Tender For purchase of carb clad coated seat and disc for 12x10 inch diffuser type ash intake valve installed in nuva feeder and ash intake valve 12x6 inch and carb clad coated gate plate for branch segregation valve in fly evacuation system stps, sarni.
Tender For construction of 400kv substation sabalgarh, 33220kv pooling substations at pss-1 pss-2 and associated transmission facilities on turnkey basis for evacuation of power from morena phase-1 solar park and intra-state system strengthening
Tender For request for proposal document for selection of bidder as transmission service provider through tariff based competitive bidding process to establish intra-state transmission system for evacuation scheme for 2000mw solar park at ryapte village, tumkur district is issued by rec power development and consultancy limited
Tender For supply, laying, testing and commissioing of ht (11kv) cables for the power evacuation of 7.5mwp grid connected solar pv power system located at nayathode site, to the 110kv substation of cial, including documentation and liaisoning for approvals from statutory bodies
Tender For corrigendum : providing of hiring of consultants - milestone/deliverable based - appointment of independent engineer for transmission system for evacuation of power from potential renewable energy zone in khavda area of gujarat under phase-iv 7 gw part a; energy (oil, gas, pow..
Tender For mtps-ii (1x600mw) - es circle -tgm&ca division - attending to general cleaning and daily maintenance work including minor repairing work of hip casing, lp-a & lp-b casings, bearing lube oil system, control oil system and its external purifier, jack oil system, boiler feed pumps & booster pumps, steam driven boiler feed pumps, booster pumps, bfp a&b lube oil system, hp/lp bypass system and its external purifier, hp&lp condenser, condensate extraction pumps a, b & c, and air evacuation system including vacuum pumps a & b , condenser on line tube cleaning system, centrifuges for lube oil and centralized lube oil system and miscellaneous pumps for the period of 365 days from the date of taking over of the site.