing 220kv shivamogga antharasanahalli b1 sc line to proposed 220/110/11kv gubbi substation using hpc conductor for a distance of 0.631kms. c. conversion of existing 110kv sc line on sc towers by 110kv dc line on mc/dc towers from proposed 220/110kv gubbi substation to existing 220/110/11kv nittur substation for a distance of 12.015 kms using panther conductor. d. conversion of existing 110kv bidare sc tap line to 110kv dc line using 220kv mc and 110kv dc towers from proposed 220/110kv gubbi substation for a distance of 12.975kms using lynx conductor. e. construction of 110kv terminal bay at 220/110/11kv nittur substation. f. construction of 110kv terminal bay at 110/11kv bidare substation. g. de commissioning of existing structure/equipment at existing premises of 110kv gubbi substation for construction of 220kv substation. h. de commissioning of assets conversion of 110kv gubbi nittur line to dc line. work b establishing 2x20mva, 110/11kv substation at mma kaval in gubbi taluk, tumakuru district and construction of sc 110kv lilo line from the existing 110kv gubbi bidare line to proposed 110/11kv mma kaval substation using lynx conductor for a distance of 3.63kms in gubbi taluk, tumakuru district on partial turnkey basis including supply of all matching materials/equipments (excluding supply 11kv switchgear) and erection (including dismantling and civil works) of all materials/ equipment, testing and commissioning.