Get complete information related to latest Reformer Tube Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Reformer Tube Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Reformer Tube Tenders.
Tender For supply of boiler tubes : : - straight heat shield with two nos. clamps for water wall tube dia. 63.5mm , straight heat shield with clamps for ltsh straight for tube dia. 44.5mm , heat shield with clamps for water wall screen straight tube for tube dia. 76.1mm , heat shield with clamps for s.h. screen and hanger tubes of dia. 51mm , straight heat shield with clamps for economizer tubes of dia. 32mm , straight heat shield with two nos. clamps for sh and rh tube dia 48 mm , ss rod 10mm
Tender For corrigendum : providing of custom bid for services - phased array ultrasonic testing of boiler tube weld joints old or new during overhauling or shutdown or reserve shutdown at ntpc tanda
Tender For auction sale of depot ferrous scrap - ubl/gsd/225/c&w/26/a [pl no. 98987343] condemned and un-serviceable c&w scrap consisting of c&w frames, bogie body frames, head stock module frames , tie bar square tube pipe steel girder cut pieces, bolster, brake beam, cross beam lhb, lhb bolster helical type , ls beam, boiler tube and other c& w similar items. available under the custody of dms c&r ward gsd/ubl. note: purchase to physically inspect the lot before bidding and cutting permitted by manual / gas. location: road no -02, gsd / ubl at bin no.-225.remarks-. delivery should start from one end. no pick and choose allowed.
Tender For corrigendum : supply, erection, testing and commissioning of boiler tube leakage detection system at unit-2 (600mw), rgtpp, khedar, hisar - supply, erection, testing and commissioning of boiler tube leakage detection system at unit-2 (600mw), rgtpp, khedar, hisar.
Tender For rectification of boiler tube leakages in unit 8 stage v as and when required for a period of 06 months from the date of commencement of the work.