Web Analytics Made Easy - StatCounter

Sea Water Pump Tenders

Get complete information related to latest Sea Water Pump Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Sea Water Pump Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Sea Water Pump Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :43238600 Due date: 26 Dec, 202526 Dec, 2025 5.91 Lacs
Tender For providing maintenance of electrical installations, electrical fixtures like tubelights, ceiling fans, geysers, exhaust fans, mcbs,mcb dbs, lt panel boards, lift panels, street lights, lift head rooms, pump rooms to krishna & sharavathi blocks, ngv complex at koramangala bangalore for the year 2025-26. (cat-ii(a))

State Government

CTN :43301758 Due date: 10 Jan, 202610 Jan, 2026 NA
Tender For design, supply, installation, testing and commissioning of multi stage split case/centrifugal pump coupled with squirrel cage induction motor and its allied accessories for lift irrigation scheme from drass river to kurtiyal bhimbat and choky.

corporations/Associations/Others

CTN :43287647 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin

corporations/Associations/Others

CTN :43287648 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 2f and reassembling the dismantled spares in mill 1c - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin

State Government

CTN :43297214 Due date: 01 Jan, 202601 Jan, 2026 63.92 Lacs
Tender For manning operation and maintenance of substations, pump houses, jack wells in stage-1 halasabalu, stage-2 mallashettihalli & haluvarthi and monitoring of raising / gravity pipelines up to terminal tanks in rajanahalli lift irrigation scheme in davanagere dist. under knnl for the year 2025-26

Central Government/Public Sector

CTN :43109679 Due date: 26 Dec, 202526 Dec, 2025 NA
Tender For corrigendum : procurement of mechanical seals for hfo 1st lift pump of stg-i ntpc kahalgaon

State Government

CTN :43268539 Due date: 29 Dec, 202529 Dec, 2025 28.03 Lacs
Tender For painting works of firefighting system, cooling water pipe line, motor , station transformers and sfc transformers at rblis lift-ii stage-i, stage-ii pump houses

CTN :43306479 Due date: 03 Jan, 202603 Jan, 2026 NA
Tender For supply of repair flt 5 ton 171071 -repair oblique maint of flt s no 171071 , parts of vehicle to be replaced , stop cable , fuel pipe intake and return pipe set , accelerator cable , fuel filter set , hose pipe set , air filter set , engine oil , exhaust bellow spring , coolant , grease , oil filter , rubber packing for engine cover , hub packing kit , shaft seal kit , hydraulic oil , brake fluid , hood cover with fixing arrangement , engine cover lift pump , brake shoes set complete , maintenance and labour work required , changing of engine oil brake fluid , brake bleeding , greasing of wheel hub and lifter chain , servicing of vehicle , repair of oil chamber complete , adjustment of clutch , caliberation of injector nozzle , taking and bringing back the vehicles to ge ep jodhpur and testing of vehicles upto the entire satisfaction

CTN :43270513 Due date: 02 Jan, 202602 Jan, 2026 NA
Tender For supply of hp seal water pump for ash handling system.

CTN :43322558 Due date: 31 Dec, 202531 Dec, 2025 3.52 Lacs
Tender For operation and maintenance of sub-station equipment, dg set, ac units, fire alarm system and passenger lifts at ag ap & telangana, hyderabad during the year 2025-26. sh:- operation & maintenance of all electrical & mechanical services, annual maintenance of specialized services such as 11kv substation, operation of dg set, pump sets, fire alarm system & passenger lift. sh: providing hvls fans in the open auditorium.subwork/packages:sh: providing hvls fans in the open auditorium
 Loading, Please wait...

Connect us via What's Up