Web Analytics Made Easy - StatCounter

Rotating Machine Tenders

Get complete information related to latest Rotating Machine Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Rotating Machine Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Rotating Machine Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :45716595 Due date: 13 Jul, 202613 Jul, 2026 4.50 Lacs
Tender For supply of fabrication c c - damaged washing pipeline nipple flange band on pan no 6 3 , replace damaged washing pipeline nipple flange band on pan no 6 4 , install valve in steam line at pan no 2 550 mm 1 , install valve in steam line at pan no 2 550 mm 2 , install valve in steam line at pan no 2 550 mm 3 , install valve in steam line at pan no 2 550 mm 4 , replace nipple and band of a heavy tank 2 , replace nipple and band of a heavy tank 3 , replace nipple and band of a heavy tank 4 , remove clean and reinstall 4inch size syrup line on pan , cut and remove syrup header and fabricate and install new header , replacing the 6inch size glycol washing line fitted on pan no 1 , replacing nipples of different lines of pan no 6 1 , replacing nipples of different lines of pan no 6 2 , replacing nipples of different lines of pan no 6 3 , replacing nipples of different lines of pan no 6 4 , replacing 10inch size nipples of cut off line of pan no 6 1 , replacing 10inch size nipples of cut off line of pan no 6 2 , replacing 10inch size nipples of cut off line of pan no 6 3 , replacing 10inch size nipples of cut off line of pan no 6 4 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 1 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 2 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 3 , replacing corroded hot water pipeline nipples flanges valves in pan no 4 4 , fabricating m s bed for syrup pump and motor fitting and alignment followed by satisfactory trial , dismantling weak condensate bottle of old set , replacing weak pipeline flange valve and band of old set vertical juice heater 1 , replacing weak pipeline flange valve and band of old set vertical juice heater 2 , replacing weak pipeline flange valve and band of old set vertical juice heater 3 , replacing weak pipeline flange valve and band of old set vertical juice heater 4 , replacing weak pipeline flange valve and band of old set vertical juice heater 5 , replacing weak pipeline of old quad set no 4 1 , replacing weak pipeline of old quad set no 4 2 , replacing weak pipeline of old quad set no 4 3 , replacing weak pipeline of old quad set no 4 4 , replacing weak pipeline of old quad set no 4 5 , dismantling damaged mesh of section pipe located at injection no 2 and 3 and making a new one from given m s plate and fitting it , cutting and discarding old damaged reducer plate of section pipe located at injection no 2 and 3 and remaking the same , fitting water line from overhead to service tank 1 , fitting water line from overhead to service tank 2 , details of work of canti machine no 6 and 7 1 , details of work of canti machine no 6 and 7 2 , details of work of canti machine no 6 and 7 3 , details of work with new pipes from s sugarbin 1 , details of work with new pipes from s sugarbin 2 , details of work with new pipes from s sugarbin 3 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 1 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 2 , details of work for kcp no 1 and 2 and canty machine no 6 and 7 3 , work on hot water line of brown sugar magma 1 , work on hot water line of brown sugar magma 2 , work on hot water line of brown sugar magma 3 , work on hot water line of brown sugar magma 4 , cutting and removing damaged monitor casing and ribs , cutting and removing damaged center shaft and arms inside kcp machines no 1 and 2 bending and fitting new parts with 8 to 10 mm plate , dismantling damaged upper cover part of canty machine no 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections , dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick //bid details 2 / 117 / / 1 1 /item category plate and depositing scrap in scrap yard , dismantling damaged plate of sugar discharge chute from sugar elevator to sugar grader and fabricating and fitting new pl

Central Government/Public Sector

CTN :45671105 Due date: 29 Jun, 202629 Jun, 2026 NA
Tender For krynic0113-supply of parts of rotating machine condition monitoring and analysis system rmcmas

CTN :45614057 Due date: 02 Jul, 202602 Jul, 2026 NA
Tender For supply of printing articles - sugar cane weighment trollypurchi on centurimake computer printing paperhaving size 10”x12”x2(part-2) original in redcolour and duplicate ingreencolour, four purchi will be printed on one sheetstrictly, with carbon as per our specimen, sugar cane weighment trollypurchi on centurimake computer printing paperhaving size 10”x12”x2(part-2) original in blue colour and duplicate in greencolour, four purchi will be printed on one sheetstrictly, with carbon as per our specimen, "sugar cane weighment purchi book for early varity containing 50 slips/purchi in each book in quadru- plicate i.e.200 purchi/leaves in each book in four different paper i.e. original – light green, duplicate-white, triplicate – yellow colour paper and quadruplicate – pink paper respectively. markedoriginal-for payment, duplicate groewrs, triplicate-for mill record and quadruplicate – for society (allprinted and perforated) correct/proper perforating must be done by perforating machine. the number should be printed automatically along with printed matters. size of book 7”x4.5”.it should not be dec-reased after binding/perforating. the book should be printed in vertical shape. the book will be printed 31 centers and the name of the center for a whichbookare meant, will be printed as per annexure – a enclosed. printing of above book will be made by making bock only. the particular center will be printed through letter press by composing. (as per our specimen) as per list.", summery of rules (both side printed having) size16”x 12” as per sample, shift wise crushing repot (10 am to 10 am) containing 50 leaves in each pad on white paper having size- 10”x7”., inspection pad containing 50 leaves in each pad on white rice paper having size 7” x 13” all perforated, weigh bridge checking register containing 30 leaves in i each pad on white paper having size 12” x 7.5” both side and both side gatta binding., daily cane indent pad containing 100 leaves in i each pad on white paper having size 8” x 6” for following society the pad will be printed as per our specimens, doiwala, dehradun, jawalapur, iqbalpur(roorkee), ponta valley, ponta sakumbari, laksar, appendix.iiibook containing 100 leaves in each pad on white paper having size- 12”x7.5”., authority pad containing 100 leaves in each pad on white paper having size- 10”x7.5”., nomination pad comtaining containing 100 leaves in each pad on white paper having size- 6”x 8”., token receipt ledger containing 220 page in each,ledger on ledger paper having size 12x8” serially numbered and canvas binding., licence for empployee pad containing 100 leaves in each pad on white paper having size 6"x8", engineering department mill house log book containing 180 folio in each ledger on ledger paper having size 20” x 15” serially numbered and canvas binding., mill turbine and boiler feed pump log book containing 180 folio in each ledger on ledger paper having size 15” x 10.5” serially numbered and canvas binding., power turbine log book containing 180 folio in each ledger on ledger paper having size 17” x 14” serially numbered and canvas binding, 2500 kw. alternator log book containing 180 folio in each ledger on ledger paper having size 18.5” x 15” serially numbered and canvas binding, fiberizer turbine log book containing 180 folio in each ledger on ledger paper having size 15.5” x 12.5” serially numbered and canvas binding, d g set log book containing 180 folio in each ledger on ledger paper having size 26" x 16.5". serially numbered and canvas binding, boiler log book containing 180 folio in each ledger on ledger paper having size 42 x 56 cm. serially numbered and canvas binding., manufacturing department daily juice analyses sheet on ledger paper having size 22.5” x 17.5”, pan slip pad containing 100 pages in each pad on leadger paper having size 7" x 4.5" , stock register containing 300 folio on each ledger on ledger paper having size 8" x 13" serially numbered from 1 to 300 and canvas binding, pan graph

Central Government/Public Sector

CTN :45622740 Due date: 29 Jul, 202629 Jul, 2026 NA
Tender For supply of cleaning solvent for electrical rotating machines of diesel locomotives.rdso spec no mp.0.8000.01,rev-03,may 2021[quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]

CTN :44905801 Due date: 25 Jun, 202625 Jun, 2026 NA
Tender For corrigendum : spot balancing for rotating machineries

Central Government And Public Sector

CTN :45567203 Due date: 25 Jun, 202625 Jun, 2026 NA
Tender For supply of cleaning solvent for electrical rotating machines of diesel electric locomotives as per rdso specification no. specification no. mp.0.8000.01, (rev. 03) issue date: may 2021. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]

CTN :45545867 Due date: 05 Aug, 202605 Aug, 2026 NA
Tender For supply of machine condition analyzer for detecting condition of rotating machines & bearings through measurement of vibration as per annexure. it shall be portable and hand held. make shall be m/s. skf model no. cmas-100 sl with charger manual or m/s. uni-t model ut-312 or item to be procured from oem or its authorized dealer alongwith authorization certificate. firm to submit dealership certificate. make: skf / uni-t / any reputed make (firm those who have credential for the same or equivalent item). [ warranty period: 30 months after the date of delivery ] ]

CTN :45547342 Due date: 06 Jul, 202606 Jul, 2026 NA
Tender For supply of cleaning solvent for electrical rotating machines of diesel locomotives. rdso spec no. mp.0.8000.01 (rev. 03), may 2021 [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variationpermitted: max 8 lacs ] ]

CTN :45490340 Due date: 17 Jun, 202617 Jun, 2026 NA
Tender For dynamic balancing of rotating machineries

CTN :45057581 Due date: 04 Jun, 202604 Jun, 2026 9.50 Lacs
Tender For corrigendum : supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bot
 Loading, Please wait...

Connect us via What's Up