Web Analytics Made Easy - StatCounter

Prime Mover Spares Tenders

Get complete information related to latest Prime Mover Spares Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Prime Mover Spares Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Prime Mover Spares Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :41362596 Due date: 16 Aug, 202516 Aug, 2025 NA
Tender For supply of steering gear box , gear fly wheel assy , pilot brg , clutch plate , clutch sleeve cyl assy , pressure plate , door trim lh rh als , door trim lh rh tata , gear lever knob , reverse light switch , assy clutch pedal , convey light , bush set , isolator switch , isolator switch als , pinion iot , shackle bush , belt water pump , clutch sleeve cyl , throttle body assy , bty cut off switch 24 b , wiper motor 24 v , rpm motor 24 v , eng mtg pad front , spare wheel lifting , door lock rear

CTN :41359785 Due date: 18 Aug, 202518 Aug, 2025 NA
Tender For supply of engine overhaul , hyd lifting pump repair , gear box repair , fip overhaul , tractor trolley iron sheet repair

State Government

CTN :41355801 Due date: 12 Aug, 202512 Aug, 2025 NA
Tender For repairing of all gear box and its accessories at wazirabad barrage. - dismantling of gearbox by removing both end couplings and extracting the complete shaft assembly from the barrage gates. this includes removal of thrust and steel blocks using skilled labour and specialized lifting equipment. the gearbox top cover (top half) shall be removed, followed by detachment of the bottom half from the main gearbox body. all internal components parts gear, changer gear assembly, bearing, limit shift assembly and shaft shall be carefully removed in sequence, ensuring proper identification and documentation of their orientation and order for accurate reassembly., dismantling of drumbox assembly by removing both end couplings and extracting the complete shaft,bear and gear assembly from the drum box .. all internal components parts gear, changer gear assembly, bearing, limit shift assembly and shaft shall be carefully removed in sequence, ensuring proper identification and documentation of their orientation and order for accurate reassembly., thorough cleaning of all components to remove debris, contaminants, and residual lubricants using appropriate cleaning agents and methods. detailed inspection of each component to assess condition, identify wear, damage, or corrosion, and document findings for further repair or replacement as required., repair of limit switch assembly of gear box including the complete overhauling /oiling and greasing including replacement of parts as per sample ., replacement of normally open (no) switch and contactor with a relay, along with the complete installation of electrical components for the gear box in the hoisting mechanism of the barrage system, replacement of brake pad as per sample along with complete fitting and integration in the gearbox assembly, replacement of brake coil as per sample along with complete fitting and integration in the gearbox assembly, replacement of bearing no 6315/c4 djb approved makes, replacement of bearing no 6312m/c3 djb approved makes, replacement bearing no 6308 2rs1 djb approved makes, replacement bearing no 6310 2rs1 djb approved makes, complete assembly of the gearbox, including packing, greasing, and installation of both end shafts with cast iron (c.i.) couplings and bolts. ensure proper alignment and secure fastening to maintain efficient power transmission and operational reliability, complete overhauling and lubrication of all moving and critical components of the drum box assembly of the gearbox, using appropriate tools such as grease guns and nipples. the work shall be carried out by skilled labor as per site requirements. ensure proper lubrication with the specified grade and viscosity of grease to maintain optimal performance and prevent wear and tear of mechanical parts including internal parts of painting, the work involves achieving precise/making alignment of the shaft connecting the drum box and gear box in the hoisting mechanism of the barrage. proper alignment is critical to prevent deviation from the guide grooves during operation particularly during lifting and to ensure long-term stability and accuracy of sluice gate movement.the job includes dismantling the existing shaft (which transmits motion between the drum box and gear box), carrying out realignment, and reinstalling the shaft with high precision. to restore the system to optimal operating condition, the work shall also involve the replacement of associated hardware components as required such as bearings, couplings, keys, and fasteners.this intervention is essential for the reliable and efficient functioning of the sluice gate lifting system and to prevent operational issues during gate actuation., after cleaning and overhauling the gear and shaft of the gearbox, refit and them in their original positions with making alignment with all movement parts of gear box and ensure that they are functioning properly., conduct load testing of 3under sluice and 3weir side gates and weir side gates during

CTN :41330361 Due date: 19 Aug, 202519 Aug, 2025 NA
Tender For supply of battery loading gear assembly - transverse carriage nature , swing arm , travelling crane aft side , travelling crane forward side , sling for lifting , assembly jig , documentation for battery loading gear assembly , carriage wheel spares , rope pulley spares , rope with holding shackle spares , trolley crane rollers spares , warm gear and pinion set spares , drum pulley for holding rope spares , o ring spares , oil seal spares

CTN :41347134 Due date: 16 Aug, 202516 Aug, 2025 NA
Tender For supply of a veh spares c c - n1 r90 3020 015660 guard 175 18 048 , n1 r90 1010 013342 inner slip cover 172 20 021sb 1sb , z6 r90 5305 092625 adjusting screw drg no 188 70 109sb 1 , z6 r90 5970720294578 insulator bushing , z6 r90 misc t 90s ba20 1s 050cb transistor assy , z6 r90 misc t 90s 188 77 042sb mounting right hand hatch equpt , z6 r90 misc t 90s bl9 363 593 03 ring , x5 r90 misc tu16 535 553 79 a 28 40 bulb , x2 r90 misc 4615 731 140 64 connector plug , z6 r90 misc pts 30 1 ts30 1 fuse , z1 r90 misc t90s 155 33 66sb 11 wire rope , z6 r90 misc gost 11371 78 c6 01 016 washer c6 01 016 , z6 r90 misc t 90s 172 74 491 bracket lh , lv1 r90 2990720310049 main oil tank drg no 188 32 054sb , lv1 r90 4720720261169 connection hose 188 31 060sb 1 , z6 r90 172 40 301 lh drum , lv1 r90 2990720353995 screening duct drg no 188 04 058sb , n1 r90 3010 004162 reduction gear unit , z7 r90 188 21 089cb oh 165 head protection , n1 r90 3010 004304 188 28 002sb sb reduction gear unit for lifting the cell ) /bid number : gem/2025/b/6538662 * /dated: 05-08-2025 & & / bid document 1 / 21

corporations/Associations/Others

CTN :41341699 Due date: 11 Aug, 202511 Aug, 2025 NA
Tender For auction sale of cotton rags,leather scrap,tarpaulin scrap,tentage of sorts,ferrous scrap,tyre of sorts,fire extinguisher,track links,bicycle scrap,gear box (t-72),jack lifting (mixed),engine assy (small size),generator set small sizes

CTN :41025013 Due date: 14 Aug, 202514 Aug, 2025 NA
Tender For corrigendum : supply of travelling crane for grse yard no 3041 orv project - travelling crane for scientific store , obs for 2 years exploitation , special tools and test equipment , commissioning spares , installation tools and materials , service , onboard training , docomentation hard copy , docomentation soft copy in pen drive , travelling crane for main hangar , crane and lifting gear for engine room

CTN :41315640 Due date: 16 Aug, 202516 Aug, 2025 NA
Tender For supply of release bearing - clutch plare assy , release bearing , exhaust brake system removing and full service and fitting , ramp assy removing he vehcile and taken to machine shop, stripping, checking, cleaning all damaged seals, springs o ring change and ramp assy and testing and fitting the veh hoos operated , transfer mounting bracket , clutch plate assy , pressure plate assy , the above mentioned old parts removing and afterr servicing fitting the vehcile, vehcile tesing mechanical charge , 4x4 assy checking and fully removing full electric connection checking and mechanical fault removing and testing 4x4 , igniition switch , windscreen , relay 12 and 24v , full electrical checking, damaged burning loom change and electrical system service, all light, wiper all testing , labour for mechanical charge , door lock rh and lh , door mechanism rh and lh , wind screen , the above parts removing and new fitting inccluding windscreen removing and fitting , brake shoe lining with rivet , brake drum skimming , brake booster , auxiliary gear box mounting bracket , aixiliary gear box mounting bolt male and female , rotary switch , all wheel drum and brake shoe assy removing and old parts removing and all parts after servicing fitting the vehicle and brake testing mechanical charges , full electrical checking, all lighting system service damaged burning loom replaced and tested , ramp assy removing the vehcile abd taken to machine shop, stripping, checking, cleaning all damaged seals, springs o rings change and ramp assy and testing and fitting the vehcile hood operated , hood lifting pump removing and taken to machine shop stripping and checking parts seals and o rings damaged shaft damaged filling metal and finishing and pump assy and fitting vehvile hood , transfer mounting bracket auxiliary gear box , auxiliary gear box mounting male and nut and bolt , all electrical checking, service and burned and damaged looms change all plighting system testing , the above all parts removing the vehcile and after service fitting the vehcile testing mechanical charges , ignition switch , mounting bracket for transfer case , male and female nut and bolt for transfer case , clutch booster , above parts removing and new parts fitting mechanical charge , full electrical system checking and rectified of burning and damaged loom and sockets and relays

CTN :40704072 Due date: 07 Aug, 202507 Aug, 2025 NA
Tender For bid to ras supply of single head surface polishing machines suitable for square pipe and rod. specifications of machine as per pdf uploaded. , roller conveyor of 5 meters at entry and exit , roller conveyor of 1 meters at entry and exit , main motor 5hp , conveyor motor with gear box 0.5hp , head up and down motor with gear box 0.5hp , tools kit , 5 pin plug and socket , lifting jack

CTN :41290630 Due date: 11 Aug, 202511 Aug, 2025 NA
Tender For supply of cover ass spline dia , fly wheel assy , set of gasket for gear , pump element , ring gear , cabin lifting pump rep kit , hose pipe to filter , throttle body sprey , air pressure regulator reducer 70k , brake pad , cmp body sensor , hose , exhaust valve
 Loading, Please wait...

Connect us via What's Up