Tender For tiruppur corporation_drilling of new borewell, construction of motor room, supply and fixing of 5000 litre capacity hdpe tank and extension of borewell water distribution pipe line at kumaran colony in ward no.1.
Tender For tiruppur corporation_construction of motor room and supply and extension of borewell water distribution pipe line at sidco street and nethaji street in ward no.10.
Tender For repairs and rectification of various sizes of water supply distribution pipelines and scover points in ae-xi section areas in works division 3 area during summer season to mitigate heat wave action plan-2026. 2nd call general funds
Tender For engaging 4000 litters capacity water tanker on hire basis for a period of 3 months to unserved areas for maintenance of water supply distribution network system in ae-3 & 4 section, circle-1 area. (3rd call)
Tender For engaging 4000 litres capacity water tanker on hire basis for a period of 3 months to unserved areas for maintenance of water supply distribution network system in ae-v, vi & vii sections, circle-i area. (3rd call)
Tender For supply of spares for repair of cooling towers girt , do - but girt 14 0x1 58 x 5 5 8 , do-- but, girt 12 x 4 x 3 , do-- but stair wooden planks with 32 , do-- but stair steps 9 x 1-1 2 x 32 , pvc c type drift eliminator with supporting clamps , splash bar pvc u bar 4 long , stainless steel materials ss bolt with one nut 9 1 2long , stainless steel materials ss bolt with one nut 9 long , stainless steel materials ss bolt with one nut -5 1 2 long , stainless steel materials ss bolt with one nut 8 long , stainless steel materials ss bolt with one nut 8 1 2 long , p p ring 70 75 mm size od , frp corrugated sheets 3 00 mtr , cooling tower structure girt 10 , cooling tower structure girt 8 , cooling tower structure girt 12 , cooling tower structure girt 12 0 , cooling tower structure column 15 , cooling tower structure column 12 0 , cooling tower structure- column 10 , cooling tower structure diagnals 7 , fan deck floor 8 , hotwater distribution floor members without hole , hotwater distribution floor members with standard hole , cooling tower structure except newzeland radiate pine basin seal 8 , cooling tower structure except new zeland radiate pine basin side 12 , cooling tower structure except new zeland radiate pine basin end 10 , cooling tower structureexcept new zeland radiate pine basin end 8 -0 , cooling tower structure except new zeland radiate pine eliminator blade 6 , chemical treated pine wood timber , eliminator frame plywood 1st pass 13 long , materials made of marine plywood , grid support 4 , eliminator wire of 1 3 long , screw shank nails 3 long , screw shank nails 2 long , screw shank nails 1 long , ss bolt with one nut 8 1 2 long , ss bolt with one nut 6 long , ss bolt with one nut 5 long , ss bolt with one nut 8 long , ss bolt with one nut 7 long , ss bolt with one nut 4 long , ss bolt with one nut 7 1 2 long , ss bolt with one nut 5 long , ss washer standard cut 12mm , ss washer standard for 3 8 dia bolt , ss washer 2mm appx thick 3 , spiral target nozzle , p. p. ring small size black , mastic compound , marine plywood bwr grade as is , frp corrogated sheets 1 25 mtr , corrugated ac fc sheet louvers 6mm , labour rate for replacement of existing wooden , labour rate for replacement of top deck , labour rate for repair rectification replacement of main wooden , main structure of cooling tower cells staircases by removing , cooling towers from top deck to water distribution platform , wooden supports and ss hardware and replacing the same
Tender For supply, delivery and distribution of erk items for the yuva aapda mitra schemes in state of rajasthan - personal life saving jacket with head support , led rechargeble lithium torch with solar panel , safety gloves , pocket knife , first aid kit , gas lighter , whistle , water bottle , rucksack bag , mosquito net , uniform dress t shirt , raincoat poncho , gumboots , safety goggles , safety helmet , static multipurpose rope defence 50 meter