Get complete information related to latest Roofing Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Roofing Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Roofing Repair Tenders.
Tender For upgradation of rooms at ground floor 3rd floor and 4th floor under pccit office aaykar bhawan - masonary work , wood and pvc work , flooring work , roofing , repairs to building , painting , wallpaper , vertical blinds , dismantaling and demolishing
Tender For upgradation of rooms misc work in 201 and creche at aaykar bhawan kanpur - construction of creche , misc works in room no 201 , wood and pvc work , flooring work , roofing , repairs to building , painting , upvc windows work , wall paper , vertical blinds , dismantaling and demolishing , electrical work
Tender For under district sultanpur, roofingrepair of meeting hall, generator room and kitchen etc. and painting and painting of walls and tile work, lot no 13
Tender For corrigendum : set of final roof element for ac 3 tier amrit bharat 3.0 with flat roof coaches, as per drawing: mp26freab3tf version 0, packing instruction: 1. the supplier shall pack the final roof element in a suitably designed returnable fixture in such a way thatfinal roof element shall not get scratched, damaged, twisted during transportation, storage and lifting and to avoid scratches on outer surface. it should be wrapped with enviroment friendly material and it should have standard clamping /fastening mechanism so that it can be opened easily. it should have firm's identification mark. 2. first returanable fixture along with final roof element be retained by rcf & this fixture shall be exchanged in the second lot supply and so on. at the end of the contact, the firm shall collect the remaining returnable packing fixture from rcf. 3. the packing fixture/frame to be fabricated having sufficient strenght to bear approximate 1 tonne load in static & moving condition of five coach set of final roof element. 4. the fixture /frame/pallet should be designed so that the packed final roof element preferably remain in horizontal position to minimize surface area. 5. it should also be suitable for storage of final roof element under open sky. [ warranty period: 30 months after the date of delivery ]
Tender For set of final roof element for ac 3 tier amrit bharat 3.0 with flat roof coaches, as per drawing: mp26freab3tf version 0, packing instruction: 1. the supplier shall pack the final roof element in a suitably designed returnable fixture in such a way thatfinal roof element shall not get scratched, damaged, twisted during transportation, storage and lifting and to avoid scratches on outer surface. it should be wrapped with enviroment friendly material and it should have standard clamping /fastening mechanism so that it can be opened easily. it should have firm's identification mark. 2. first returanable fixture along with final roof element be retained by rcf & this fixture shall be exchanged in the second lot supply and so on. at the end of the contact, the firm shall collect the remaining returnable packing fixture from rcf. 3. the packing fixture/frame to be fabricated having sufficient strenght to bear approximate 1 tonne load in static & moving condition of five coach set of final roof element. 4. the fixture /frame/pallet should be designed so that the packed final roof element preferably remain in horizontal position to minimize surface area. 5. it should also be suitable for storage of final roof element under open sky. [ warranty period: 30 months after the date of delivery ]
Tender For supply of b veh spares d d - parts kit slave cylinder clutch , sleeve cylinder repair kit minor , repair kit mechanical transmission , master cyl power unit clutch master , arm wind screen wiper s a of wiper arm , rear view mirror , filter element , head lamp f 804390 , head lamp , horn electrical , door lock assy rh , door full handle assist handle , regulator assy rh window winding rh , roof marker lamp rh
Tender For supply of lwsczac shell kit 534 a one coach set of roof, sidewall and end wall for lwsczac 534 1. roof assembly to drg no 53416001, alt 'c' - 1 no, 2. final roof element cpl to drg no. 87716014, alt 'e' - 2 nos. 3. final roof element cpl to drgno. 87716015, alt 'e' - 2 nos. 3. side wall to drg no. 53414001, alt 'd' - 1 no. 4. endwall to drg no 59315007, alt 'b' - 2 nos. firm shall fulfill the manufacturing facility as per icf/md/spec-200, issue status-01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/spec-315, issue status-01,rev.00, with amendment no 01. b one coach set of welding parts on body shell and partition frames for lwsczac coaches to drg. no. 1. (lwsczac) 53410002, alt 'b' - 1 no. 2. (lwsczac) 53410054, alt 'l' - 1 no. 3. 58110016, alt 'a' - 6 nos. 4. 58110015, alt 'a' - 3 nos. 5. aaa10972, alt 'a' - 3 nos. 6. aaa10976, alt 'nil' - 1 no. 7. aaa10977, alt 'nil' - 1 no. 8. aaa10978, alt 'nil' - 1 no. 9. aaa10979, alt 'nil' - 1 no. 10. aab10007, alt 'a' - 4 nos. 11. aaa10963, alt 'nil' - 2 nos. 12. ssa10018, alt 'nil' - 3 nos. 13. aaa10967, alt 'nil' - 1 no. 14. ssa10021, alt 'nil' - 2 nos. 15. 58110017, alt 'c' - 2 nos. 16. aaa10970, alt 'nil' - 4 nos. 17. aaf10937, alt 'nil' - 3 nos. 18. (lwsczac)53410001, item.25, alt 'r' - 12 nos. 19. aab10014, alt 'nil' - 4nos. c under frame arrangement to drg no. 85111001 col 1. alt 'p' - 1 no. firm shall fulfillthe manufacturing facility as per icf/md/spec-147, issue status 01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'e'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe should be supplied as normal side up & side bearer side down. packing conditionas per icf/j&t/sk-1865, alt 'a'. (a) raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item ]