Get complete information related to latest Safety Sling Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Safety Sling Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Safety Sling Tenders.
Tender For supply of safetysling & d-shackle for traction motor of wag9 loco. one set consist of (i) safetysling dia 12mm, 1810 +/-3mm long qty=04 nos. as perdrg no. skel-4859, alt-1 or latest(ii) safetysling dia 12mm, 1510+/-3mm long qty=08nos. as per drg. no. skel-4859, alt-1 or latest and (iii) d shackle for safetysling arrangement qty= 12nos. as per drg. no. skel-5007, alt-nil or latest. [ warranty period: 30 months after the date of delivery ]
Tender For supply of set of safetyslings assembly used for locos wap-7 as per drawing no. 1209-01-416-065 alt.one set consists of 3 items: 1) sling wire rope-01 no., 2) plate-01 no 3) plate 01 no. to be procured from clw approved source only. [ warranty period: 30 months after the date of delivery ]
Tender For supply of set of safetysling arrangement for hanger lever for wap-7 loco. one set consists of 04 items 40 nos as per drg. no. 1209.01.416.066. ]
Tender For supply of modified safetysling arrangement for wap-4 loco inner hanger as per drg.no. a2/05/cnb/2104/5038/bg-alt-"b",ref - 1 to 10. [ warranty period: 30 months after the date of delivery ]
Tender For supply of set of fixing slings for push pull rod (traction bar) for 3 ph. locomotives consisting of 02 items. 1.safetysling as per s.c.rly. drg no- c/els/lgd/bogie/4/120. ref.no.1.qty 02 nos. 2.safetysling as per s.c.rly. drg no- c/els/lgd/bogie/4/120. ref.no.2-.qty 02 nos. [ warranty period: 30 months after the date of delivery ]
Tender For supply of safetysling arrangement for hanger lever for wag-9hc & wap7 loco to drg no. 1209-01.416-066 (each set is a loco set consisting of 04 items as per annexure. dimension mentioned in the part drg no. 1209-01.416-063 alt-1,2 to be ignored. [ warranty period: 30 months after the date of delivery ]