Web Analytics Made Easy - StatCounter

Refrigerant Tenders

Get complete information related to latest Refrigerant Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Refrigerant Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Refrigerant Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government / Public Sector

CTN :45335071 Due date: 05 Jun, 202605 Jun, 2026 NA
Tender For supply of deep freezer 200 ltr, size- (lxwxh) 950mmx564mmx845mm , with eco friendly refrigerant, corrosion-resistantbody, heavy duty casters, hard top, manual defrost, no. of doors- 01 no., door mechanism- swing/hinge door, 01 no. of compartment, lock present-yes, inbuilt lighting, defrost water drain present, wattage (watts)-yes, power requirement- 230v/50hz/1ph, stabilizer free operation, 04 directional wheels type, number of basket/shelves wire type - 01 no., resessedhandle, stucco aluminium inner liner material suitable for military coaches. [ warranty period: 30 months after the date of delivery ] ]

Central Government/Public Sector

CTN :45335508 Due date: 02 Jun, 202602 Jun, 2026 NA
Tender For supply of refrigerant gas r 407c conforming to is : 15548/2005 , make : floron, srf, mafron. ecorane, refron,dupont.refrigeration gas r-407c comprising with 23% of r-32, 25% of r-125 & 52% of r-134a, suitable for acrmpu coaches refrigerant gas r 407c filled in company sealed refrigerant cylinder of 45 kg capacityeach, indicating cylinder weight, net weight of the refrigerant gas, gross weight and date of filling ofrefrigerant gas. the firm has to submit test certificate at the time of delivery. total 180kg in four cylinder 45 kg each empty cylinder will be taken from okha and filled cylinder will be returned to okha [ warranty period: 30 months after the date of delivery ] ]

Central Government/Public Sector

CTN :45335509 Due date: 02 Jun, 202602 Jun, 2026 NA
Tender For supply of refrigerant gas r-22 conforming to is: 5610/1993,reafirmed-2006 or latest total 90kg in two cylinder 45 kg each empty cylinder will be taken from okha and filled cylinder will be returned to okha. [ warranty period: 30 months after the date of delivery ] ]

CTN :45336402 Due date: 05 Jun, 202605 Jun, 2026 NA
Tender For supply of hermetically sealed scroll compressor for rmpu ac coaches, operating voltage 415 v ac, 3 phase, 50 hz suitable for r-22 refrigerant confirming to rdso specn. no. elps/spec/ac/03 (rev 2) may 2009 with amendment no. 1 & 2 . make & model number emerson zr 61 kc tfd 522 (scroll) or any other rdso approved make. suitable for rmpu coaches. [ warranty period: 30 months after thedate of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]

CTN :45337942 Due date: 05 Jun, 202605 Jun, 2026 NA
Tender For supply of r 22 refrigerant gas conforming to is:5610/1993(2nd. rev.) in non-returnable cylinder having the capacity of 61 kgs gas. make/brand: ecorane or equivalent. [ warranty period: 30 months after the date of delivery ] ]

Central Government/Public Sector

CTN :45302453 Due date: 02 Jun, 202602 Jun, 2026 NA
Tender For supply of 1211212003 gas f 22 referegeration gas , 1211212018 gas refrigeration 134 a , 1210910029 gas refrigerant r 404a , scale , eraser

CTN :45302868 Due date: 08 Jun, 202608 Jun, 2026 NA
Tender For supply of refrigerant r22

Central Government/Public Sector

CTN :45320881 Due date: 04 Jun, 202604 Jun, 2026 NA
Tender For supply of refrigerant gas (q3)

corporations/Associations/Others

CTN :45332321 Due date: 25 Jun, 202625 Jun, 2026 NA
Tender For providing of custom bid for services - refrigerant r-407c

Central Government/Public Sector

CTN :45332585 Due date: 25 Jun, 202625 Jun, 2026 2.24 Crore
Tender For supply of 14 hp air cooled outdoor condensing unit supply , 20 hp air cooled outdoor condensing unit supply , 24 hp air cooled outdoor condensing unit supply , 14 hp outdoor unit installation testing commissioning , 20 hp outdoor unit installation testing commissioning , 24 hp outdoor unit installation testing commissioning , 1.5 tr 4 way cassette indoor unit supply , 4 tr 4 way cassette indoor unit supply , 1.5 tr 4 way cassette indoor unit installation , 4 tr 4 way cassette indoor unit installation , 3 tr split dx cassette air conditioning system supply , 3 tr split dx ac system installation testing commissioning , centralized remote controller unit supply , centralized remote control unit installation testing commissioning , 25.4mm od copper refrigerant pipe supply , 22.2mm od copper refrigerant pipe supply , 19mm od copper refrigerant pipe supply , 15.86mm od copper refrigerant pipe supply , 12.7mm od copper refrigerant pipe supply , 9.5mm od copper refrigerant pipe supply , 25.4mm od copper pipe installation testing commissioning , 22.2mm od copper pipe installation testing commissioning , 19mm od copper pipe installation testing commissioning , 15.86mm od copper pipe installation testing commissioning , 12.7mm od copper pipe installation testing commissioning , 9.5mm od copper pipe installation testing commissioning , vrf refrigerant y and t joints with insulation supply , vrf refrigerant y and t joints installation testing commissioning , 3 core 2.5 sqmm cu shielded communication cable supply , 4 core 2.5 sqmm cu shielded communication cable supply , 2 core 1.5 sqmm cu shielded communication cable supply , 3 core 2.5 sqmm cu cable laying , 4 core 2.5 sqmm cu cable laying , 2 core 1.5 sqmm cu cable laying , pvc condensate drain pipe with insulation supply , pvc condensate drain pipe installation , ms table top stands for outdoor units supply , ms table top stands for outdoor units installation , refrigerant gas r410a supply and filling , 4 core 10 sqmm xlpe armoured copper cable supply , 4 core 16 sqmm xlpe armoured copper cable supply , 4 core 10 sqmm xlpe cable laying testing commissioning , 4 core 16 sqmm xlpe cable laying testing commissioning , aluminium anodized partition for ac enclosure , light point wiring in pvc casing and capping , 2x2 led luminaire 24w recess surface mounted supply , led panel 2x2 24w installation testing commissioning , 4c 50 sqmm xlpe armoured copper cable supply , gi wire 8 swg supply and delivery , armoured cable laying on wall for ac power db , 4c 50 sqmm cable end termination both ends , tpn distribution board 8 way hvac odu , fp isolator 125 amp sitc , fp mcb 63 amp sitc , fp mcb 40 amp sitc , sp and n distribution board 12 way hvac idu , dp mcb 32 amp sitc , sp mcb 6 or 10 amp sitc , sfu 100a tpn at main switch board sitc , chemical earth electrode earthing arrangement sitc , camc first year air conditioning system , camc second year air conditioning system , camc third year air conditioning system , camc fourth year air conditioning system , camc fifth year air conditioning system
 Loading, Please wait...

Connect us via What's Up