Tender For maintenance of electrical installation & fans i/c repair maintenance of dg set, ac unit dp structure at regional passport office, mauya lok complex, patna (sh - annual maintenance of 250 kva dg set.
Tender For work of design, supply and installation of prefabricatedsteelbuilding to serve as a restroomand store for gang and stationary watchmen near bridge at km 252/22-24 adtp-tata section dn line 3rd line as annexure a enclosed. bidders should comply annexure a. [ warranty period: 30 months after the date of delivery ] ]
Tender For tender for the work of enhancement of 100kva dtc mathwada to 200 kva alongwith replacement of dp structure, and conversion of 1ph 4w to 3ph 6w lt line alongwith replacement of deteriorated material under s.o. mayem, sd i, bicholim goa.
Tender For corrigendum : supply, installation, testing and commissioning of 160 kva,11kv by 415 v, distribution transformer along with 11 kv dp structure, goab switches, la, cables etc and associated civil work at cmpdi ri vii, exploration camp, kosala, angul, odisha
Tender For corrigendum : laying of 270 mtr 11kv 3x185sqmm xlpe cable through micro tunneling with hdpe pipe pn-6 and other allied works for installation of new 01 nos 100 kva dist. sub station on 9 mtr pcc pole dp structure for new service connection proc - b to iro manas ma
Tender For widening of existing canal culvert or bridge structure on 60.0 m wide d.p. road connecting national high way in west zone (rander) area (work no.07)
Tender For supply of materials and erection for shifting of control room pannel at 33/ 11 kv sub station bharsawa distt. kaushambi under deposit scheme on "semi turnkey basis" under edc, kaushambi - name of work: supply, carriage & erection of materials for control room pannel shifting of shiffting of 33/11 kv s/s bharsawa distt. kaushambi, supply of de-centralised materials, 11 kv 3x120 mm2 xlpe cable jointing kit o/d & i/d, control cable 4x2.5 mm2, control cable 2x2.5 mm2, g.i. pipe 6 " dia, rubber matting, clamp with nut & bosts, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp pcc pole, dropper channel clamp pcc pole, g.i. strip 35x6 mm, carriage of following material, pcc pole 8.5 mtr. long., structure of la, 33kv isolator, 33 kv cts, single t/f control pannel, 33kv vcb,11 kv outgoing. incoming pannel, battery & battery charger and other associated accessiories etc. (availibility at concern store center of store division), erection work, installation of 33 kv single transformer control pannel 2 no., incoming 2 no. and 7 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect with complete connection of control cable with pannel. all material will be provided by the contractor except vcb and crp., construction of cable trenchs with top cover and laying of control cable for vcb, c.t. & t/f control pannel etc. as per direction of engineer. trenchs to be 12 wide and 9 deep. work includes digging, of trench, concreting of the foundation in the ratio 1:3:6 r.b. wall 9 wide with cement mortar 1:4 and plastering inside the trench in the ratio 1:3 and sand filling in the trench. all material will be provided by the contractor., earthing of 11 kv indoor equipments, switchgears as per resspo drawing. with g.i. strip of size 35x6 mm. g.i. strip fully welded at both ends and to be connected with earthmat,, erection of dp with pcc pole 8.5 mtr long with all accessaries and grouting of the pcc pole with cement, sand and brick ballast ratio 1:4:8 size 0.45x 0.45x 1.5 mtr deep under the ground as per drawing no. res-6.(cement, sand, brick, ballast shall be provided by the contractor.), installation of 24 volt battery and battery charger with cabinet in the switch gear room, by grouting base channel 100 x 50 x 6 x 1000mm. fixing of rag bolt., laying of 11 kv 3x300/3x185/ 3x120 sqmm. xlpe cable by digging 0.75 mtr. deep trench, putting layer of sand in the bottom, ramming it, laying of cable over it rmt and covering the cable from sides and top by laying bricks, finally covering the same by earth and levelling of the same, all the materials, except cable, will be pvovided by the contractor., fixing and termination of outdoor/ indoor heat shrinkable cable boxes of size 3 x300/3x185/3x120 sqmm. xlpe cable. boxes will be supplied by the contractor, sundries ( as per site requirement/emergency work), safe dismantling of 11 kv o/g pannel & received back to store, laying of weasel conductor with the help of aluminium roller by hanging three nos. on each support in a manner taking sufficient care to ensure safety of weasel conductor against rubbing on ground, precaution for safety of crops is also to be taken. the work includes jointing of conductor by providing jointing sleaves, stringing of conductor upto correct sag and binding of conductor with insulators on each support. all material shall be provided by contractor such as jointing sleeve binding wire, armour rod etc.
Tender For corrigendum : supply of 4500 sets of stay set complete - supply of silicagel blue, 0.6kva ups, stay set complete( quote price for single unit only), silicagel blue 10 to 12mm, pole pit for 9.0m and 9.14 m psc/rcc / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr, ordinary soil, semi rocky soil, heavy rocky soil where blasting/ cheseling required [specific approval should be obtained from concerned ee], stay pit, in ordinary soil [0.95 x 0.6 x 1.2m], semi rocky soil, stay pit in heavy rocky soil where blasting/ cheseling reqiured [specific approval should be obtained from concerned ee], erection of poles & stays (including refilling of excavated earth), erection of 7.5m / 8.0m poles [rcc / psc], erection of 9.00m / 9.14m rcc / psc/rail pole, tubular pole and all metal poles, stay set, erection stay set complete, stay erection without rod and pit, replacement of stay rod only. (including stay pit excavation & refilling & erection), replacement of guy shackle only in existing stay, erection of line materials, fixing of lt 1 ph "x" arm, fixing of lt/ht ti fitting, fixing of lt 3 ph "x" arm, fixing of 3[1/2] v ` x arm, fixing of 4[1/2] v ` x arm, fixing of 5 v x arm, fixing of tapping channel / guarding "x" arm, providing of line spacers in lt lines 1 phase, providing of line spacers in lt lines 3 phase, erection of ab switch with pt insulator & jumpering complete, erection of centre rotating switch ab switch complete, fixing of ht pin insulator / strain disc, 11 kv pin insulator with pin, 11 kv strain disc / polymer disc with hardware, 22 kv pin insulator with pin, 22 kv strain disc / polymer disc with hardware, 33 kv pin insulator with pin, 33 kv pin strain disc/polymer disc with hardware, fixing of lt pin insulator with pin, lt shakle with hardware, fixing of aluminium knob, paving stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from road side to work spot] per run, upto 7/2.59 mm acsr, 7/2.50 aaac including pvc cable upto 25 sqmm, acsr 7/3.35mm & 7/ 3.15 aaac including pvc cable above 25 sqmm, acsr 7/4.09 mm, above 7/4.09 mm acsr & dog conductor, earthing wiring and connection including transporting of earth pipe and excavation of pit], transformer structure earthing 10ft depth - 3 nos of pipe through tubes, dp earthing including all works [double side earthing], erection of 4th earth pipe including earthing, earthing of poles, earth pit masonary work 3 nos earth pits or using 3 nos concrete tub., replacement of detoriated earth pipe per location, concreting with mixture 1:3:6 [including all materials]., mass concreting for centre support for 2 feet including all materials, mass concreting for pole0.6x0.6x1.25m.with coping, sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping, sleeve concreting for stay set 0.3 m & 0.75 long, erection of distribution transformer structure complete, excavation of structure pole pits 0.9 x 0.9 x 1.83 mtr, transporting of pole to pit location 2 nos., erection of poles 2 nos, excavation of stay pit 4 nos, erection of stay set (4 sets), mass concreting (cement:sand:jelly supplied by the contractor) 2 nos., erection of 22 kv ab switch, ttransformer structure earthing 10ft depth - 3 nos of pipe through earth tubes, erection of top channel, bed channel [2 nos channel] erection, cross with stud for bed channel erection, erection of belting angle / hg fuse angle, erection of hg fuse set, erection of ht las with jumpering and earthing, erection of lt las with jumbering and earthing, erection of jumpering [ht side], transformer wiring in lt side including jumpering bus bar etc., erection lt open type fuse unit arrangement single, erection lt open type fuse unit arrangement double, painting of stru. complete excluding dt [two coat of red oxide] all metal parts(excluding cost of paint)., painting of stru. complete excluding dt [one coat alu paint, excluding cost of paint), colour washing of 2 numbers structure p