Tender For supply of set of spares required for m/s. abro dynamic balancing machine, model kh-30, sl no: w-2505. set consisting of 03 items as follows.1) roller(dia: 83mm) assembly(01 set = 04 nos.). qty/set. = 01 set.2) rubber belt type gr-1- 2670 x 30. qty/set. = 01 no.3) nylon belt type tt04 - 2670 x 30. qty/set. = 01 no.
Tender For providing of custom bid for services - requisitioning the service of engineer or expert of ms andritz hydro (ah) for vibration analysis and dynamic balancing of hydro generator (unit no 5) at bhakra left bank power house as per scope of work
Tender For repair works of stator, rotor dynamic balancing and testing of 11kv, 2500kw, 1494rpm, bhel make pafan motor sl.no.5192a421-51-02 of emmrt/ic-2, stage-iv, dr.nttps
Tender For corrigendum : tender for supply of motor rewinding - rewinding of three phase , 415 v , 50hz motors upto 1.1kw as per annexure-1 , rewinding of three phase , 415 v , 50hz motors more than 1.1 kw to 2.2 kw.as per annexure-1 , rewinding of three phase , 415 v , 50hz motors more than 2.2 kw upto 5.5 kw.as per annexure-1 , rewinding of three phase , 415 v , 50hz motors more than 5.5 kw upto 11 kw.as per annexure-1 , rewinding of three phase , 415 v , 50hz motors more than 11kw upto 22kw.as per annexure-1 , rewinding of three phase , 415 v , 50hz motors more than 22kw upto 55kw as per annexure-1 , rewinding of three phase , 415 v , 50hz motors more than 55kw upto 75kw as per annexure-1 , rewinding of three phase , 415 v , 50hz motors more than 75kw upto 90kw as per annexure-1 , rewinding of three phase , 415 v , 50hz motors more than 90kw upto 110kw as per annexure-1 , rewinding of three phase , 415 v , 50hz motors more than 110kw upto 132kw as per annexure-1 , rewinding of single phase , 230 v , 50hz motors exhaust fan/pedestal fan/ wall mounted fan upto 400mm sweep as per annexure-1 , rewinding of single phase , 230 v , 50hz motors ceiling fan/ exhaust fan/cooler fan/ wall mounted fan above 400mm sweep as per annexure-1 , rewinding of single phase motors upto 1.1 kw.as per annexure-1 , rewinding of single phase control transformer upto 500 va as per annexure-1 , dynamic balancing of rotor with 2.5 microns accuracy (balancing grade is gr 2.5 as per iso 1940) more than 1 kg upto 4 kg as per annexure-1 , dynamic balancing of rotor with 2.5 microns accuracy (balancing grade is gr 2.5 as per iso 1940) more than 4 kg upto 16 kg as per annexure-1 , dynamic balancing of rotor with 2.5 microns accuracy (balancing grade is gr 2.5 as per iso 1940) more than 16 kg upto 48 kg as per annexure-1 , dynamic balancing of rotor with 2.5 microns accuracy (balancing grade is gr 2.5 as per iso 1940) more than 48 kg upto 96 kg as per annexure-1 , dynamic balancing of rotor with 2.5 microns accuracy (balancing grade is gr 2.5 as per iso 1940) more than 96 kg upto 192 kg as per annexure-1 , dynamic balancing of rotor with 2.5 microns accuracy (balancing grade is gr 2.5 as per iso 1940) more than 192 kg upto 378 kg as per annexure-1 , dynamic balancing of rotor with 2.5 microns accuracy (balancing grade is gr 2.5 as per iso 1940) more than 378 kg upto 500 kg as per annexure-1 , dynamic balancing of rotor with 2.5 microns accuracy (balancing grade is gr 2.5 as per iso 1940) more than 500 kg upto 1000 kg as per annexure-1 , dynamic balancing of rotor with 2.5 microns accuracy (balancing grade is gr 2.5 as per iso 1940) more than 1000 kg upto 1500 kg as per annexure-1 , dynamic balancing of rotor with 2.5 microns accuracy (balancing grade is gr 2.5 as per iso 1940) more than 1500 kg upto 3000 kg as per annexure-1 , remetalizing of shaft using tafa arc technique after preparation of surface and machining to proper size upto 1.5 kw as per annexure-1 , remetalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 1.5 kw upto 7.5 kw as per annexure-1 , remetalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 7.5 kw upto 15 kw as per annexure-1 , remetalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 15 kw upto 45 kw as per annexure-1 , remetalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 45 kw upto 90 kw as per annexure-1 , remetalizing of shaft using tafa arc technique after preparation of surface and machining to proper size more than 90 kw upto 170 kw as per annexure-1 , remetalizing of end covers using tafa arc technique after preparation of surface and machining to proper size upto 1.5 kw as per annexure-1 , remetalizing of end covers using tafa arc technique after preparation of surface and machining to proper size more than 1.
Tender For annual work contract for the work of condition monitoring and vibration analysis and dynamic balancing of id/fd/pa fans installed at 2x600 mw kapp, rvunl, jhalawar