Web Analytics Made Easy - StatCounter

Roller Screen Tenders

Get complete information related to latest Roller Screen Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Roller Screen Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Roller Screen Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :40978783 Due date: 08 Jul, 202508 Jul, 2025 NA
Tender For supply of motherboard gigabite h510 , printer head , waste pad , pressure roller , screen for hp all in one pc , bty 12v, 7ah , power supply card

State Government

CTN :40703546 Due date: 18 Jul, 202518 Jul, 2025 10.74 Lacs
Tender For corrigendum : providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - power plant; roller screen & wobbler; service provider

CTN :40845184 Due date: 17 Jul, 202517 Jul, 2025 NA
Tender For supply of elecon make roller screen spares(cs roll body) for coal handling plant

CTN :40900384 Due date: 17 Jul, 202517 Jul, 2025 10.78 Lacs
Tender For shifting of 33kv poonch ii line at seri chowana from densily populated area - sitc of 33kv line, 11 mtr. long pole (st-410 sp56), x-arms of ms channel iron 10 ft. long (100x75x6)mm, x-arms of ms channel iron 8 ft. long (100x75x6)mm, acsr dog conductor, galvanized nuts and bolts, 11kv polymeric composite disc insulator 12kv,min failing load 45kn, lighting impulse 75kv positive and 80kv negative, creepage distance 320mm, 33kv polymeric composite pin insulator 36kv, 10kn, lighting impulse 170kv positive and 180kv negative, creepage distance 900mm, m/s angle iron braces 10 (65x65x6)mm, m/s angle iron braces 6 (65x65x6)mm, galvanised stay set with 50 x 8 mm stay clamp, guyinsulator(2nos.), anchor plate (300x 300 x 8 mm), nut-bolts, 2 nos turn-buckles, 1.8m long, 20 mm diameter solid gs stay rod & 7/4.00 mm dia gi stranded wire complete, guard netting with 10 ft. long (75x75x6) angle iron, cross clamps of different sizes, aluminium paint, earthing complete by gi pipe 40 mm or gi rod20mm 2.5 mtr long through gi strip., cement bottoming 1:2:4 mix as per rec standards.6cum/pole, danger plate, anticlimbing clamps, gi wire

CTN :40889150 Due date: 12 Jul, 202512 Jul, 2025 NA
Tender For procurement of bearings for roller screen

corporations/Associations/Others

CTN :40832276 Due date: 08 Jul, 202508 Jul, 2025 NA
Tender For nctps i se mii circle echs dn reconditioning of worn out roller screen shaft released from eds 2b equipment at sch ii

State Government

CTN :40227801 Due date: 08 Jul, 202508 Jul, 2025 49.58 Lacs
Tender For corrigendum : various routine/preventive and breakdown maintenance work on as and when require basis at chp-gtps - replacement of hammer rings for stage ii crusher , replacement of hammer rings for stage i crusher , replacement of screen plate / breaker plate/kick off plate of stage i and ii crushers , replacement of rotor of stage i crusher with disassembling of removed rotor and assembling of new/repaired rotor , replacement of drive end side bearing / pedestal of crusher rotor or complete gear coupling set of crusher or repositioning of dislocated rotor of crusher , replacement of non drive end side bearing/pedestal of crusher rotor or complete alignment of crusher motor with crusher rotor , replacement of broken hammer rings of stage i and ii crushers (stage i crusher up to 12 nos.of hammer rings and stage ii crusher up to 06 nos. of hammer rings at a time) , replacement of rail of rail table of wagon tipplers 1/2/3/4 (in one side full length) , replacement of clamping rubber pads of clamp for wagon of wagon tipplers , replacement of whole resting pads for wagon of side beam of wagon tipplers , replacement of spill plate roller of wagon tipplers , repairing/preparation/ fitting and replacement of hooks/rods/turn buckle, chain, sling rope ,spring assembly etc. of vibrating trays and crusher house trays , spillage control at various locations , miscellaneous cutting/welding work require at various locations , replacement of gearbox in conveyor no. 2a/b,11a/b,12a/b,13,14/15,16a/b,17a/b ,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of gearbox in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement of slow speed coupling set (two halves) of drive pulley , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.2a/b,11a/b,12a/b,13,14/15,16a/b,17 a/b,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement/removing/refitting of various size and type of fluid coupling , replacement or removing & refitting of any internal/bearing/input/ output oil seal of various size and type of gear box , overhauling of dismantles old/used gearbox in all respect with fitment of input and output coupling. , replacement of drive pulley , replacement of drive end side bearing of drive pulley or repositioning of dislocated drive pulley , replacement of non drive end side bearing/any side pedestal of conveyor drive/non drive pulley , alignment of motor/ gearbox/drive pulley including decouple/couple of coupling , nut bolt and drive system checking with replacement of broken nut bolt in all 04 wagon tipplers no.1/2/3/4 as per scope , lifting and releasing of gravity take up of any conveyor belt for locking and de locking of belts for other than belt replacement work , loosening and tightening of horizontal type screw take assembly of any conveyor belts for other than belt replacement work , work of dismantling and re erection of new/repaired apron pan from existing apron feeder of wagon tippler , repairing of upper/lower structure/cone plates of damaged/bend apron pan , replacement of carrying roller of apron feeder , replacement of worn out/ damaged ti roller and garland rollers. , replacement of worn out/ damaged impact rollers , replacement of worn out/ damaged return rollers , replacement of various worn out/ damaged ti roller stands , replacement of various worn out/ damaged impact roller stands , replacements of various worn out/ damaged return roller stands , replacement of various worn out skirt rubbers [10 m each] and skirt rubber with angle , preparation and replacement of guide rollers with bracket in place of worn out/ damaged gu
 Loading, Please wait...

Connect us via What's Up