Get complete information related to latest Rotor Assembly Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Rotor Assembly Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Rotor Assembly Tenders.
Tender For supply of atlas copco make spares -rotorassembly,u/n:1314162633,gt063l1l1,atlascopco (india) pvt ltd , high speed bearingset,u/n:1314162613,gto63l1l1,atlas copco (india)pvtltd
Tender For repair/maint of air cooled ac plants, chiller, condenser pump, hot water boiler, ahu, water colled ac plants, motor, hwg and ahu alongwith connected items at akash complex/tech area at dappar under age(i) dappar - material and labour for servicing / cleaning of air cooled ac plants of 50 tr capacity, chiller unit, cleaning and washing of cooling coil with fins using a chemical c-shine (alkaline coil cleaner and brightener) and testing the unit (once in a three months) complete all as specified and as directed by engineer-in-charge. location :- akash air cooled ac plants(once in a three months), material and labour for descaling of complete condenser units for central/ package type ac plants of condenser unit of water cooled ac plantac plant upt to 40 tr capacities by means of adding descaling chemical solution (hcl) or equivalent into the cooling tower sump as per requirements, and running the plant pump continuously till all the scale of pipes/shell are removed including removing side covers of condenser and cleaning the water tubes by means of nylon brushes till the scaling is removed and refixing of covers including replacement of neoprene rubber gasket and refixing pipe connection etc. to entire satisfaction of engineer-in-charge complete all as specified and as directed by engineer-in-charge. location :- old, 3ac igloo ac plant and new ac plant (once in a three months), material and labour for cleaning of cooling tower existing size, water basin and makeup tank with the help of chemical and nylon brush, removing and refixing of pvc finches after washing, cleaning of condenser pipe line ( inlet and outlet) including painting of out side of cooling tower with inlet and outlet pipe line with one coat synthetic enamel paint of colour approved by engineer in charge and inside painting of water tank of cooling tower using water proof black japan paint one coat including changing of unserviceable pvc guard, water distibutor, pvc pipe, and all connected minor items of up to 100 tr capacity of the ac plants at different locations complete all as specified and as directed. location :- old and new ac plant, material and labour for servicing of cooling coils and air filters of ahus intalled at air conditioning plant by removing air filters and fixing after cleaning with air blower and water and cleaning agent , cleaning of cooling coilwith wire brush and air blower and water spray pump after spraying scale gun or equivalant chemical suitable for aluminium fins and straighting the fins of cooling coil by using suitable brush for any capacity of ahu complete all as specified and as directed by engineer-in-charge. locaton :- new ac plant, old ac plant , 3 ac igloo ac and akash ac plants akash, material and labour for servicing / cleaning and testing of electrically operated pan type humidifier capacity 9 kw alongwith all necessary items fitting and all suitable / all necessary electrical wiring from electrical panle to humidifier complete all as specified and as directed by engineer-in-charge. location :- akash ac plants, material and labour for servicing / cleaning and testing of pressurization unit in cold water line ( psu-225 as per site) alongwith all necessary items fitting and all suitable / all necessary electrical wiring complete all as specified and as directed by engineer-in-charge. location :- akash ac plants, material and labour for servicing / cleaning and testing of pressurization unit in hot water line ( psu-225 as per site) alongwith all necessary items fitting and all suitable / all necessary electrical wiring complete all as specified and as directed by engineer-in-charge. location :- akash ac plants, material and labour for servicing , cleaning , and greasing , chiller , hwg pumps , ahu and ct motors alongwith all necessary minor items/ fitting i.e bearing , star coupling , screws , nuts and bolts etc complete all as specified and as directed by engineer-in-charge. location :- new ac plant , old ac plant and air coole
Tender For removal and replacement of rotor shaft bearing assembly of pa fan # 2b with spare assembly fixing of all blades and complete alignment of fan and motor for pa fan # 2b of unit -2 boiler with all t&p and consumables including removal and refixing all insulation works
Tender For procurement of spares for booster pump for sgtpp - procurement of procurement of spares for booster pump for sgtpp., rotor assy. booster pump-fa1b75 for mdbfp of 500 mw , (balanced condition), set contain one shaft, one impeller, impeller neck ring-02 nos, thrust collar, coupling key, pump drg. no- ( drg. no-hy-dg-373-139-a017 moc-shaft-bs-en-10250-4, impeller-bs-en-10213-2, impeller wear ring-bs-en-10213-2, approximate dimension- impeller od-753 mm, impeller width from neck to neck-246, impeller neck od-300 mm, neck id-265 mm, neck width-45 mm, shaft dia at impeller position-84.85 mm, no of vains-06. approximate shaft length-1725 mm, shaft run-out should be within 0.05 mm. for mdbfp , direction of rotation-anti clowise viewed from non-drive end. rotorassembly should be in balanced condition. balancing document should be submitted during delivery. all give dimensions are approximate & actual dimensions must be at per give drawing no. ), impeller for booster pump-fa1b75, for booster pump of 500 mw. , part no-2 , pump drg. no-hy-dg-373-139-a017, moc- bs en 10213-2 ( in balanced condition. balancing document should be submitted during delivery. moc-impeller-bs-en-10213-2, approximate dimension- impeller od-753 mm, impeller width from neck to neck-246, impeller neck od-300 mm, neck id-265 mm, neck width-45 mm, shaft dia at impeller position-84.85 mm, no of vains-06. all give dimensions are approximate & actual dimensions must be at per given drawing no. ), shaft for booster pump-fa1b75 for booster pump of 500 mw. , part no-5 , pump drg. no-hy-dg-373-139-a017, moc-bs en 10250-4 or equivalent ( shaft run-out should be within 0.05 mm. moc-shaft-bs-en-10250-4, approximate shaft length-1725 mm, all give dimensions are approximate & actual dimensions must be at per give drawing no. ), impeller nut, booster pump-fa1b75 for booster pump of 500 mw , part no-13, pump drg. no-hy-dg-373-139-a017, nut thrust collar for booster pump-fa1b75 , pump drg. no-hy-dg-373-139-a017, casing wearing ring, f-m/cd-bp-fa1b75 for booster pump ( moc-fv 520 b (13% cr. steel). approximate dimension od-340 mm, id-320 mm, width-45 mm, all give dimensions are approximate & actual dimensions must be at per give drawing no. ), wearing ring,impeller,fa1b75 for booster pump fa1b75 ( moc-bs-en-10213-2, approximate dimension od-320 mm, id-300.20 mm, width-45 mm, all give dimensions are approximate & actual dimensions must be at per give drawing no. )
Tender For tender for remove the worn out runners from the main bagasse carrier bagasse elevator and return bagasse carrier errect 8x65 10x50 mm flat iron bars in their place clean the welded areas using a grinder , cut and remove the worn out bottom plates of the main bagasse carrier bagasse elevator and return bagasse carrier errect new 6 8 10 mm , cut and remove the worn out side plates of the main bagasse carrier bagasse elevator and return bagasse carrier errect 6 8 10 mm plates satisfactory trial run , cut out and remove the damaged and weak sections of the main bagasse carrier fabricate and errect a new assembly including the gear shaft system using the supplied plate , cut out and remove the weak and corroded sections of the bagasse feeding chutes errected boilers fabricate and replacements using the provided plates and repair the associated shafts and gears , the casings of the boiler id and fd fans have become severely weakened and damaged the task involves cutting away and removing the weakened sections fabricating , cut and remove the deteriorated side bottom and top plates surrounding the air heater of boiler no. 3 fabricate and errect new plates using the specified 6 8 mm plate in their original positions , fully strengthen the air heater plates and conduct a satisfactory trial. , dismantling the old air heater tubes of boiler no. 01 size 63.5 mm od x 2.64 mm thickness fabricating and errecting new tubes in accordance with the drawing , dismantling the old air heater tubes of boiler no. 02 size 63.5 mm od x 2.64 mm thickness fabricating and errecting new tubes in accordance with the drawing , dismantling the old air heater tubes of boiler no. 03 size 63.5 mm od x 2.64 mm thickness fabricating and errecting new tubes in accordance with the drawing , a. dismantling old columns beam channels etc. b. manufacturing and installing new columns beam channels , installing 16 inch 18 inch manholes with blinds , constructing a bed for the pump fitting the pump and motor and conducting a trial run of up to twenty hp , dismantling fabricating and erecting weak corroded pipe lines up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting weak corroded tees up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting weak corroded nipples up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting a weak throated cross member up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting a weak throated band up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting a weak throated flange up to 12 and providing satisfactory leak proof trials. , dismantling fabricating and erecting a weak sloping reducer up to 12 and providing a satisfactory leak proof trial. , removing the old corroded platform and replacing it with a new one
Tender For supply of 20 ton isgec make boiler id fan balancing work , 20 tonisgecmake boiler fd fan balancing work , leveller cutter balancing work 250 hp motor plumber block etc. , chopper balancing work 60 hp motor plumber block etc , hot and cold blower of hopper bagacillo fan blower