Tender For manufacture and supply of 6 mm thick grsp for channel sleeper to rdso drg. no. t5163 or latest alteration if any with reference date as tender closing date, conforming to indian railway standard specification for rail pads for placing beneath rails, s. no. t55-2023 or latest with reference date as tender closing date. [ warranty period: 30 months after the date of delivery ]
Tender For 1.salem division - nilgiri mountain railway - tsr(p) -13.535 tkm with psc 52 kg metre gauge sleepers 2. salem division - nilgiri mountain railway - trr(s) with 52 kg rails - 21.9 tkm3. through sleeper renewal (primary) psc meter gauge between qlr-ady km 9/850-12/200 (2.350 km) in rack section in sse/pway/onr section4. through sleeper renewal (primary) psc meter gauge between qlr-ady km 7/500-9/850 (2.350 km) in rack section in sse/pway/onr section5. nm railway: ttr (p&c) -1 in 8.5 -11 sets in the sse/pw/onr section.6. nilgiri mountain railway - renewal of through rack bar - 4.800 tkm (between km.7/400 to 12/200)
Tender For open e-tender for the work of different type of track activity like casual renewal of rail-sleeper-switch-sej, tamping of track, deep screening, casual renewal of fittings, assisting track machine etc. with other ancillary work and cleaning of drainage system of bhagalpur(excluding)-jamalpur(excluding) double line (km 307/0-356/315 up & dn/l)in the section of sr. section engineer/p. way-1/jamalpur under assistant engineer/l/jamalpur in the jurisdiction of sr. divisional engineer-iii/eastern railway/malda.
Tender For open e-tender for the work of different type of track activity like casual renewal of rail-sleeper-switch-sej, tamping of track, deep screening, casual renewal of fittings, assisting track machine etc. with other ancillary work and cleaning of drainage system of jamalpur-keul (ex.) double line (km 356/315-402/545 up & dn/l in the section of sr. section engineer/p. way-ii/jamalpur under assistant engineer/l/jamalpur in the jurisdiction of sr. divisional engineer-iii/e. railway/ malda.
Tender For manufacturing, supplying, transportation to trial location, complete installation including layi ng & commissioning, monitoring & maintenance of complete assembly of sleeper and in-sleeper point mac hine compatible with indian railway standards(irs) on ir. [ warranty period: 30 months after the date of delivery ]