Tender For supply of one coach set of details of frame work for train set dtc coaches to drg.no 88914008, alt 'a', col.i - 1 no 88914013, alt 'a', col.i - 1 no 88914020, alt 'c', col.i - 1 no 88914021, alt 'c', col.i - 1 no all the members as per the above drgs. shall be supplied as loose. carline assembly to drg.nos. 72614068, alt 'c', col.i - 1 no 72614069, alt 'c', col.i - 1 no 88914025, alt 'a', col.i - 1 no 88914026, alt 'b', col.i - 1 no welding parts to drg. nos. 88914016, alt "c", col.i - 1 no 88914027, alt "g", col.i - 1 no 88914028, alt "j", col.i - 1 no 88914029, alt "c", col.i - 1 no. all the above items shall be supplied as coach set. special condition : 1. the chair pillars shall be packed in the container as per icf/j&t/sk-1865-alt 'a'. 2. other partition frames not fitting in the container shall be stacked one over the other, secured using packing strip and placed in steel pallet. 3. the height of each stack shall not exceed 750mm for easy handling. 4. suitable and sufficient packing strips to be used such that stacked items do not disintegrate during transit, storage and handling. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For shell kit for memu tc1 jk 941 a. roof assembly 94516001 000 01, alt 'nil' - 1 no. location of sidewall94514001 000 01, alt 'nil' - 1 no. end construction alarm end 94515001 000 01, alt 'a' - 1 no. end construction non alarm end 94515002 000 01, alt nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315, issue status.01,rev.00 with amendment no 01. b.supply of one coach set of body shell items and partition frames for memu/tc/jk 941 to drawing nos: 1. 94410076 000 01 alt nil -2 nos. 2. 94510007 000 01 alt 'b' - 1 no. 3. 94510002 000 01 alt 'a' - 1 no. 4. 94410072 000 01 alt nil - 2 nos. 5. 94410054 000 01 alt nil - 4 nos. c. underframe arrangement 94111001 000 01, alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/spec-147, issue status.01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201,alt 'f'. packing as per icf/j&t/sk-1809,alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframes hould be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. stage inspection. (a) raw materialstage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item] [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For shell kit for memu ndmc jk 962 a. roof assembly 96216001 000 01 alt "a" - 1no location of sidewall 96214001 000 01 alt "nil" - 1 no end construction pail end 94515001 000 01 alt "a" - 1no end construction shunting desk side 96215001 000 01 alt "nil" - 1 no firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315,issue status 01, rev.00 with amendment no 01. b.supply of one coach set of body shell items and partition frames for memu ndmc jk 962 to drawing nos 1. 96210002 000 01 alt "b" - 1 no 2. 96210007 000 01 alt "b"' - 1 no 3. 96210026 000 01 alt "nil"- 1 no 4. 96210046 000 01 alt "nil"- 1 no 5. 96210064 000 01 alt "nil"- 1 no 6. 94410054 000 01 alt "nil"- 2 nos 7. 94410076 000 01 alt "nil"- 1 no 8. 94410072 000 01 alt "nil"- 1 no c. under frame arrangement 96211001 000 01 alt 'd' - 1 no firm shall fulfill the manufacturing facility as per icf/md/spec-147,issue status 01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'f'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the under frame should be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. (a) raw material stage #ensure the raw material used using portable spectrometer (b) jig stage #assembly of front part with sole bar. #assembly of modular frame arrangement. #weld parameters to be checked & recorded (c) trestle stage #marking, drilling & tapping of holes wherever necessary. #marking & placing of detail items. #complete welding wherever necessary. #weld parameters to be checked & recorded #assembly & welding of trough sheets. #dimensional & visual checks. #punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. #short/sand blast to the requirements. #painting process as per the specification. #visual inspection. #final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For shell kit for memu tc2,tc3,tc4 jk 942,943,945 a. roof assembly 94516001 000 01 alt 'nil' - 1 no. location of sidewall 94514001 000 01 alt 'nil' - 1 no. end construction pail end 94515001 000 01 alt 'a' - 1 no. end construction non pail end 94515002 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status.01, rev.04 with amendment no.01 firm shall fulfill themanufacturing facility as per icf/md/spec- 315, issue status.01, rev.00 with amendment no.01. b.supply of one coach set of body shell items and partition frames for memu/tc/jk 941 to drawing nos: 1. 94410076 000 01 alt 'nil' - 2 nos. 2. 94510007 000 01 alt 'b' - 1 no. 3. 94510002 000 01 alt 'a' - 1 no. 4. 94410072 000 01 alt 'nil' - 2 nos. 5. 94410054 000 01 alt 'nil' - 4 nos. c. under frame arrangement 94211001 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/spec-147, issue status.01, rev.02with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'f'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe should be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. (a)raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item] [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For corrigendum : shell kit for memu ndmc jk 962 a. roof assembly 96216001 000 01 alt "a" - 1no location of sidewall 96214001 000 01 alt "nil" - 1 no end construction pail end 94515001 000 01 alt "a" - 1no end construction shunting desk side 96215001 000 01 alt "nil" - 1 no firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315,issue status 01, rev.00 with amendment no 01. b.supply of one coach set of body shell items and partition frames for memu ndmc jk 962 to drawing nos 1. 96210002 000 01 alt "b" - 1 no 2. 96210007 000 01 alt "b"' - 1 no 3. 96210026 000 01 alt "nil"- 1 no 4. 96210046 000 01 alt "nil"- 1 no 5. 96210064 000 01 alt "nil"- 1 no 6. 94410054 000 01 alt "nil"- 2 nos 7. 94410076 000 01 alt "nil"- 1 no 8. 94410072 000 01 alt "nil"- 1 no c. under frame arrangement 96211001 000 01 alt 'd' - 1 no firm shall fulfill the manufacturing facility as per icf/md/spec-147,issue status 01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'f'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the under frame should be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. (a) raw material stage #ensure the raw material used using portable spectrometer (b) jig stage #assembly of front part with sole bar. #assembly of modular frame arrangement. #weld parameters to be checked & recorded (c) trestle stage #marking, drilling & tapping of holes wherever necessary. #marking & placing of detail items. #complete welding wherever necessary. #weld parameters to be checked & recorded #assembly & welding of trough sheets. #dimensional & visual checks. #punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. #short/sand blast to the requirements. #painting process as per the specification. #visual inspection. #final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For corrigendum : shell kit for memu tc1 jk 941 a. roof assembly 94516001 000 01, alt 'nil' - 1 no. location of sidewall94514001 000 01, alt 'nil' - 1 no. end construction alarm end 94515001 000 01, alt 'a' - 1 no. end construction non alarm end 94515002 000 01, alt nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315, issue status.01,rev.00 with amendment no 01. b.supply of one coach set of body shell items and partition frames for memu/tc/jk 941 to drawing nos: 1. 94410076 000 01 alt nil -2 nos. 2. 94510007 000 01 alt 'b' - 1 no. 3. 94510002 000 01 alt 'a' - 1 no. 4. 94410072 000 01 alt nil - 2 nos. 5. 94410054 000 01 alt nil - 4 nos. c. underframe arrangement 94111001 000 01, alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/spec-147, issue status.01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201,alt 'f'. packing as per icf/j&t/sk-1809,alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframes hould be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. stage inspection. (a) raw materialstage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item] [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For corrigendum : shell kit for memu tc2,tc3,tc4 jk 942,943,945 a. roof assembly 94516001 000 01 alt 'nil' - 1 no. location of sidewall 94514001 000 01 alt 'nil' - 1 no. end construction pail end 94515001 000 01 alt 'a' - 1 no. end construction non pail end 94515002 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status.01, rev.04 with amendment no.01 firm shall fulfill themanufacturing facility as per icf/md/spec- 315, issue status.01, rev.00 with amendment no.01. b.supply of one coach set of body shell items and partition frames for memu/tc/jk 941 to drawing nos: 1. 94410076 000 01 alt 'nil' - 2 nos. 2. 94510007 000 01 alt 'b' - 1 no. 3. 94510002 000 01 alt 'a' - 1 no. 4. 94410072 000 01 alt 'nil' - 2 nos. 5. 94410054 000 01 alt 'nil' - 4 nos. c. under frame arrangement 94211001 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/spec-147, issue status.01, rev.02with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'f'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe should be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. (a)raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item] [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply of underframe detail items, welding parts and sheet assembly for train set mc 1. 89011004, col-i, alt 'k' - 1 no, 2. 89011005, col-i, alt 'e' - 1 no, 3. 89011008, col-i, alt 'd' - 1 no, 4. 89011031, col-i, alt 'c' - 1 no. 5. 89011018, col-i, alt 'a' - 1 no, 6. 89011019, col-i, alt 'b' - 1 no, 7. 89011020, col-i, alt 'b' - 1 no, 8. 89011021, col-i, alt 'a' - 1 no, 9. aae11599, alt 'b' - 1 no, 10.aad11703, alt 'b' - 2 nos, 11.aad11739, alt 'nil' - 1 no, 12.89011006, col-i, alt 'e' - 1 no. special condition : 1. all items to be supplied in loose condition with properly labelled. 2. following items from 88911004 are not required: aae11687- 2 nos and aae11688-2 nos. 3. items are to be bundled and labelled for each drawing as in main description. 4. suitable packing to be done to prevent damage during transit, unloading and rust prevention during storage. 5. finished components except ss components shall bethoroughly cleaned and applied with epoxy zinc phosphate primer as per rdso/spec no.m&c/pcn/100 latest to a dft of minimum 60 microns and mdts-094, rev.-01 with amnd-01 or latest shall be followed. for procedure and colour shade excluding the areas as specified in detail drawings. 6. there will be minor changes in the drawings. the firm may be advised to collect final drawings before manufacturing. [safety item] [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply of under frame arrgt for memu/dmc/3ph to drg no. 74511059, alt 'c' col 1. firm shall fulfill the manufacturing facility as per icf/md/spec-147, issue status-01 rev.02 with amendment no.02. special condition : packing condition as per drg no icf/j&t/misc-2487 alt 'b'. the under frame should be supplied as normal side up and side bearer side down. details for satge inspection. (a) raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item] [ warrantyperiod: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply of set of side wall assly and roof complete for lhb ac 3 tier coach(without provision of papis arrangement) note:-(1)crf items are to be manufactured as per dy. cple-iii letter no. rcf/hsq/plg/mpsh/510003/lhb dated 04/04/2024 (2)in drawings "mig welding (131) is to be read as tig welding (141)" as per design letter no. md46231 dated 16.03.2024. , as perdrawing: mp20rseaccn version 11 [ warranty period: 30 months after the date of delivery ] ]