Get complete information related to latest Rcc Chimney Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Rcc Chimney Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Rcc Chimney Tenders.
Tender For supply of smoke grey paint , bus green pain , azure blue paint , post office red paint , golden yellow paint , zine chromate red oxide metal primer , decorative alumunium paint , parrot green paint , gp thinner , weather proof heat resistant anti corrosive boiler chimney aluminium paint , black paint , white paint , of white paint
Tender For all electrical construction works of 150 m tall rccchimney with single steel flue for installation of steam and power plant of 5th stream alumina refinery at damanjodi, odisha and related facilities at vishakhapatnam port
Tender For corrigendum : civil, structural and architectural works of boiler, gasifier, esp foundations, mill bunker building, control room buildings, pump house, dg building, stack, chimney, wtp, etp, ahp at lakhanpur, odisha for bharat coal gasification and chemical ltd.
Tender For corrigendum : demolition of rcc elevated water tank near bldg. no. 435 and demolition of old boiler chimney at boiler house near l3 section inside factory at afk.
Tender For supply of chimney for boiler assembly of x class locomotives as per slm index no. x/4/2a/m alt [z] item [1]. for equivalent material specifications refer goc/x/spec-x032 note: 1.the firm may collect the pattern for the item from sse/bs/goc by duly submitting bg/tdr/fdr for the value of rs.25,000/-[ pattern cost ] and return it without any damage along with the material. 2.for material specification, the firm has to submit nabl accredited lab test certificate along with the material supply. [ warranty period: 30 months after the date of delivery ] ]
Tender For cleaning of cooling tower cold basin, cells, inside structures, cep pit, bfp pit etc including miscellaneous cleaning of sludge, ash, garbage etc from chimney hopper and bottom of boiler with surrounding drains etc during overhauling of u 5 and 3 at