Get complete information related to latest Roller Chain Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Roller Chain Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Roller Chain Tenders.
Tender For supply of 02 legs chain sling for eot crane capacity 20 ton with one end o ring and other end j hoo k. length of each chain 4.5 meter with load test certificate offered desc:-1. top ring dia will be 50mm x id 250mm 2.capacity 20 tons at 0 degree angle / 14.0 tons at 90 degree angle and proof load 40 tons. 3. bottom eye hooks not j hooks 4. length 4.5 meter (excluding top ring and bottom eye hooks) [ warranty period: 30 months after the date of delivery ]
Tender For supply of ratchet lever hoist (pull lift) capacity 1.6 tonne complete with rollerchain an d hook with safety latches (with latest is) rdso approved and confirming to rdso speci no. ti/ spc/ohe/tool pl/ 1991 rev-1 or latest (core approval vender only) core item id: 4200055 [ warranty period: 30 months after the date of delivery ]
Tender For supply of 12 mm dia alloy steel gr-80 four legged chain sling with main bull ring of 36 mm dia x 160 mm id eye ring of 28 mm dia x 100 mm id and eye hook at free ends effective length 03 meters, swl 10 t ones at 0-90 degree. hook opening j-75 mm with proof load test certification of oem. [ warranty period: 30 months after the date of delivery ]
Tender For competitive e-bidding for supply of lifting material for bisalpur kisan sahkari chini mills ., ltd., bisalpur ( pilibhit ) for the season 2025-26 - heading, usha martin make steel wire rope hemp core tested quality having tensile strength of 180kg.n/mm squ. confirming to is-2266/89 ,with test certificate.(6/19 material construction) -size-3/4 , but -size-3/8 , shalimar make manila rope mufd.to is/bs specification with test certificate .size 3/4", shalimar make manila rope mufd.to is/bs specification with test certificate .size 1", heavy duty poly propylene rope 3stand hawser laid, tuff make, tested quality, with test certificate. size 1 / 3/4 , heavy duty nylon rope 3stand hawser laid, tuff make, tested quality, with test certificate. size 1 , usha martin make wire rope sling as per above spec. with both end sealed looped in o shape 12 length for 15 tone load crane hook grip. with test certificate size 3/8 x 4 met., but size 1/2 x 02 met., but size 1/2 x 04 met., but size 5/8 x 03 met., but size 3/4 x 11 met., but size 1.1/2 x 04 met., u clamp forged steel for 1/2 rope., but for 3/4 rope., indef make chain pulley block with 15 met. tested lift chain capacity. with test certificate. capacity --01 tone. heavy duty-p series, but 02 tone with 15 met. tested lift chain heavy duty. p series with test certificate., but 03 tone with 20 met. tested lift chain heavy duty. p series with test certificate., but 05 tone with 20 met. tested lift chain heavy duty. p series with test certificate., indef make extra tested lift chain for above chain pulley block. heavy duty-p series
Tender For supply of 28 mm alloy steel grade 80 double chain sling with oblong link (56mm dia x 400mm i/l x 25 0mm i/w) at the top and eye hook at each bottom, sling jointed with indlocks. effective length 8.0 meters, safe working load 35 mt, 90% b0 angle as per drawing ic/h2-ibe/80/28-8.00 m, drawing enclosed. make: felix / spec / rail tech / usha martin or similar for the maintenance of 140te bd crane. note equivalent m ake supplier should produce their past performance certificate. [ warranty period: 30 months after the da te of delivery ]
Tender For corrigendum : various routine/preventive and breakdown maintenance work on as and when require basis at chp-gtps - replacement of hammer rings for stage ii crusher , replacement of hammer rings for stage i crusher , replacement of screen plate / breaker plate/kick off plate of stage i and ii crushers , replacement of rotor of stage i crusher with disassembling of removed rotor and assembling of new/repaired rotor , replacement of drive end side bearing / pedestal of crusher rotor or complete gear coupling set of crusher or repositioning of dislocated rotor of crusher , replacement of non drive end side bearing/pedestal of crusher rotor or complete alignment of crusher motor with crusher rotor , replacement of broken hammer rings of stage i and ii crushers (stage i crusher up to 12 nos.of hammer rings and stage ii crusher up to 06 nos. of hammer rings at a time) , replacement of rail of rail table of wagon tipplers 1/2/3/4 (in one side full length) , replacement of clamping rubber pads of clamp for wagon of wagon tipplers , replacement of whole resting pads for wagon of side beam of wagon tipplers , replacement of spill plate roller of wagon tipplers , repairing/preparation/ fitting and replacement of hooks/rods/turn buckle, chain, sling rope ,spring assembly etc. of vibrating trays and crusher house trays , spillage control at various locations , miscellaneous cutting/welding work require at various locations , replacement of gearbox in conveyor no. 2a/b,11a/b,12a/b,13,14/15,16a/b,17a/b ,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of gearbox in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement of slow speed coupling set (two halves) of drive pulley , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.2a/b,11a/b,12a/b,13,14/15,16a/b,17 a/b,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement/removing/refitting of various size and type of fluid coupling , replacement or removing & refitting of any internal/bearing/input/ output oil seal of various size and type of gear box , overhauling of dismantles old/used gearbox in all respect with fitment of input and output coupling. , replacement of drive pulley , replacement of drive end side bearing of drive pulley or repositioning of dislocated drive pulley , replacement of non drive end side bearing/any side pedestal of conveyor drive/non drive pulley , alignment of motor/ gearbox/drive pulley including decouple/couple of coupling , nut bolt and drive system checking with replacement of broken nut bolt in all 04 wagon tipplers no.1/2/3/4 as per scope , lifting and releasing of gravity take up of any conveyor belt for locking and de locking of belts for other than belt replacement work , loosening and tightening of horizontal type screw take assembly of any conveyor belts for other than belt replacement work , work of dismantling and re erection of new/repaired apron pan from existing apron feeder of wagon tippler , repairing of upper/lower structure/cone plates of damaged/bend apron pan , replacement of carrying roller of apron feeder , replacement of worn out/ damaged ti roller and garland rollers. , replacement of worn out/ damaged impact rollers , replacement of worn out/ damaged return rollers , replacement of various worn out/ damaged ti roller stands , replacement of various worn out/ damaged impact roller stands , replacements of various worn out/ damaged return roller stands , replacement of various worn out skirt rubbers [10 m each] and skirt rubber with angle , preparation and replacement of guide rollers with bracket in place of worn out/ damaged gu