Get complete information related to latest Safety Case Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Safety Case Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Safety Case Tenders.
Tender For bid to ras supply of paint brush half inch 13 mm , twine sewing medium flax , paint brush 3 inch , funnel 5 inch , polythene bag 14x18x75 micron , tape measuring steel 15 meters in metallic case , gash bag 24x30x75 micron , bucket plastic 20 ltrs capacity , bucket plastic 15 ltrs capacity , soap hard yellow , polythene bag 14x20x75 micron , brush scrubbing large hard brush , paint brush 1 inch , twine flax sewing fine , pad lock 40 mm brass , pad lock 7 levers brass navtal , heat resistant gloves for galley , rubber latex long gloves , safety gloves , tape sounding dip heavy weight 15 mtr length , bag biodegradable medium 14 inch x 18 inch , bag biodegradable small 14 inch x16 inch , bag biodegradable big 14 inch x 20 inch , gloves leather a , brush scrubling large hard brush , paint brush half inch 13mm , brush steel wire , twine sewing fine 100 grams roll , measuring tape 15 mtr , stretch packing polythene sheet on handle core 50cm width 20 mtrs roll , heat resistance gloves for galley ) /bid number : gem/2026/b/7308837 * /dated: 17-03-2026 & & / bid document 1 / 29
Tender For 1)inspection of stator coil for identification of exact no. of the faulty coil and setting up the arrangements for rotor pole coils removing and rotation as per scope of works along with supply of materials and other consumables as per scope of works2)de-brazing the rotor pole terminations and removing the rotor poles (as required). dismantling of rotor poles using suitable and compatible tools, fixtures, and lifting arrangements. ensure safe handling and proper marking for reassemble. rotate and position the rotor appropriately to access the damaged stator coil area.3)remove insulation from both ends of the affected winding section.4)de-brazing of defective coils. 5)driving out the slot wedges carefully remove wedges from stator winding slots without damaging adjacent coils or core.(entire stator winding shall be inspected in case of loose wedges, worn out wedges and missing wedges shall be replaced) along with supply of materials and other consumables.6)insulation removal- remove insulation from both ends of the affected winding sections.7)cutting the coil bindings in both sides. cut the identified damaged winding portion using appropriate tools. carefully pull out the damaged coil from the stator slots without affecting surrounding windings.8)damaged winding cutting- cut the identified damaged winding portion using appropriate tools.9)winding extraction- carefully pull out the damaged coil from the stator slots without affecting surrounding windings. while removing the faulty coils from stator, utmost care should be taken to prevent any damage to stator core.10)removal of faulty coils from the slot.11)slot cleaning and preparation-clean stator inner tooth slots thoroughly. use emery paper to smoothen and maintain uniform slot condition.12)cleaning of carbon deposits/heavy oil content from complete stator coils through co2 cleaning process /dry ice blasting.13)new coil installation-insert new stator coil with proper alignment. fix securely using new wedges of appropriate grade and size.14)brazing of the coil ends.15)re-fixing the rotor poles and connecting them.16)insulation application-apply insulation as per specified class (e.g. class f/ classh). ensure proper curing and finishing.17)complete co2 / dry ice cleaning of stator and rotor.re insertion of removed rotor poles. 18)final checks & testing- insulation resistance (ir) test, high voltage (hvdc) test, continuity check, visual inspection and any other tests which are required (will be carried out by kpcl).19)assembling of removed damper doors and stator covers.20)maintain quality standards throughout the process & use calibrated tools and approved materials.21)presence of the agency during excitation and synchronization of the unit by kpcl.22)safety & quality-follow all safety procedures and ppe requirements
Tender For supply of safety plate for gear case gauge glass as per ecor drawing no. els/vskp/2018/43. [ warrantyperiod: 30 months after the date of delivery ]
Tender For auction sale of pway scrap - 1)condemned u/s cl.iii weighment rails - 1)cms crossing 52 kg - 2 nos, 2)check rail 52 kg - 5 nos, 3)tongue rail 52 kg - 6 nos, 4)glued joint 52 kg - 14 nos. quantity - 10.631 mts. ds8 no.932038 dt.12-01-2026. location - at tambaram yard, back side of rri cabin and opposite to railway quarters no. 412a and 417. 2)a)cms crossing(52kg/60kg) - 11 nos, b)check rail (52kg/60kg) - 21 nos, c)tongue rail (52kg/60kg) - 22 nos, d)glued joint (52kg/60kg) - 31 nos. quantity - 35.731 mts. ds8 n0. 932035 dt. 12.01.26. location - at tambaram yard - km tbm/1054 - tbm/f33. total quantity - 46.362 mt. note- 1]delivery to be made on actual weighment basis. 2]when crane loading is not possible, the purchaser [by engaging his own labourers] is permitted to cut rails to loadable sizes of not less than 150 kgs. 3] in case of excess on weighment of loaded lorry, purchaser [by engaging his own labourers/vehicle] has to cut/unload the excess quantity , handover the same to the custodian on a separate vehicle to the actual location or near to the weigh bridge as per the direction of custodian. 4)any type of road vehicle is permitted for loading of lot material. however, depending upon the lot location, on the date of delivery, the custodian shall decide on granting such permission, strictly observing all prescribed safety precautions. 5)any clarification in location/ ds8 no & date - udm ds8/manual ds8/inspection report may be reffered with custodian(lot quantity column in catalogue/do is authentic. 6) purchaser has to ensure that lorry, crane , labour are arranged well in advance before effecting inventory of the lot(wherever applicable). 5)custodian should arrange to issue hard copy(phostat) of do , ds8s, etc.,(only essential documents) to all witnessing officials at the do location before taking inventory. purchaser is not responsible for handing over of do/ds8 copies. 7)nfs - as per udm/manual ds8/lot inspection report. any other attachment, to be cut and hand over to custodian. any other nfs material in the lot other than items earmarked for sale, should be handed over to custodian at the time of delivery.