Get complete information related to latest Rack Pinion Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Rack Pinion Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Rack Pinion Tenders.
Tender For corrigendum : supply of machinery spares - supply of machinery spares, c.s. trash plate machined confirming to is-1030 grade 23/45. free from blow holes .as per drg., grooving as per drg.-1020-mh-0402-01-171(rate should be quoted lum sum)( mill no. 1 ), drilling as per drg. ----------do---------(rate should be quoted lum sum)( mill no. 1 ), grooving as per drg. bcsm/mh/113 (mill no. 2 )(rate should be quoted lum sum), drilling as per drg. ----------do--------- (mill no. 2 )(rate should be quoted lum sum), grooving as per drg. bcsm/mh/112 (mill no. 3)(rate should be quoted lum sum), drilling as per drg. ----------do--------- (mill no. 3)(rate should be quoted lum sum), grooving as per drg. bcsm/mh/112(mill no. 4)(rate should be quoted lum sum), drilling as per drg. ----------do---------(mill no. 4)(rate should be quoted lum sum), mill no.1c.s. scraper with machining as per drawing 1020-mh-0402-01-255 & 256, grooving of top scraper as per drg.1020-mh-0402-01-256(rate should be quoted lum sum), grooving of discharge scraper as per drg.1020-mh-0402-01-255(rate should be quoted lum sum), drilling as per drg. ----------do---------(rate should be quoted lum sum), mill no.2m.s. scraper with machining as per drawingmh-ts-02-r1, grooving of top scraper as per drg. ----------do------(rate should be quoted lum sum), drilling as per drg. ----------do---------(rate should be quoted lum sum), m.s. scraper with machining as per drawing mh-ds-02-r1, grooving of discharge scraper as per drg. ----------do---------(rate should be quoted lum sum), drilling as per drg. ----------do---------(rate should be quoted lum sum), mill no.3&4m.s. scraper with machining as per drawing mh-ts-03-r1, drilling as per drg.- ------do--------(rate should be quoted lum sum), grooving of top scraper as per drg.- ------do--------(rate should be quoted lum sum), m.s. scraper with machining as per drawing mh-ds-03-r1, grooving of discharge scraper as per drg.- .------do--------(rate should be quoted lum sum), drilling as per drg. ----------do---------(rate should be quoted lum sum), mill no.2,3 , pitch 50mmm.s. scraperwith machining as per drawing(grpf pressure shoot), grooving of top scraper as per drg. bcsm /mh/015 (rate should be quoted lum sum), grooving of bottom scraper as per drg. bcsm /mh/016 (rate should be quoted lum sum), drilling as per drg.(rate should be quoted lum sum), mill no. 4, pitch 40mmm.s. scraperwith machining as per drawing(grpf pressure shoot), grooving of top scraper as per drg. bcsm /mh/017 (rate should be quoted lum sum), grooving of bottom scraper as per drg. bcsm /mh/018 (rate should be quoted lum sum), drilling as per drg. (rate should be quoted lum sum), c.s crown pinion confirming to is-1030 grade 23/45 free from blow holes and proof machine as per drg., mill no.1 as per drg.(rate should be quoted lum sum), mill no.2,3&4 as per drg.(rate should be quoted lum sum), cane cutting knives, cane cutting knives made from shock resistance ms plate 25 mm thick confirming to is-2062. and tested at hardness-500 bhn tensile-65 kg/mmyield strength-50 kgf/mm elongation-20 % minwith proper heat treatment to avoid breaking the knives. as per drawing no. 1020-mh-0303-1700-105with hard facing, cane cutting knives made from shock resistance ms plate 25 mm thick confirming to is-2062. and tested at hardness-500 bhn tensile-65 kg/mmyield strength-50 kgf/mm elongation-20 % minwith proper heat treatment to avoid breaking the knives. as per drawing no. 1020-mh-0303-1-105with hard facing, c.s trash beam, c.s trash beam as per drg.bcsm/mh/0164
Tender For unit koress 224 repair work-, cutting out the old rotted neck nut of the depression of the ring unit and taking out the rear crown pinion and repairing and refitting it., , cutting the cross of the shaft of the unit, taking out the shaft and installing a new cross and fitting it back., , straightening of shaft on hydraulic press., , removing the old pinion bearing and installing a new one., , remove axle and install new packing., , install new oil meter pipe., , removing the brake pipe and installing a new one and setting the brake., , loading and unloading by rotary head crane., , removing the rotary head plates of the ring, welding them and machining them as per the size of the fibre leaves on the let machine and then fitting them back., , rotary head removing all hydraulic pipes and fitting new pipes.