Get complete information related to latest Resister Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Resister Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Resister Tenders.
Tender For supply of packing plate, 8mm on bogie frame for crown clearance as per drg no.t-0-1-644 alt a. material specification to irsm 41-97. [ warranty period: 30 months after the date of delivery ]
Tender For supply of side frame key (for cartridge roller bearing) for narrow and wide jaw for casnub bogie as per rdso sk.-69594, alt.no.38, item no.6. material and specification as per drawing. [ warranty period: 30 months after the date of delivery ]
Tender For supply of bogie frame assembly for 140 kn air spring type fiat bogie as per drg.no-lw03001 alt-d, s pec. mdts 213 rev-04, or latest, packing instruction-pi042 ver-01, [ warranty period: 30 months after th e date of delivery ]
Tender For supply of bogie frame assly. for air spring lhb coaches-(qr code as per cde/rcf letter n o. md44121 dt. 24.11.2021.), as per drawing: lw03002 alt.'j' & mdts 213 rev.04.the new painting scheme is to be followed as per dy.cme/design (s&b) letter no. md44121 dtd. 08.01.2024. [ warran ty period: 84 months after the date of delivery ]
Tender For supply of b- check kit of demu, consisting of 04 items (1) element crn resister, cil pt. no.40723 52, qty=02 no. (2) corrosion inhibitor (10 ltrs.) cil pt. no. 3167218 qty.=01 no. (3) strip test kit , cil pt. no. 4912590, qty.=01 no. (4) corrosion inhibitor (5ltrs.) cil pt. no. 3167217, qty.=01 no. [ warra nty period: 30 months after the date of delivery ]
Tender For supply of side frame friction liner. drawing no. :- sk-69594, alt. 38, item no. 7 spec. no:- wd-2 1-casnub-22 nlb bogie- 93, rev. 2 with amend. 6. [ warranty period: 30 months after the date of del ivery ]
Tender For supply of earthing cable complete for lhb coaches (coach body to fiat bogie frame) to rcf drawi ng no. lw71249 alt c confirming for rcf specification no. edts-101 rev-c am-3 corr-9 [ warranty p eriod: 30 months after the date of delivery ]
Tender For supply of suspension strap on bogie frame, icf's drg. no. wtac3-0-3-317,item no.-1 (one) ,alt. no . b [ warranty period: 30 months after the date of delivery ]
Tender For supply of head stock complete for bogie frame to drg.no. emu/m/0-3-004 col.i, alt j. th e firm shall full fill the requirements as per icf/md/specn.147, rev-02 with amendment no .01. [ warranty period: 30 months after the date of delivery ]