Web Analytics Made Easy - StatCounter

Rail Transport Service Tenders

Get complete information related to latest Rail Transport Service Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Rail Transport Service Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Rail Transport Service Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :45210032 Due date: 06 Jul, 202606 Jul, 2026 NA
Tender For supply of items as per the scope of supply, enclosed with tender and retro-fitment of add/ord feature in m/s faiveley transport rail technologies india pvt. ltd. make high reach pantograph at site supplied against rdso specification no. rdso/2007/el/ spec/0054 rev '3' amend.1 for wag7 & wap4 locomotives at respective loco sheds. the retrofitment shall comply to rdso specification no. rdso/2007/el/spec/0054 rev '3' amend.2. [ warranty period: 30 months after the date of delivery ] ]

corporations/Associations/Others

CTN :45263412 Due date: 05 Jun, 202605 Jun, 2026 NA
Tender For supply of 4500 sets of stay set complete - supply of silicagel blue, 0.6kva ups, stay set complete( quote price for single unit only), silicagel blue 10 to 12mm, pole pit for 9.0m and 9.14 m psc/rcc / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr, ordinary soil, semi rocky soil, heavy rocky soil where blasting/ cheseling required [specific approval should be obtained from concerned ee], stay pit, in ordinary soil [0.95 x 0.6 x 1.2m], semi rocky soil, stay pit in heavy rocky soil where blasting/ cheseling reqiured [specific approval should be obtained from concerned ee], erection of poles & stays (including refilling of excavated earth), erection of 7.5m / 8.0m poles [rcc / psc], erection of 9.00m / 9.14m rcc / psc/rail pole, tubular pole and all metal poles, stay set, erection stay set complete, stay erection without rod and pit, replacement of stay rod only. (including stay pit excavation & refilling & erection), replacement of guy shackle only in existing stay, erection of line materials, fixing of lt 1 ph "x" arm, fixing of lt/ht ti fitting, fixing of lt 3 ph "x" arm, fixing of 3[1/2] v ` x arm, fixing of 4[1/2] v ` x arm, fixing of 5 v x arm, fixing of tapping channel / guarding "x" arm, providing of line spacers in lt lines 1 phase, providing of line spacers in lt lines 3 phase, erection of ab switch with pt insulator & jumpering complete, erection of centre rotating switch ab switch complete, fixing of ht pin insulator / strain disc, 11 kv pin insulator with pin, 11 kv strain disc / polymer disc with hardware, 22 kv pin insulator with pin, 22 kv strain disc / polymer disc with hardware, 33 kv pin insulator with pin, 33 kv pin strain disc/polymer disc with hardware, fixing of lt pin insulator with pin, lt shakle with hardware, fixing of aluminium knob, paving stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from road side to work spot] per run, upto 7/2.59 mm acsr, 7/2.50 aaac including pvc cable upto 25 sqmm, acsr 7/3.35mm & 7/ 3.15 aaac including pvc cable above 25 sqmm, acsr 7/4.09 mm, above 7/4.09 mm acsr & dog conductor, earthing wiring and connection including transporting of earth pipe and excavation of pit], transformer structure earthing 10ft depth - 3 nos of pipe through tubes, dp earthing including all works [double side earthing], erection of 4th earth pipe including earthing, earthing of poles, earth pit masonary work 3 nos earth pits or using 3 nos concrete tub., replacement of detoriated earth pipe per location, concreting with mixture 1:3:6 [including all materials]., mass concreting for centre support for 2 feet including all materials, mass concreting for pole0.6x0.6x1.25m.with coping, sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping, sleeve concreting for stay set 0.3 m & 0.75 long, erection of distribution transformer structure complete, excavation of structure pole pits 0.9 x 0.9 x 1.83 mtr, transporting of pole to pit location 2 nos., erection of poles 2 nos, excavation of stay pit 4 nos, erection of stay set (4 sets), mass concreting (cement:sand:jelly supplied by the contractor) 2 nos., erection of 22 kv ab switch, ttransformer structure earthing 10ft depth - 3 nos of pipe through earth tubes, erection of top channel, bed channel [2 nos channel] erection, cross with stud for bed channel erection, erection of belting angle / hg fuse angle, erection of hg fuse set, erection of ht las with jumpering and earthing, erection of lt las with jumbering and earthing, erection of jumpering [ht side], transformer wiring in lt side including jumpering bus bar etc., erection lt open type fuse unit arrangement single, erection lt open type fuse unit arrangement double, painting of stru. complete excluding dt [two coat of red oxide] all metal parts(excluding cost of paint)., painting of stru. complete excluding dt [one coat alu paint, excluding cost of paint), colour washing of 2 numbers structure pole [excluding

Central Government / Public Sector

CTN :45262127 Due date: 11 Jun, 202611 Jun, 2026 NA
Tender For annual maintenance contract (amc) on m/s faiveley transport rail technologies india private limited for axle mounted disc brake system (amdbs) fitted in lhb coaches through oem on single tender basis

Central Government/Public Sector

CTN :45297880 Due date: 29 May, 202629 May, 2026 NA
Tender For supply of breather plug for lhb coaches as per kb part no b66529/5 or equivalent of faiveley transport rail technologies india limited / escorts india private limited or its equivalent. [ warranty period: 30 months after the dateof delivery ] ]

Central Government/Public Sector

CTN :45285061 Due date: 08 Jun, 202608 Jun, 2026 NA
Tender For supply of air dryer pcb assembly to ftil part no. 780354000 ftrtipl part no 780354000. make : faiveley transport rail technologies [ warranty period: 30 months after the date of delivery ] ]

CTN :45139399 Due date: 25 May, 202625 May, 2026 NA
Tender For corrigendum : providing of handling and transport on lumpsum basis - liaisoning contract for the movement of one and half million ton bridge linkage coal in rail mode from mines of any subsidiary of coal india ltd to ghatampur thermal power project gtpp site

Central Government/Public Sector

CTN :45153511 Due date: 18 May, 202618 May, 2026 NA
Tender For supply of dump valve with bracket as per m/s faiveley transport rail technologies india limited, part no.790040360a. [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :45120366 Due date: 20 May, 202620 May, 2026 NA
Tender For supply of emergency brake accelerator eb3 s/l with bracket to m/s. ftil part no.072001000 make-faiveley transport rail technologies india private limited [ warranty period: 30 months after the date of delivery ]

Central Government And Public Sector

CTN :45038096 Due date: 18 May, 202618 May, 2026 NA
Tender For corrigendum : supply of breather plug for lhb coaches as per kb part no b66529/5 or equivalent of faiveley transport rail technologies india limited / escorts india private limited [ warranty period: 30 months after the date of delivery ]

Central Government / Public Sector

CTN :45077353 Due date: 18 May, 202618 May, 2026 NA
Tender For supply of n-1 board to ftrtil part no.1/600009a for lhb coaches. make: faiveley transport rail technologies india limited. [ warranty period: 30 months after the date of delivery ]
 Loading, Please wait...

Connect us via What's Up