Get complete information related to latest Rising Main Laying Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Rising Main Laying Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Rising Main Laying Tenders.
Tender For construction of sump well with pumping machinery and providing and laying of 450mm dia rcc np3 for storm water pipe line from culvert under delhi mathura highway to sump well and provision of 300mm dia risingmain from sump well to exist (recall)
Tender For annual maintenance estimate for swd in sector 33p hisar (2025-2026). `providing and laying of 400mm dia rcc np-3 storm water drainage pipe near plot no. 361 sector 33-p, hisar and all other works contingent thereto` a/c rs. 199459/-
Tender For work of providing and laying 300mm rcc and 230mm dia sw pipe line and 250mm dia dwc linking to nearby disposal to avoid sewage entry to open storm water drain at 1st main road near ganesha temple and pragathi co-opperative bank ltd. and surrounding areas coming under malleshwaram service station of aeene-1 sub division
Tender For work of providing and laying 400mm rcc and 230mm dia sw pipe line linking to nearby disposal to avoid sewage entry to open storm water drain at 4th main ad block, 1st cross srirampura, nagappa block and surrounding areas coming under srirampura service station of aeene-1 sub division
Tender For supply of di specials for the work design construction of gslr (4900 cum) at nandakumar block gslr (3800 cum ) at chandipur block including high lift pump house, chlorine room, store room, sub station building, administrative building, guard - < supply of di specials for the work "design & construction of gslr (4900 cum) at nandakumar block & gslr (3800 cum ) at chandipur block including high lift pump house, chlorine room, store room, sub station building, administrative building, guard room, staff quarter and other allied structures and construction of zonal overhead reservior (27 nos) including soil investigation of different capacity along with cw risingmain ,laying of distribution pipeline and fhtc (51946 nos) including sinking of big dia tube wells and its connections and other allied works as per direction of eic including 1 years operation and maintenance after successful trail run(180 days) for surface water based water supply scheme for nandakumar block and chandipur block under tamluk division phe dte.>