Get complete information related to latest Pug Mill Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Pug Mill Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Pug Mill Tenders.
Tender For supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pugmill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pugmill , making and installing scrubber and bottle jackets of
Tender For corrigendum : fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pugmill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pugmill , making and installing scrubber and bottle jackets of sulfur f
Tender For corrigendum : providing of custom bid for services - welding, surface grinding & machining of mill stands bed plate to maintain proper pass level (elevation) of rolling stands of bar mill and in situ machining jobs at wrm
Tender For supply of 2003655 , 2003690 , 2003708 , 2003717 , 2003733 , 2003734 , 2003735 , 2003736 , 2003737 , 2003738 , 2003739 , 2003740 , 2112483 , 2112484 , 2114138 , 2114139 , 2114146 , 2114152 , 2114162 roll2003655 material : alloy cast steel hardness : 40-45 shore c drawing reference : 1-d22939, rev-c tensile strength : 85 to 100 kgf/mm stand no : billet mill 1 & 2 size : 850 x 1200 mm barrel hardness : 40-45 shc roll approximate unit weight : 7.35 tons uts : 85-100 kgf/sq.mm neck hardness :40-45 shc neck runout :0.04 mm roll coating : anti-corrosive ring hardness :600-700 hv3 test certificate required : yes ring drawing no : mec/1/22938/rev c ----------------------------------- special instructions: ----------------- ------------------ 1) ultrasonic,uts & %elongation tests shall be done and certified. 2) flat wobblers to be strictly concentric with roll neck journals. 3) rolls to be suitably packed and numbered for identity. 4) the microstructure should be free from continuous network of carbides along the grain boundaries. 5) t.c. to be given along with micro-structure photograph. a seperate copy to be sent to d.g.m(rs&rs) at the time of delivery. 6) the rolls shall be guaranteed against manufacturing defects such as blow holes, cavity, non-metallic inclusions, pipe segregation, cracks, hard spots, flakes etc which may adversely affect their service life. 7) should any roll fail prematurely or give sub-standard performance due to the above defects, the suppliers shall rectify the defects at their cost wherever possible to the entire satisfaction of vsp or make prorata compensation or make full replacement if the roll has been ) /bid number : gem/2026/b/7416074 * /dated: 16-04-2026 & & / bid document 1 / 40 rejected before use. 8) the rolls are also to be guaranteed for the roll life as mentioned or 5 years from the date of supply to vsp which ever is earlier.this guarantee clause superseeds, guarantee mentioned elsewhere in the po(a/t), in this regard. 9) hardness test of end ring shall be done and certified. 10) these rolls are used in roughing stands of hot rolling mill. roll set life: bh1=14.35, bh2=14.55 lakh tons, roll2003690 material : sg cast iron (accicular) hardness : 70-75 shore c drawing reference : 1/4012885, rev-e stand no : bar mill 19 & 21 size : 360 x 600 mm barrel hardness : 70- 75 shc roll approximate unit weight : 0.70 tons neck hardness :38-45 shc neck run out : 0.04 mm roll coating : anti-corrosive coating drop in hardness : 1 shc per 10mm on barrel depth ---------------------------------- -------------- special instructions: -------------------------------------- ---------- 1) flat wobblers to be strictly concentric with roll neck journals. 2) rolls to be suitably packed and numbered for identity. 3) t.c. to be given along with micro-structure photograph. a seperate copy to be sent to d.g.m(rs&rs) at the time of delivery. 4) the rolls shall be guaranteed against manufacturing defects such as blow holes, cavity, non-metallic inclusions, pipe segregation, cracks, hard spots, flakes etc which may adversely affect their service life. 5) should any roll fail prematurely or give sub-standard performance due to the above defects, the suppliers shall rectify the defects at their cost wherever possible to the entire satisfaction of vsp or make prorata compensation or make full replacement if the roll has been rejected before use. 6) the rolls are also to be guaranteed for the roll life as mentioned or 5 years from the date of supply to vsp which ever is earlier.this guarantee clause superseeds, guarantee mentioned elsewhere in the a/t, in this regard. 7) these rolls are used in hot rolling mill. roll set life1: 19re16&18=2.00,19re20=1.62 l.tons roll set life2: 21re25=2.34, 21re36=0.7 lakh tons roll set life3: 21re28&re32=0.90, 21re32, re36=0.70 lakh tons roll set life4: 21rore16,18=2.16, 21re20=2.13 lakh tons, roll2003708 material : sg cast iron (accicular) hardness : 70-75 shore
Tender For supply of rolling mill rolls for stand 3v 5v 7v 8h 9v : : - 3v stand roll for 8mm dia cc rod drgno10006625 reva moc h13 tool steel , 5v stand roll for 8mm dia cc rod drgno10006630 reva moc h13 tool steel , 7v stand roll for 8mm dia cc rod drgno10006633 reva moc h13 tool steel , 8h stand roll for 8mm dia cc rod drgno10006635 reva moc h13 tool steel , 9v stand roll for 8mm dia cc rod drgno10006637 reva moc h13 tool steel