Get complete information related to latest Resistance Furnace Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Resistance Furnace Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Resistance Furnace Tenders.
Tender For supply, erection and commissioning of 1 mt capacity forging electric high temperature furnace (box type) for producing titanium, inconel and special steel forgings as per annexure i attached.
Tender For corrigendum : supply and drained bed material/clinker handling in boilers. - loading of seived bed material in boiler from operating floor, spreading and leveling as per the direction of eic. the contractor has to arrange man power, if required during odd hours & sundays/ holidays, if required on emergency. frequency: as and when required., transportation of seived bed material , available in polythene bags, from ground floor to operating floor and coal scale area of boiler house and stacking it as per the direction of eic. frequency: as & when required., transportation of drained bed material, when boiler is in operation and drained clinker from boiler area to designated sieving area as per direction of eic. frequency: as and when required., collecting the bed material in polythene bags from areas wherever necessary for inspection of bed coils, wall tubes or for any other maintenance purpose and keeping the bed material either inside or outside of boiler bed, as per the direction of the eic. frequency: as and when required., removal of clinker from boiler 1 bed, using suitable methods without causing any damage to the bed coils/side wall tubes and transporting the removed clinker from the boiler to a specified area within 30 meters from ground floor of boiler house. after removal of clinkers, entire bed material and cleaning of nozzle distribution plates , all fluidization nozzles needs to be flushed out with compressed air and all nozzles needs to be pinned. frequency: as & when required., removal of clinker and bed material inside furnace (cross section 6.5m*6m) by engaging suitable manpower. location of clinker and bed material is between bed coils and fluidization nozzles. manpower engaged has to lie down between fluidization nozzles and bed coils and manually pass on clinker pieces to manholes available to be taken out. bed material can be drained through bed drains. since job to be executed is in constrained area, manpower engaged has to be physically fit. after removal of clinkers, entire bed material and cleaning of nozzle distribution plates, all fluidization nozzles of 4 compartments/ wind box needs to be flushed out with compressed air and all nozzles need to be pinned (pb# 2). frequency : as and when required.
Tender For corrigendum : supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bot
Tender For fabrication, assembling and performance testing of high precision mechanism mechanical components of wire wrapping machine, de-molding machine and sodium bonding furnace inside the glove box at l-13 lab and l-16 lab.
Tender For fabrication, assembling and performance testing of high precision mechanism mechanical components of wire wrapping machine, de-molding machine and sodium bonding furnace inside the glove box at l-13 lab and l-16 lab