Tender For corrigendum : supply of body seat for following valve , seat solid musical note type for following valve , shaft o ring for following valve , o-ring holder top for following valve , thrust pad for following valve , gasket for following valve , bottom cover for following valve , body seal for following valve , soc hd cap screw for following valve , heu lock nut for following valve , body seat o ring for following valve , body o ring for following valve , bottom shaft for following valve , top shaft for following valve , o ring holder top for following valve , top shaft retainer bush for following valve , seat clamping ring for following valve , hex nut for following valve , internal fastener for following valve , external fasteners for following valve , worm gear for following valve , dowel pin for following valve , top shaft retainer for following valve , o ring id for following valve , o ring od for following valve , spacer top and bottom for following valve , bearing holder for following valve , body seato ring for following valve , complete valve set along with actuator
Tender For supply of spare parts of vehicle f f - knuckle bearing for maruti gypsy , front wheel bearing for maruti gypsy , frunt hub seal for maruti gypsy , front axle tube inner seal for maruti gypsy , rear wheel bearing with cone for maruti gypsy , rear hub seal for maruti gypsy , rear brake shoe assy for maruti gypsy , front calliper assy for maruti gypsy , clutch plate for maruti gypsy , clutch cable for maruti gypsy , clutch release bearing for maruti gypsy , pilot bearing for maruti gypsy , steering gear box kit for maruti gypsy , fan belt for maruti gypsy , spark plug for maruti gypsy , ignition coil for maruti gypsy , fuel pump electric for maruti gypsy , reverse light switch for maruti gypsy , horn relay for maruti gypsy , flasher unit 12v for maruti gypsy , ignition switch for maruti gypsy , front convoy light for maruti gypsy , toggle switch for maruti gypsy , battery terminal for maruti gypsy , wiper motor for tata sumo , wiper blade for tata sumo , fuel filter cartridge for lbpv , calliper pad for lbpv , head light bulb 12v 100w for lbpv , wiper blade for lbpv , fuel filter cartridge for scorpio , fan belt for scorpio , wiper blade for scorpio , calliper pad for scorpio , fuel filter cartridge for tata safari , head light bulb for tata safari , fog light bulb for tata safari , wiper blade for tata safari , clutch master cyl assy for tata 2.5 ton , clutch mst cyl rep kit for tata 2.5 ton , slave cyl assy for tata 2.5 ton , slave cyl rep kit for tata 2.5 ton , gear lever rep kit for tata 2.5 ton , gear box top rep kit for tata 2.5 ton , gear box oil seal for tata 2.5 ton , gear box seal for tata 2.5 ton , front wheel knuckle bush for tata 2.5 ton , front wheel knuckle brg for tata 2.5 ton , front knuckle thrust washer for tata 2.5 ton , front wheel bearing inner for tata 2.5 ton , front wheel bearing outer for tata 2.5 ton , rear wheel bearing inner for tata 2.5 ton , rear wheel bearing outer for tata 2.5 ton , u bolt for tata 2.5 ton , rod spring leaf for tata 2.5 ton , exhaust brake solenoid for tata 2.5 ton , clutch pipe for tata 2.5 ton , tie rod assy for tata 2.5 ton , fuel filter bowl for tata 2.5 ton , front drive shaft axle rh for marksman , fuel pipe for marksman , vaum modulator for marksman , ball joint with end kit for marksman , ball joint for marksman , front shock absorber for marksman //bid details 2 / 42
Tender For unit ith 162 main gear spare parts & repairing --, main gear shaft broken speed gear kirra pull out by hydraulic press machine and new speed gear kirra fitting by hydraulic press machine., , main gear shifting rod deposition material and size making as per size., , main gear top cover brass welding turning facing lever cutting and welding as per size., , pressure plate grinding, machining by lath tool for surface smooth and matching with clutch plate., , pressure plate damage finger and spring remove and new finger, spring set replacement and setting as required., , gear main shaft bearing size deposition hard material and size making as per bearing size., , gear main shaft mouth thread deposition hard material and size making as per chuck nut thread size., , main gear top bearing, , m/g main shaft, , m/g top shaft lock washer set, , m/g top shaft needle bearing, , m/g kangan bearing, , m/g rollar set, , m/g synchoronizing sleeve, , m/g synchoronizing ring brass, , m/g shifter sleeve, , m/g flower kit, , main gear 1st speed gear, , main gear 3rd speed gear, , main gear 4th speed gear, , gear box housing nut and bolt h/t, , gear box foundation pad, , main gear oil seal, , clutch plate, , main gear top shaft, , pressure plate finger and spring repair kit, , thrust washer, , chuck nut with quarter pin, , main gear box packing, , anabond tube, , gear box housing nut and bolt h/t, , gear box foundation pad, , gear box foundation pad nut and washer, , gear box oil seal
Tender For repairing of all gear box and its accessories at wazirabad barrage. - dismantling of gearbox by removing both end couplings and extracting the complete shaft assembly from the barrage gates. this includes removal of thrust and steel blocks using skilled labour and specialized lifting equipment. the gearbox top cover (top half) shall be removed, followed by detachment of the bottom half from the main gearbox body. all internal components parts gear, changer gear assembly, bearing, limit shift assembly and shaft shall be carefully removed in sequence, ensuring proper identification and documentation of their orientation and order for accurate reassembly., dismantling of drumbox assembly by removing both end couplings and extracting the complete shaft,bear and gear assembly from the drum box .. all internal components parts gear, changer gear assembly, bearing, limit shift assembly and shaft shall be carefully removed in sequence, ensuring proper identification and documentation of their orientation and order for accurate reassembly., thorough cleaning of all components to remove debris, contaminants, and residual lubricants using appropriate cleaning agents and methods. detailed inspection of each component to assess condition, identify wear, damage, or corrosion, and document findings for further repair or replacement as required., repair of limit switch assembly of gear box including the complete overhauling /oiling and greasing including replacement of parts as per sample ., replacement of normally open (no) switch and contactor with a relay, along with the complete installation of electrical components for the gear box in the hoisting mechanism of the barrage system, replacement of brake pad as per sample along with complete fitting and integration in the gearbox assembly, replacement of brake coil as per sample along with complete fitting and integration in the gearbox assembly, replacement of bearing no 6315/c4 djb approved makes, replacement of bearing no 6312m/c3 djb approved makes, replacement bearing no 6308 2rs1 djb approved makes, replacement bearing no 6310 2rs1 djb approved makes, complete assembly of the gearbox, including packing, greasing, and installation of both end shafts with cast iron (c.i.) couplings and bolts. ensure proper alignment and secure fastening to maintain efficient power transmission and operational reliability, complete overhauling and lubrication of all moving and critical components of the drum box assembly of the gearbox, using appropriate tools such as grease guns and nipples. the work shall be carried out by skilled labor as per site requirements. ensure proper lubrication with the specified grade and viscosity of grease to maintain optimal performance and prevent wear and tear of mechanical parts including internal parts of painting, the work involves achieving precise/making alignment of the shaft connecting the drum box and gear box in the hoisting mechanism of the barrage. proper alignment is critical to prevent deviation from the guide grooves during operation particularly during lifting and to ensure long-term stability and accuracy of sluice gate movement.the job includes dismantling the existing shaft (which transmits motion between the drum box and gear box), carrying out realignment, and reinstalling the shaft with high precision. to restore the system to optimal operating condition, the work shall also involve the replacement of associated hardware components as required such as bearings, couplings, keys, and fasteners.this intervention is essential for the reliable and efficient functioning of the sluice gate lifting system and to prevent operational issues during gate actuation., after cleaning and overhauling the gear and shaft of the gearbox, refit and them in their original positions with making alignment with all movement parts of gear box and ensure that they are functioning properly., conduct load testing of 3under sluice and 3weir side gates and weir side gates during