Get complete information related to latest Rail Spares Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Rail Spares Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Rail Spares Tenders.
Tender For ipgmer-sskmh -- emergent rectification of damaged ms black steel pipe 200mm, 150mm, 80mm various location of sskm compound, re-arranged sprinkler line of main block surgical store, fixing 2 way inlet valve, hose box set at 33 kva sub station_2025-26
Tender For providing of facility management services - lumpsum based - industrial; manual cleaning of box culvert/hume culverts at different location of mine at gevra project of gevra area 3rd call; consumables to be provided by service provider (inclusive in contract cost)
Tender For custom bid for services - providing non-critical jobs at nashik lpg plant-manpower outsourcing services - man-days based; manpower outsourcing services - fixed remuneration; manpower outsourcing services - minimum wage: 1. segregation of dpt, and omc cylinders and without o-ring cylinders stacking the same: segregating of dpt, hr, cr, eis, ts, rejected, omc and without o-ring cylinders from conveyor during plant operation and stacking these cylinders at designated position as per officer in-charge. count of dpt, hr, eis, ts, rejected and omc cylinders to be provided box-lorry wise to unloading tallyman to record same on erv and unloading register. new o-ring need to place in without o-ring cylinders. removal, stacking and unlocking/locking of cylinders over chain conveyor & floor as and when required during plant operation as directed by officer in-charge. bpcl may ask the manpower to perform any other work/job during the shift as directed by officer in-charge. positioning of manpower would be decided by bpcl officer in-charge. typically, this service would require deployment of estimated two man-powers in each shift, i.e., total of estimated four man-powers in a day. 2. purging of new, dpt and hr cylinders and segregation of hr /cr /eis /ts /rejected/ and sloc wise stacking of dpt /hr /cr /eis /ts /rejected/omc cylinders: ensuring purging of all types of new , pressure tested and hot repaired cylinders in shift and handover to shed officer and keep record with signature of shed officers storage location wise stacking of segregated cylinders having all hr, cr, eis, ts, rejected and omc cylinders with them. stacking of these cylinders at designated position to be done as advised by officer in-charge. dented/rejected cylinders further need to be checked for depth of dent and need to be recorded before rejecting the cylinder. removal of cylinders from chain conveyor and feeding cylinders to carousal from empty cylinders floor stock, as and when required during plant operation as directed by officer in-charge. bpcl may ask the manpower to perform any other work/job during the shift as directed by officer in-charge. positioning of manpower would be decided by bpcl officer in-charge. typically, this service would require deployment of estimated two man-powers in each shift i.e., total of estimated four man-powers in a day. 3. replacement of o ring- replacement of all lpg cylinder o-ring which are rejected by o-ring leak detecting machine or cvt and circulating of test cylinder in the loop. removal, stacking and unlocking/locking of cylinders over chain conveyor & floor as and when required during plant operation as directed by officer in-charge. bpcl may ask the manpower to perform any other work/job during the shift as directed by officer in-charge. positioning of manpower would be decided by bpcl officer in-charge. typically, this service would require deployment of estimated two man-powers in each shift, i.e., total of estimated four man-powers in a day. 4. lpg cyl handl prod line sealing (seal placement) seal placement after the cylinder has been checked at test bath and before it reaches the hot air sealing machine. it has to ensure both 14.2 kg and 19 kg cylinder on the line has to have seal placed on it before it could be sealed by hot air sealing machine. it has to ensure that there should be no line jam due to cylinders stuck at the passage of sealing machine if found need to rectify immediately as per instruction of officer in charge. there should be no waste of seals and the seal box should be placed in proper manner and to maintain the good housekeeping. typically, this service would require deployment of estimated two man-powers in each shift, i.e., total of estimated four man-powers in a day. 5. shifting of defective cylinders..
Tender For bid to ras supply of 32ch nvr with 2 sata hdd support , 16ch nvr recorder , 9ch nvr , 3mp night vision dome camera ip , 3mp night colour vision with face detection , 6tb hdd disk , 4 1 2 port sfp uplink poe switch , wireless mouse , ip67 pvc box weatherproof , 4u rack standard , pvc junction box-metal , cat6 cable outdoor , cable laying in pipe with accessories , camera dome bullet as per location need , poe junction box installation , 5port giga desktop switch , 22 inches led display standard
Tender For corrigendum : providing of goods transportation service - monthly based service - outside state; ndian railway spares/material; open body lcv truck
Tender For procurement and installation of different instruments for instrumentation of earth dam and spillway in deo irrigation project for the year 2025. - supply of fiberglass reinforced plastic (frp) make universal enterprises an improved venturi plate conformed to is: 9108 for accurate measurement of water flowing through channels comprising of masonry construction provided with pre-fabricated glass fiber lining on both sides, a side chamber provided in one side masonry wall of the said flume on the upstream side, a pipe provided at the bottom of the chamber connecting the said chamber with the water flowing through the notch, a float means provided in the said chamber, enabling recording the rising or falling level of water in the said chamber such as a scale provided in the said chamber, moulded engraved gauge marking in lit/sec and also in centimeter including moulded and engraved discharge table, capacity marking, flow direction, m.s pipe stiffeners, hold fasts, sand treatment on the backside of plate but excluding gst as per the instruction of engineer-in-charge etc. complete, inside spillway foundation gallery - 15 lit./sec. v-notch, seepage drain - 90 lit./sec. v-notch, calibration marks:- supply of polymers composites improved calibration marks make universal enterprises with contact molding process, both side finish, m.s. strip embedded inside, engraved and molded marking for bands and figures covered with radium and covered with two coats of polyurethane for surface protection with marking in reduced levels, sill, fsl, frl, mwl but excluding gst as per the instruction of engineer-in-charge etc. complete, supply vw up-lift pressure meter provision for connected to das make : aimil ltd. uplift pressure meters are used for measuring and recording of uplift pressures acting in foundations of concrete/masonry dams. vibrating wire type uplift pressure meter : range: 0.2 mpa to 5.0 mpa./7ksc accuracy: 0.5 -1 % fs. temp limit: - 10 to 70 deg c. coil resistance: 140 - 160 ohm thermistor: ysi-44005 or equivalent. material: stainless steel cable: 1m, 4-core borehole for uplift pressure meter at foundation gallery (inside spillway) should be straight from foundation level and clear. proposed location : inside spillway foundation gallery in overflow section: 7 no. non overflow section: 2 no. purpose: uplift water pressure measurement. (but excluding gst), supply automatic seepage measuring system make : aimil ltd / sysgeo italy or equivalent vibrating wire water leakage measuring systems are used for measuring water leakage and flow in dam galleries by installing v notch weir coupled with vibrating wire sensor for remote monitoring of water leakage. sensor type: sensor : vibrating wire precision water level sensor range: 300mm resolution: 0.025%fs material : stainless steel excitation : sweep or pluck assembly: v.w. type sensors enclosed in an environmental proof fibre glass box. splicing kit & adhesive required accessories. proposed location : inside spillway foundation gallery: 1 no. toe drain: 1 no. (drainage outlet) purpose: seepage water measurement in liter per second (but excluding gst), supply data logger or data acquisition system aimil make dt85g with cem20 or ace s korea analog channels 16 analog input channels each channel is independent and supports: one isolated 3-wire or 4-wire input, or two isolated 2-wire inputs, or three common referenced 2-wire inputs. expansion requires optional cem20 sampling integrates over 50/60hz line period for accuracy and noise rejection maximum sample speed: 40hz effective resolution: 18 bits linearity: 0.01% common mode rejection: >90db line series mode rejection: >35db vibrating wire frequency range: 500 to 5khz coil resistance: 50 to 200 stimulation method: single pulse pluc digital channels 8 bi-directional channels input type: 8 logic level (max 20/30v) output type: 4 with open drain fet(max: 30v, 100ma) 4 with logic output alarms power supply , sim card will be in your scope. propo
Tender For providing of facility management services - lumpsum based - industrial; manual cleaning of box culvert/hume culverts at different location of mine at gevra project of gevra area 2nd call; consumables to be provided by service provider (inclusive in contract cost)
Tender For machhundri irrigation scheme construction of new asphalt, box culvert and r.c.c road on various location at machhundri dam site.(fourth attempt)
Tender For sc division- kzj-bza section - proposed construction of limited height subway (lhs) new bridge no. 559 (a) km 421/33-35 in lieu of closed level crossing (trespassing location) at kesamudram station yard as precast rcc box of size 1x3.00x2.65m by air pushing method