Get complete information related to latest Pvc Ducting Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Pvc Ducting Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Pvc Ducting Tenders.
Tender For supply of top and bottom rubber gasket for traction motor cooling blower duct as per els/lgd/drg no. c/els/lgd/aux/4/61. [ warranty period: 30 months after the date of delivery ]
Tender For supply installation commissioning of analyzer flp hvac units at bpcl bina refinery - flp analyzer hvac pakage ac unit 5.5 tr , removal damaged ac , desitc of hvac , misc air conditiong duct insulation , pvc drain 32mm , hvac ahu volume contrl damper , hvac ahu refrigerant 50.8mmod , fbr ac copper piping . , sup n ins canvas connectn duct
Tender For set of gasket for scmrb duct as per els vskp drawing no. els/vskp/2019/18, item no. 01 to 04 only. each set consist of four items four nos only. one set sample to be got approved before bulk supply [ warranty period: 30 months after the date of delivery ]
Tender For supply of set of single duct leather bellows comperising type-i qty 02 nos. & type-ii qty 0 4 nos. (02 items 06 nos.to rdso drg. no. skel-4893 alt-1 or latest & rdso specification no. spec/ e-7/06 rev-2 of july 2002. [ warranty period: 30 months after the date of delivery ]
Tender For work contract for duct velocity and (cfd) analysis of flue gas ducts from eco outlet to id fan inlet alongwith design, manufacture supply and erection of diverter plates, application of refractory at boiler of 1x500 mw unit
Tender For removal and refixing of insulation either damaged or required for repair works on fg,pa,sa duct walls raph,valves,valves piping, water wall tubes around soot blowers, steam headers and dampers etc of units 5 & 6 as and when required and including annual overhaul period during year 2025-26.
Tender For mtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion joints and providing insulation for pa inlet duct to mill for mills 1a to 1f during annual overhaul 2025 26