Get complete information related to latest Semi Fowler Bed Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Semi Fowler Bed Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Semi Fowler Bed Tenders.
Tender For supply of gynecological examination couch (v2),drip stand (full metal steel),crash cart (full metal steel, 150mm locable castors),icu bed with mattress (mechanical control),delivery bed (full metal steel frame),cylinder carrying trolley (full metal steel),bio medical waste (full metal steel bin),sofa set leatherrete cushioning 3+ 2
Tender For tender for supply of furnitures to igich-new building - 2025 - weighing scale, visitor chairs,., conference table,., cardiac table,., reception counter modular, oxygen trolley, foot step, examination table, modular office workstation, six in one lockers, lab chairs with rotatable wheels, slide storage cabinet, phlebotomy chairs and couches, cushion stool with back rest, glass door cupboard (book shelves), three in one chairs, trolley ss, slippers stand, medicine trolley., close type rack, cupboards steel., procedure bed with screen/examination bed (table), trolley bed (stretcher), wheel chairs, crash cart trolley., patient sitting stool/chairs, patient inbuilt cupboards, bed side lockers deluxe, doctors lockers, semifowlers bed, fowlers automatic emergency ward bed(3 function bed), fowlers automatic emergency ward bed(5 function bed), patient cot (pediatric), round table, tables, doctors chairs, consultant chairs/office chairs/ex.chairs
Tender For corrigendum : request for bids for supply, installation and commissioning of slaughter house plant as per apeda standard - a: civil work items, dismantling the reinforcement cement concrete (r.c.c.) work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete., dismantling brick masonry in lime or cement mortar and stacking the material as directed with all leads, lifts etc., removing doors and windows with frames and stacking the materials as directed with all leads, lifts etc. complete., removing ventilators and small windows with frame and stacking the materials with all leads, lifts etc. complete., removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete, removing purlins from roof including stacking as directed with all leads , lifts etc. complete., removing rafters from roof including the materials as directed with all leads , lifts etc. complete., removing queen post truss from roof and stacking the materials as directed with allleads and lifts etc. complete, removing galvanized iron (g.i.) or asbestos cement (a.c.) sheet roofing including purlins, principal rafters etc. including sorting serviceable and unserviceable materials, stacking the same as and where directed in the compound including scaffolding etc. complete., excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.5 m.) by mechanical means, lift upto 1.50 m, excavation for foundation in hard murum including removing the excavated material upto distance of 50 meters beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.50 m) by mechanical means, lift upto 1.50 m, excavation for foundation in hard murum including removing the cubic meter (cu.m) excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift from 1.5 to 3.0m.) by mechanical means, excavation for foundation in soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (lift from 1.5m to 3.0 m.) by mechanical means, lift upto 3.0 m, excavation for foundation in hard-rock by blasting including cubic meter (cu.m) trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramming etc. complete. (lift from 1.5m to 3.0 m) by mechanical means, filling in plinth and floors with approved excavated materials available at site in 30 cm layers include- ing watering and compaction with plate compactor to required proctor density etc complete., filling in plinth and floors with contractors material/brought from outside and approved by engineer in charge in layers of 15 cm to 20 cm including watering and compaction etc. complete., providing dry trap / granite / quartzite gneiss 200 mm thick hard core metal spread in two layers each of 125mm thick crushed to 100 mm c
Tender For corrigendum : supply, installation and commissioning of instruments in kanjhari irrigation project under drip-ii - uplift pressure meter(mechanical type), casagrande porous tube piezometer(manual type, 30 mtr max height of the dam), read out unit for piezometer, surface base plate settlement system, v notch(mechanical type), drilling and back filling for installing piezometer and surface settlement marker(both rock and soil). piezometer at dam top & d/s berms, settlement markers on dam top, civil works to prepare lining for installation of v-notch, fencing and civil work for safeguard the piezometers. minor civil work for preparing the bed and fencing(construction of small platform 0.5 x 0.5 x & 08/0.9 m height steel/gi mesh barricade and with one gated gantry point), installation charge