CTN :44508311
26 Mar, 2026
NA
Tender For scope of work (sow) as mentioned in tender and schedule of work( 40 )items as given below ,[1] disman,occ/lime terracing 5.000 m3,[2] disman,rcc upto lead 175m 3.000 m3,[3] disman,brick wrk all thick 10.000 m3,[4] earth wrk,excav in trench etc,utg,road 3.000 m3,[6] filg,sand in layer,watering&compacting 5.000 m3,[7] remvng,silt in bf c
ulvert 10.000 m,[8] remvng,silt frm bed of
ug
drainage sys 30.000 m3,[9] remvng,silt&foreign matl frm
drain bed 1200.000 m3,[10] excav,all kind of soil,
upto 25cm 35000.000 m2,[11] prvdg,sh
uttering f/
drain,manhole 30.000 m2,[12] c
utg,bending,fixg,tmt rebars,ms 500.000 kg,[13] pcc wrk,cm1:3:6 by hand mix 2.000 m3,[14] pcc wrk,labo
ur,tools,material,1:2:4 2.000 m3,[15] cement concrete wrk,depth as 19mm,1:2:4 2.000 m3,[16] carrying,
rcc precast slab,3km w/o mortar 2.000 m2,[17] carrying,
rcc precast slab,3km 2.000 m2,[18] brick wrk,cm1:6,cl-75 5.000 m3,[19] brick wrk,all strs,cl-75,cm1:6 5.000 m2,[20] smooth cement sand plaster,1:6,thk12mm 40.000 m2,[21] cement p
unning,thk3mm 10.000 m2,[22] remvng,silt frm bed of batt cover
drain 3500.000 m,[23] s
upply,h
ume pipe,dia50cm,grade:np2 10.000 m,[24] s
upply,h
ume pipe,dia30cm,grade:np2 30.000 m,[25] layg,h
ume pipe,
ust etc frm road surface 300000.000 m2,[30] cutg,kuchcha drain 200.000 m,[31] clng,all kind of roof 3000.000 m2,[32] clng,gutter/roof drain 50.000 m,[33] remvng silt & deposit upto top of drain 50000.000 m,[34] refilg,excavated spoil/earth,15cm 50.000 m3,[35] extra for spoils removal beyond 75m 10000.000 m,[36] layg,tar felting treatment on roof 3500.000 m2,[37] prvdg,screed concrete,1:2:4,12mm 15.000 m3,[38] remvng,tarfelt 1500.000 m2,[39] fixg,upvc pipe,dia160mm,is:13591-1992 70.000 m,[40] supply upvc fitting,bend 87.5 deg,160mm 10.000 ea