Get complete information related to latest Road Divider Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Road Divider Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Road Divider Repair Tenders.
Tender For corrigendum : providing of custom bid for services - proposal for renewal of contract for outsourcing the work of "mechanized coach cleaning & watering(mcc) of pm/sm trains, pftr trains including watering, maintenance of pitlines and related area, watering of nomiantedpass through trains, intensi
Tender For bengaluru - sampige road sec : supply of ballast at nittur (ntr) depot (quantity = 80,175 cum), including leading and loading in connection with the work of (a) complete track renewal (p) of existing 52kg rails on 60kg psc of 1540 nos/km with 60kg/90 uts rails and 60 kg wider base sleeper of 1660/km for a length of 17.15 km from 17/650-10/500 and 39/000-49/000 dn line in aden/ypr section, (b) complete track renewal (p) of existing 52kg rails on 60kg psc of 1540 nos/km with 60kg/90 uts rails and 60kg wider base sleeper of 1660/km for a length of 21.35km from 17/650 - 39/000 up line in aden/ypr section, (c) complete track renewal (p) of existing 52kg rails on 60kg psc of 1540 nos/km with 60kg/90 uts rails and 60kg wider base sleeper of 1660/km for a length of 19.4 tkm from km 49/000-68/400 dn line in aden/ypr section.
Tender For sw i : bengaluru - dharmavaram section : complete track renewal (p) of existing 60kg psc of 1660 nos/km with 60kg/90 uts r-260 rails and 60kg wider base sleeper of 1660/km for a length of 5.5 tkm from km 130/000-135/500 (dn) in sse/pway/penukonda section. sw ii : bengaluru - dharmavarm section : through fittings renewal - 42.3 kms from km 101/200-130/000 and 135/500-136/700 (dn line) and km 136/700-149/000 (sl) in sse/pway/pkd section. sw iii : bengaluru - dharmavaram section : earthwork in connection with the work of complete track renewal (p) of existing 60kg rails on 60kg psc of 1660 nos/km with 60kg/90 uts r-260 rails and 60kg wider base sleeper of 1660/km for a length of 5.5 tkm from 130/000-135/500 (dn) in sse/pway/penukonda section. maintenance period for sw-iii is 6 months or one monsoon period whichever is later. (composite work)