Get complete information related to latest Radiotherapy Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Radiotherapy Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Radiotherapy Tenders.
Tender For supply of - magnetic particle inspection yoke type-02 nos, pie gauge for mpi-02 nos, radiography film densitometer-02 nos, uv lamp for fluorescent mpi and dpt-02 nos along with all accessories , group-5 - stay at site including lodging, boarding, local conveyence etc for supervision of erection and commissioning etc at site-02 days in talcher and 02 days in lara , group-5 - site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for sup of e and c etc at site-01 visit in talcher and 01 visit in lara , group-6 - radiation survey meter-02 nos, personal digital dosimeter-04 nos, ultrasonic testing machine-conventional with probes and calibration blocks-02 nos with all accessories , group-6- stay at site including lodging, boarding, local conveyence etc for supervision of erection and commissioning etc at site-02 days in talcher and 02 days in lara , group-6 - site visit - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for sup of e and c etc at site02 visit in talcher and 02 visit in lara , group-7- digital radiography-02 nos along with all accessories , group-7stay at site including lodging, boarding, local conveyence etc for supervision of erection and commissioning etc at site-04 days in talcher and 04 days in lara , group-7 - site visit - - should include travel expenses to-fro site, visainsurance-if applicable, intermediary stay- for sup of e and c etc at site-02 visit in talcher and 02 visit in lara , group8- optical microscope for replica interpretation,optical microscope and image analysis system, stereo microscope with camera attachment-02 nos , group-8- stay at site including lodging, boarding, local conveyence etc for supervision of erection and commissioning etc at site-01 days in talcher and 01 days in lara , group-8- site visit should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for sup of e and c etc at site02 visit in talcher and 02 visit in lara , group-9- computed radiography-cr-scanner-02 nos-alongwith all accessories please refer price schedule , group-9- stay at site including lodging, boarding, local conveyence etc for supervision of erection and commissioning etc at site-04 days in talcher and 04 days in lara , group-9- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for sup of e and c etc at site-02 visit in talcher and 02 visit in lara , group-10- hardness tester rebound type-02 nos and hardness tester_uci method-02 nos-along with all accessories , group-10- stay at site including lodging, boarding, local conveyence etc for supervision of erection and commissioning etc at site-02 days in talcher and 02 days in lara , group-10- site visit - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for sup of e and c etc at site01 visit in talcher and 01 visit in lara , group-11radiography film viewer-04 nos, radiography film samplesasme-02 nos , magnetic particles inspection-coil type with cable-02 nos, gaussmeter for mpi-02 nos, ni-cr panel for dpt-02 nos , group-11- stay at site including lodging, boarding, local conveyence etc for supervision of erection and commissioning etc at site-02 days in talcher and 02 days in lara , group-11- site visit - - should include travel expenses to-fro site, visa- insurance-if applicable, intermediary stay- for sup of e and c etc at site-01 visit in talcher and 01 visit in lara , group-12-pls refer item description and price schedule for details_holiday detector, stethoscope, vibration meter, comparator, roughness meter, noise meter, torque wrench etc , group-12- stay at //bid details2 / 46site including lodging, boarding, local conveyence etc for supervision of erection and commissioning etc at site-10 days in talcher and 10 days in lara , group-12- site visit - should include travel expenses to-fro site, visa- insurance-if applicable,
Tender For corrigendum : supply of digital radiography system type c (qty:10) - digital radiography system 50kw ceiling suspended type, single detector with all accessories as per specifications except the following, x-ray table 6 way floating table, dry imager with 2 online trays, additional detector (rate fixed for three years from the date of price bid opening), light weight lead apron with thyroid gaurd, additional workstation, x-ray trolley table (not taken for evaluation), x-ray table four way (not taken for evaluation), x-ray view box double film (not taken for evaluation), cost of one viewing station (hardware) with necessary software and ups (not taken for evaluation), fully automated full length image stitching on table and vertical bucky necessary hardware and software (not taken for evaluation), 15.12.2:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area beyond 3 sq. metres, 15.12.1:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area 3 sq. metres and below, 15.23.1:dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.for thickness of tiles 10 mm to 25 mm, 15.3:demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of engineer -in-charge., 15.57:dismantling aluminium / gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres lead as directed by engineer - in-charge, 15.7.4:demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.in cement mortar, 15.60:disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved, 2.1.1:earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:all kinds of soil, 50.2.25.1:filling with contractors own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-in-charge, 2.34.1:supplying chemical emulsion in sealed containers including delivery as specified.chlorpyriphos / lindane emulsifiable concentrate of 20%, 2.35.1.1:diluting and injecting chemical emulsion for post -constructional anti-termite treatment (excluding the cost of chemical emulsion):along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300mm including excavation channel along the wall & rodding etc. complete:with chlorpyriphos /lindane e.c. 20% with 1% concentration, 50.4.1.1:providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc., 50.5.33.2:providing and laying in position machine batched and machine mixed design mix m-20 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the
Tender For corrigendum : supply of digital radiography system type b (qty:10) - digital radiography system 80kw ceiling suspended type, single detector with all accessories as per specifications except the following, x-ray table 6 way floating table, dry imager with 2 online trays, additional detector (rate fixed for three years from the date of price bid opening), light weight lead apron with thyroid gaurd, additional workstation, x-ray trolley table (not taken for evaluation), x-ray table four way (not taken for evaluation), x-ray view box double film (not taken for evaluation), cost of one viewing station (hardware) with necessary software and ups (not taken for evaluation), fully automated full length image stitching on table and vertical bucky necessary hardware and software (not taken for evaluation), 15.12.2:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area beyond 3 sq. metres, 15.12.1:dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:of area 3 sq. metres and below, 15.23.1:dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.for thickness of tiles 10 mm to 25 mm, 15.3:demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of engineer -in-charge., 15.57:dismantling aluminium / gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres lead as directed by engineer - in-charge, 15.7.4:demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.in cement mortar, 15.60:disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved, 2.1.1:earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:all kinds of soil, 50.2.25.1:filling with contractors own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site engineer-in-charge, 2.34.1:supplying chemical emulsion in sealed containers including delivery as specified.chlorpyriphos / lindane emulsifiable concentrate of 20%, 2.35.1.1:diluting and injecting chemical emulsion for post -constructional anti-termite treatment (excluding the cost of chemical emulsion):along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300mm including excavation channel along the wall & rodding etc. complete:with chlorpyriphos /lindane e.c. 20% with 1% concentration, 50.4.1.1:providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc., 50.5.33.2:providing and laying in position machine batched and machine mixed design mix m-20 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the