Get complete information related to latest Rescue Craft Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Rescue Craft Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Rescue Craft Tenders.
Tender For carrying, loading, transporting of pipelines to the mines different sites for water drain and flow of run off water, fitting of 2nd and 3rd turbine pump, lifting of old pontoons and old defective pump motors from the sump, lowering of domestic water pumps and lifting of damaged motors and pumps of domestic pumps during faults of jambad ocp
Tender For carrying, loading, transporting of pipelines to the mines different sites for water drain and flow of run off water, fitting of 2nd and 3rd turbine pump, lifting of old pontoons and old defective pump motors from the sump, lowering of domestic water
Tender For attending external painting of one no. 250 ton cap. pontoon, 02 nos. 100 ton capacity pontoons, 01 no. 100 ton cap. hopper barge and dredger frame of cswd, alhw, phoenix bay, sri vijaya puram (recall).
Tender For providing and fixing of bollards and accessories and painting of two nos. 100 ton capacity pontoons of cswd, alhw, sri vijaya puram (recall).
Tender For design, fabrication, transportation, supply, installation, testing and commissioning of steel pontoons along with floating walkways for providing floating jetties at ten (10) locations on nw 1 in the state of bihar
Tender For providing of custom bid for services - dismantling of old pump, pontoons and installation of repaired pumps pontoons with on be alignment at ballarpur open cast mine under ballarpur sub area
Tender For shifting/withdrawal of old pontoons and other equipment related to pumping in mines for overhauling, repairing and reinstallation at pumping locations for aperiod of 120 days under s.b. project.
Tender For shifting/withdrawal of old pontoons and other equipment related to pumping in mines for overhauling, repairing and reinstallation at pumping locations for a period of 120 days under s.b. project.