Get complete information related to latest Sandwich Mounting Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Sandwich Mounting Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Sandwich Mounting Tenders.
Tender For supply of bonded rubber sandwichmounting unit for nose suspension of traction moter of electric loco as per rdso drg. no.skel4997 alt-0. specn no. rdso/2014/el/spec/0115 [rev. 0 ]
Tender For design, development, supply, installation (including civil work such as machine foundation work etc.) and commissioning of hydraulic sandwichmounting testing machine along with digital load indicator and digital length measurement device and computerized load deflection graph plotting facility. (refer technical specification attached herewith). [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of bonded rubber sandwichmounting unit for nose suspension of traction motor of electric loco as per rdso drg no- skel-4997, alt-0 , spen. no. rdso/2014/el/spec./0115 (rev.-0) dt- 22.08.14. [ warranty period: 30 months after the date of delivery ]
Tender For supply of multiple bonded sandwichmounting for traction motor 4303dy/4303by.(for 1400hp demu/memu). as per bhel's drawing no. 24391528001 v00. [ warranty period: 30 months after the date of delivery ]
Tender For design, development, supply, installation (including civil work such as machine foundation work etc.) and commissioning of hydraulic sandwichmounting testing machine along with digital load indicator and digital length measurement device and computerized load deflection graph plotting facility. (refer technical specification attached herewith). [ warranty period: 30 months after the date of delivery ]
Tender For multiple bonded sandwichmounting as per bhel drg. no. 24451503007 rev. 09 var 00. - description: im3601 - multiple bonded sandwichmounting as per bhel drg. no. 24451503007, rev. 09, var 00. please note s.no. supp identification & mmyy to be marked on each job. manufacturing date should be within 3 months from supply date.